Agenda

Review action items from previous meeting

  • Write up note on timing resolution studies by mid-week (David)
    • Early draft circulated. Comments incorporated. Significant changes still being made
  • Continue studies on sampling fraction dependences, including angles (Andrei, Irina)
    • No significant progress to report


New Agenda items


Minutes

Participants

David L., Elton S., Beni Z., Matt S., Curtis M., Zisis P., Andrei S., Irina S.

BCAL Signal Timing Resolutions

David showed some slides, updating on progress in the Monte Carlo study to determine the BCAL timing resolutions as a function of segmentation scheme. The main highlights were:

  • Time jitter due to the photodetector was added (600ps FWHM/PE)
  • Conditions similar to the 2006 beam test were simulated
    • 150-650MeV
    • 90o center of module
    • New segmentation scheme to roughly match that of module in test
    • 64ps/√E obtained from M.C. vs. 70ps/√E from beam test data
  • Analysis technique used for beam test also applied to M.C.
    • previous technique ignored covariance which turned out to be significant
  • Uncertainty in σΔt was assumed to be 1/√E, but M.C. indicates this may not be optimal.
  • Roughly 20-30% better timing resolution in forward direction for 1234 scheme vs. 334 scheme.


Action Items

  • Continue work on GlueX note on BCAL timing resolutions (David)
  • Write-up quantifying neutron detection efficiency as function of segmentation scheme (?)