08/19/2020
From GlueXWiki
Present: M.D., A.D., S.Š, J.S.,
General:
- PAC approved the experiment for 33 days with A- rating.
- Eugene's comments on PAC
- Move GDH meeting?
S.Š: Wrote to Ilya. Waiting for his answer.
J.S.:
M.D.:
A.D.:
- Need a plan to move forward
- Invite non-GlueX collaborators?
- T. Averett, J. P. Chen, T. Holmstrom, C. Peng and X. Zheng have expressed wishes to join.
- Other people that may be interested: G. Cates, H. Gao, K. Griffioen, S. Kuhn, Z-E. Mezziani, M. Ripani, A. Sandorfi, K. Slifer. People from Ljubljana, Mainz, W&M?
- Target
- $600k. Where do the funds come from? Most likely JLab capital equipment.
- Manpower: target group.
- Timeline? Will determine when we can say we are ready to run.
- Should we organise a meeting with C. Keith?
- Helicity reporting equipment
- $50k Hall D/Accelerator ops funds?
- Manpower Hall D/Accelerator
- Mark to set-up a meeting with Hall D/accelerator people. Maybe after the summer 2020 run.
- Upgrade of the Pair Spectrometer acceptance
- Other special equipment (possibly) needed?
- Beam hardener
- Look into having an Al. radiator of RL between 2. 10^-5, 10^-4, so that we have some beam current flexibility.
- Push accelerator into developing solutions for suppressing beam bleedthrough.
- Tests with beam:
- Rate check on plastic/carbon targets (Nuclear Compton, B-H)? Rational: use a well-known target thickness with well defined vertex.
- Trigger optimisation studies?
- Low energy run
- Students
- Invite non-GlueX collaborators?