Dead-end pages

From GlueXWiki
Jump to: navigation, search

The following pages do not link to other pages in GlueXWiki.

Showing below up to 500 results in range #1 to #500.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. (12-6-06)
  2. (revised version as of 4-25-2014)
  3. 03/27/2020
  4. 03/31/2020
  5. 04/01/2020
  6. 04/08/2020
  7. 04/11/2020
  8. 04/15/2020
  9. 04/21/2020
  10. 04/28/2020
  11. 05/06/2020
  12. 05/20/2020
  13. 05/27/2020
  14. 06/11/2020
  15. 06/17/2020
  16. 07/07/2020
  17. 07/22/2020
  18. 07/29/2020
  19. 08/12/2020
  20. 08/19/2020
  21. 09/09/2020
  22. 09/17/2019
  23. 10/09/2019
  24. 10/13/2020
  25. 10/23/2019
  26. 11/10/2020
  27. 11/13/2019
  28. 11/27/2019
  29. 1250V Background Comparison
  30. 125 MHz Clock test
  31. 1GeV photons in TOF
  32. 2007-02-28
  33. 2007-03-21
  34. 2007-04-18
  35. 2007-05-09
  36. 2007-05-23
  37. 2007-07-11
  38. 2007-09-26
  39. 2008-04-09
  40. 2008-04-16
  41. 2008-05-21
  42. 2008-06-04
  43. 2008-06-18
  44. 2008-07-02
  45. 2008-07-16
  46. 2008-11-05
  47. 2008-12-03
  48. 2008 02 15 CDC Task List
  49. 2009-02-11
  50. 2009-02-25
  51. 2009-03-11
  52. 2009-03-25
  53. 2009-04-08
  54. 2009-04-22
  55. 2009-09-21
  56. 2009-10-08
  57. 2010-10-06
  58. 2011 Hall B Bcal Goals
  59. 2012 Software Review Closeout Notes
  60. 20140625 BCAL Timing
  61. 2015 October 14 DIRC Project Review
  62. 2017-01 recon ver02 plans
  63. 20200831 sdobbs PID notes
  64. 2020 Data Production
  65. 2020 Winter - 2021 Spring
  66. 2021-07-29
  67. 2022 Data Production
  68. 2023 Data Production
  69. 22 February 2008
  70. 2π0 simulation
  71. 35% drawing by IHEP provided in April/May 2007
  72. 55Fe vs cosmics
  73. ADC Peak Amplitude during the run period
  74. ADC data
  75. AMCDrawings Used for calculations
  76. ANSYS simulations
  77. ASIC design optimizations
  78. ASU polarimeter drawings
  79. Abbottd-info-needed-31-aug-2011
  80. Accelerometers with cheap Knocking sensor
  81. Access HMI screens through VNC
  82. Accessing the JLab Picture Archive
  83. Action Items
  84. Active Base Radiation Tests
  85. Active Collimator Interface Specification
  86. Active Collimator Preamplifier Cabling and Electronics
  87. Adding a new user
  88. Addressing ERR review recommendations
  89. After mass flow controller recalibration
  90. Agenda
  91. Agenda 060515
  92. Agenda 060609
  93. Alarms for voltages (Nerses)
  94. Alberta CFDs
  95. Alignment
  96. Alignment and Calibration
  97. Alignment data
  98. Alignment plots
  99. All modules (with SICCAS crystals) are removed
  100. Alternative readout
  101. Amorphous radiator/harp ladder requirements
  102. Analysis DParticleCombo
  103. Analysis Examples
  104. Analysis FAQ
  105. Analysis FAQ : Frequently Asked Questions
  106. Analysis JEventProcessor
  107. Analysis Miscellaneous
  108. Analysis Page
  109. Analysis Plan
  110. Analysis Shift Meeting Agenda, December 05 - December 07, 2021
  111. Analysis Shift Meeting Agenda, December 05 - December 11, 2021
  112. Analysis Shift Meeting Agenda, December 12 - December 18, 2021
  113. Analysis Shift Meeting Agenda, November 07 - November 13, 2021
  114. Analysis Shift Meeting Agenda, November 14 - November 20, 2021
  115. Analysis Shift Meeting Agenda, November 21 - November 27, 2021
  116. Analysis Shift Meeting Agenda, November 28 - December 04, 2021
  117. Analysis Studies Fall2016
  118. Analysis Studies Spring2017
  119. Analysis software wishlist from May 2020 CM
  120. Analyze Analysis Trees
