Beam Test Meeting Mon. Mar. 26, 2012
From GlueXWiki
Minutes
Hall B doing electron running through ~April 1
reactivation during the day, trying to go to 5 pass photon this evening
Integrated Hall B run successful, identified 3 energies
cable guide change under tagger in next few days
FCAL
resolution at 15.6 % for ~220 MeV electrons
still waiting on 5 pass beam
BCAL
start at 22.8 % point
align to counter using angle and straight edge
start with detector perpendicular, better understood
move to additional realistic angle later
worked through several dead channels
2 shorted cables
problem with u board
eventually everything was fixed
can control HV from epics
building full DAQ setup now