  121. Andrei's recipe for BCAL Timing Calibration
  122. Annotated Git session using the sim-recon repository
  123. Apr. 14, 2008 Tracking CDC/FDC
  124. Apr. 4, 2008 Tracking CDC/FDC
  125. Apr 02,2020 Tech group meeting
  126. Apr 08,2020 Tech group meeting
  127. Apr 10,2020 Tech group meeting
  128. Apr 12, 2011 Calorimetry
  129. Apr 12, 2013 Design Meeting
  130. Apr 13,2020 Tech group meeting
  131. Apr 14, 2011 SiPM Electrical and Cooling
  132. Apr 15,2020 Tech group meeting
  133. Apr 15, 2010 Calorimetry
  134. Apr 16,2013 Readout
  135. Apr 16, 2009 Calorimetry
  136. Apr 17,2020 Tech group meeting
  137. Apr 18, 2013 SiPM Electrical and Cooling
  138. Apr 19, 2011 Readout
  139. Apr 20,2020 Tech group meeting
  140. Apr 21
  141. Apr 22,2020 Tech group meeting
  142. Apr 24,2020 Tech group meeting
  143. Apr 25, 2013 SiPM Electrical and Cooling
  144. Apr 26, 2013 Design Meeting
  145. Apr 27,2020 Tech group meeting
  146. Apr 28, 2011 SiPM Electrical and Cooling
  147. Apr 29,2020 Tech group meeting
  148. Apr 30,2013 Readout
  149. Apr 7
  150. Apr 7, 2011 SiPM Electrical and Cooling
  151. Apr 9, 2009 Readout
  152. Apr 9, 2024 HallD AI/ML meeting
  153. April 06, 2009 Tracking CDC/FDC
  154. April 07, 2022 CPP Design/Install Meeting
  155. April 08, 2013, Physics Working Group
  156. April 08, 2021 CPP Design Meeting
  157. April 09, 2024 KLONG CPS Design Meeting
  158. April 1, 2020 CPP Design Meeting
  159. April 1, 2022 Tech group SAD meeting
  160. April 1-7
  161. April 10, 2013 Tracking CDC/FDC
  162. April 11,2012 e-mail from Curtis regard RMP for Software Review
  163. April 11, 2011 (11:30AM), Physics Working Group
  164. April 11, 2014 Design Meeting
  165. April 12, 2010 (11AM), Physics Working Group
  166. April 12, 2011 SiPM Electrical and Cooling
  167. April 12, 2023, FCAL Insert Installation Meeting
  168. April 13, 2009 (11AM), Physics Working Group
  169. April 13, 2012 Fab Meeting
  170. April 13, 2023
  171. April 14, 2022 DIRC
  172. April 14, 2022 KLONG Phase II Design Meeting
  173. April 15, 2011 Design/Fab mtg
  174. April 15, 2019
  175. April 15, 2022 Tech group SAD meeting
  176. April 19, 2011 SiPM Electrical and Cooling
  177. April 19, 2013 PID Upgrade
  178. April 2, 2020 CPP Design Meeting
  179. April 20, 2009 Tracking CDC/FDC
  180. April 20, 2012 (4:00PM), Physics Working Group
  181. April 20, 2023
  182. April 20, 2023, FCAL Insert Installation Meeting
  183. April 21, 2022 CPP Design/Install Meeting
  184. April 22, 2013, Physics Working Group
  185. April 22, 2021 CPP Design Meeting
  186. April 22, 2022 Tech group SAD meeting
  187. April 23, 2020 CPP Design Meeting
  188. April 23, 2024 KLONG CPS Design Meeting
  189. April 25, 2011 (11:30AM), Physics Working Group
  190. April 25, 2024
  191. April 26, 2011 SiPM Electrical and Cooling
  192. April 26, 2023, FCAL Insert Installation Meeting
  193. April 27, 2009 (11AM), Physics Working Group
  194. April 27, 2012 (3:00PM), Rare eta-decay meeting.
  195. April 27, 2023
  196. April 29, 2022 Tech group SAD meeting
  197. April 3, 2017
  198. April 30, 2012 Design Meeting
  199. April 4, 2015
  200. April 4, 2016
  201. April 5, 2013 PID Upgrade
  202. April 5, 2023, FCAL Insert Installation Meeting
  203. April 6, 2022 FCAL 2 Design Meeting
  204. April 6, 2023
  205. April 8, 2022 Tech group SAD meeting
  206. April 8-14
  207. Assmbly Hub for the CDC
  208. Attenuation Results from Radphi
  209. Aug 02,2020 Tech group meeting
  210. Aug 1, 2014 Design Meeting
  211. Aug 11, 2011 SiPM Electrical and Cooling
  212. Aug 14, 2011 Replacement Solenoid
  213. Aug 15, 2023 HallD AI/ML meeting
  214. Aug 16, 2011 Calorimetry
  215. Aug 16, 2011 SiPM Electrical and Cooling
  216. Aug 19, 2010 Calorimetry
  217. Aug 2, 2011 Calorimetry
  218. Aug 20, 2009 Calorimetry
  219. Aug 21, 2012 Readout
  220. Aug 22, 2023 HallD AI/ML meeting
  221. Aug 23, 2011 Readout
  222. Aug 23, 2011 SiPM Electrical and Cooling
  223. Aug 25, 2011 SiPM Electrical and Cooling
  224. Aug 27, 2009 Readout
  225. Aug 29, 2014 Design Meeting
  226. Aug 30, 2011 Calorimetry
  227. Aug 30, 2011 Readout
  228. Aug 30, 2011 SiPM Electrical and Cooling
  229. Aug 30, 2014 Design Meeting
  230. Aug 30, 2023 HallD AI/ML meeting
  231. Aug 31, 2023 HallD AI/ML meeting
  232. Aug 4, 2011 SiPM Electrical and Cooling
  233. Aug 6,2013 Readout
  234. Aug 8, 2023 HallD AI/ML meeting
  235. Aug 9, 2011 Readout
  236. Aug 9, 2011 SiPM Electrical and Cooling
  237. August 09, 2022 FCAL Insert Installation Meeting
  238. August 1, 2012 Tracking CDC/FDC
  239. August 10, 2006
  240. August 10, 2009 Tracking CDC/FDC
  241. August 10, 2012 Design Meeting
  242. August 10, 2015
  243. August 10, 2022 FCAL Insert Installation Meeting
  244. August 10, 2023
  245. August 11, 2022
  246. August 12, 2010 CDC Meeting
  247. August 12, 2010 Des/Fab Meeting
  248. August 12, 2011 Design Meeting
  249. August 12, 2013, Physics Working Group
  250. August 12, 2022 Tech group meeting
  251. August 14, 2006 Software
  252. August 14, 2013 tracking CDC/FDC
  253. August 15, 2012 traccking CDC/FDC
  254. August 15, 2019 FCAL Insert Design Meeting
  255. August 16, 2010 (11AM), Physics Working Group
  256. August 17, 2006
  257. August 17, 2009 (11AM), Physics Working Group
  258. August 17, 2010 Tracking CDC/FDC
  259. August 17, 2011 Tracking CDC/FDC
  260. August 17, 2012 Fab Meeting
  261. August 17, 2023
  262. August 18, 2022
  263. August 19, 2010 Des/Fab Meeting
  264. August 19, 2021 KLONG Design Meeting
  265. August 2, 2010 (11AM), Physics Working Group
  266. August 20, 2012 PID Upgrade
  267. August 23, 2013 PID Upgrade
  268. August 24, 2009 Tracking CDC/FDC
  269. August 24, 2012 Design Meeting
  270. August 24, 2023
  271. August 25, 2008 Tracking CDC/FDC
  272. August 25, 2022
  273. August 26, 2010 Des/Fab Meeting
  274. August 26, 2013, Physics Working Group
  275. August 26, 2021 CPP Design Meeting
  276. August 27, 2012 (11:30AM), Physics Working Group
  277. August 28, 2006 Software
  278. August 28, 2013 tracking CDC/FDC
  279. August 29, 2011 (11:30AM), Physics Working Group
  280. August 29, 2012 traccking CDC/FDC
  281. August 29, 2012 tracking CDC/FDC
  282. August 29, 2022 FCAL Insert Installation Meeting
  283. August 3, 2009 (11AM), Physics Working Group
  284. August 3, 2011 Tracking CDC/FDC
  285. August 3, 2022 DIRC analysis
  286. August 3, 2023
  287. August 30, 2010 (11AM), Physics Working Group
  288. August 30, 2023 Calorimeter
  289. August 31, 2009 (11AM), Physics Working Group
  290. August 31, 2011 Tracking CDC/FDC
  291. August 31, 2023
  292. August 4, 2022
  293. August 5, 2011 Design/Fab Meeting
  294. August 5, 2022 Tech group meeting
  295. August 7, 2006 Software
  296. August 8, 2014
  297. August 9, 2010 CDC Meeting
  298. August 9, 2013 PID Upgrade
  299. Automated Timing Calibrations
  300. Available EventStore skims
  301. B1pi monitoring dashboard schema
  302. B1pi tests Sep. 2011
  303. BCAL-Chiller.MPOD Interlock.jpg
  304. BCAL Action Items and Working Tasks
  305. BCAL Angular Coverage
  306. BCAL Beam Test Plots, November 20, 2006
  307. BCAL Calibration
  308. BCAL Cell Cross Talk
  309. BCAL Costhe Efficiency
  310. BCAL Gain Calibration
  311. BCAL Hybrid Module Cosmic Tests
  312. BCAL Installation
  313. BCAL Installation Schedule
  314. BCAL Key Documents
  315. BCAL LED Installation Photos
  316. BCAL Monitoring
  317. BCAL Pb Sheet Widths
  318. BCAL Preparations for spring 2016
  319. BCAL Readout Review
  320. BCAL Readout Segmentation Task group Meeting: Aug 12, 2011
  321. BCAL Readout Segmentation Task group Meeting: Aug 19, 2011
  322. BCAL Readout Segmentation Task group Meeting: Aug 5, 2011
  323. BCAL Readout Segmentation Task group Meeting: Jul 22, 2011
  324. BCAL Readout Segmentation Task group Meeting: Jun 23, 2011
  325. BCAL Readout Segmentation Task group Meeting: Jun 30, 2011
  326. BCAL Readout Segmentation Task group Meeting: Jun 9, 2011
  327. BCAL Readout Segmentation Task group Meeting: May 19, 2011
  328. BCAL Readout Segmentation Task group Meeting: May 26, 2011
  329. BCAL Readout Segmentation Task group Meeting: Nov. 14, 2011
  330. BCAL Readout Segmentation Task group Meeting: Nov. 21, 2011
  331. BCAL Readout Segmentation Task group Meeting: Nov. 28, 2011
  332. BCAL Readout Segmentation Task group Meeting: Oct. 10, 2011
  333. BCAL Readout Segmentation Task group Meeting: Oct. 3, 2011
  334. BCAL Readout Segmentation Task group Meeting: Sep 19, 2011
  335. BCAL Readout Segmentation Task group Meeting: Sep 2, 2011
  336. BCAL Readout Segmentation Task group Meeting: Sep 26, 2011
  337. BCAL Reconstruction Algorithms
  338. BCAL Reconstruction Issues
  339. BCAL Reconstruction Status Update 20130501
  340. BCAL Reconstruction Task list
  341. BCAL Stand-Alone Monte Carlo - energy resolution
  342. BCAL Startup Checkout List 2014
  343. BCAL TDC Timing
  344. BCAL calibration links, 2020, PrimEx, SRC
  345. BCAL cosmics
  346. BCAL hadronic efficiencies
  347. BCAL reconstruction 01/16/2012
  348. BCAL reconstruction 03/07/2013
  349. BCAL reconstruction 10/19/11
  350. BCAL reconstruction 11/28/11
  351. BCAL reconstruction 8/24/11
  352. BCAL reconstruction 9/21/11
  353. BCAL reconstruction test with pi0
  354. BCal Beam Test Plots, April 10, 2007
  355. BCal Beam Test Plots, April 4, 2007
  356. BCal Beam Test Plots, August 28, 2007
  357. BCal Beam Test Plots, December 15, 2006
  358. BCal Beam Test Plots, December 19, 2006
  359. BCal Beam Test Plots, March 8, 2007
  360. BCal Beam Test Plots, May 8, 2007
  361. BCal Raw ADC Plots, June 18, 2007
  362. BCal Timing Resolution Note
  363. BLTWG Meeting 01/19/2015
  364. BLTWG Meeting 01/21/2013
  365. BLTWG Meeting 10/11/2007
  366. BLTWG Meeting 11/16/2007
  367. BLTWG Meeting 11/29/2007
  368. BLTWG Meeting 11/8/2007
  369. BLTWG Meeting 12/20/2007
  370. BLTWG Meeting 4/17/2008
  371. BLTWG Meeting 4/3/2008
  372. BLTWG Meeting 5/1/2008
  373. BLTWG Meeting 5/29/2008
  374. BLTWG Meeting 9/13/2007
  375. BLTWG Meeting 9/27/2007
  376. Baby BCAL at JLab
  377. Baby BCAL at JLab Photos
  378. Background studies
  379. Bar box darkening procedure
  380. Barrel Calorimeter
  381. Basic formalism for X-ray monochromator resolution
  382. Bcal Action Item Tracker
  383. Beam-induced background
  384. Beam-induced backgrounds
  385. Beam Data
  386. Beam Test Analyses and Results
  387. Beam Test Meeting Mon. Apr. 02, 2012
  388. Beam Test Meeting Mon. Apr. 09, 2012
  389. Beam Test Meeting Mon. Apr. 16, 2012
  390. Beam Test Meeting Mon. Apr. 23, 2012
  391. Beam Test Meeting Mon. Apr. 30, 2012
  392. Beam Test Meeting Mon. Mar. 19, 2012
  393. Beam Test Meeting Mon. Mar. 26, 2012
  394. Beam Test Meeting Mon. May. 07, 2012
  395. Beam Test Shift Schedule
  396. Beam commissioning: Fall 2014
  397. Beam commissioning in Fall 2014
  398. Beam halo measurements to assess background for PRad target TAC runs.
  399. Beam request (expect to run in 2021)
  400. Beam request (run in 2021)
  401. Beni's PMT replacement email
  402. Bggen-2017-01-ver03
  403. Bggen-2017-01-ver03.6
  404. Bggen-2018-01-ver02.2 bggen
  405. Bggen-2018-01-ver02 bggen
  406. Bggen-2018-08-ver02.2 bggen
  407. Bggen-2018-08-ver02 bggen
  408. Bill's to do list
  409. Blake CAP08 Abstract
  410. Bleed-through tests from other hall bunches
  411. BoardAgenda201001
  412. BoardAgenda201005
  413. BoardAgenda201009
  414. BoardAgenda201102
  415. BoardAgenda201105
  416. BoardAgenda201110
  417. BoardAgenda201202
  418. BoardAgenda201205
  419. BoardAgenda201210
  420. BoardAgenda201302
  421. BoardAgenda201306
  422. BoardAgenda201310
  423. BoardAgenda201402
  424. BoardAgenda201610
  425. BoardAgenda201702
  426. BoardAgenda201705
  427. BoardAgenda201710
  428. BoardAgenda201809
  429. BoardAgenda201905
  430. Brief Report on Yianna's ADC fits for SensL SiPMs
  431. Build on Github Pull Request
  432. Building HDDM support software
  433. Building Private Versions of GlueX Software: my halld build jlab
  434. Building a roof over src
  435. C++11 in Hall D Online
  436. CAEN V792N ADC
  437. CBAR Splitoff Software
  438. CB member who changes institutions
  439. CCAL preparation
  440. CCDB 0.09
  441. CCDB 1.00
  442. CCDB Author List Maintenance
  443. CCDB Example Session
  444. CCDB Schema Changes in Version 1.00
  445. CCDB Tables BCAL
  446. CCDB Tables CDC
  447. CCDB Tables FCAL
  448. CCDB Tables FDC
  449. CCDB Tables Photon Beam
  450. CCDB Tables Start Counter
  451. CCDB Tables TOF
  452. CCDB Wishlist
  453. CD3 geometry forward-region material effects
  454. CDC/FDC ASIC Discussion Meeting, September 3, 2008
  455. CDC/FDC Gas System GUI
  456. CDC 06 02 2008
  457. CDC 14 11 2007
  458. CDC 20 02 2008
  459. CDC 216 channels
  460. CDC 21 05 2008
  461. CDC 21 11 2007
  462. CDC 23 01 2008
  463. CDC 28 11 2007
  464. CDC 50/50 premix
  465. CDC 50 50
  466. CDC 55 45
  467. CDC 60 40
  468. CDC B field
  469. CDC Construction Complications Tracking
  470. CDC Electrical Hook Up Photos
  471. CDC Future MC Studies Discussion, October 1, 2008
  472. CDC HVB version 3
  473. CDC HV scan
  474. CDC HV scan instructions October 2021
  475. CDC High Voltage Board (HVB)
  476. CDC Hit Generation
  477. CDC NIM Elton
  478. CDC Pedestal Studies
  479. CDC Photos 2008
  480. CDC Readiness Checklist
  481. CDC Straw Sag photos
  482. CDC alcohol
  483. CDC amp dedx
  484. CDC and FDC readout tests
  485. CDC bad channels
  486. CDC channel numbers
  487. CDC commissioning plan
  488. CDC events
  489. CDC finding signal duration
  490. CDC garfield calcs
  491. CDC garfield drift vs gas mix
  492. CDC garfield xt table comparison
  493. CDC geometry April09
  494. CDC max drift times from Garfield
  495. CDC more garfield calcs
  496. CDC odd events
  497. CDC old & new preamp noise scope trace study
  498. CDC old preamp then and now
  499. CDC peak lengths
  500. CDC preamp LV checkup

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)