Present: M.D., A.D., S.Š, J.S.,

General:

  • PAC approved the experiment for 33 days with A- rating.
  • Eugene's comments on PAC
  • Move GDH meeting?

S.Š: Wrote to Ilya. Waiting for his answer.

J.S.:

M.D.:

A.D.:

  • Need a plan to move forward
    • Invite non-GlueX collaborators?
      • T. Averett, J. P. Chen, T. Holmstrom, C. Peng and X. Zheng have expressed wishes to join.
      • Other people that may be interested: G. Cates, H. Gao, K. Griffioen, S. Kuhn, Z-E. Mezziani, M. Ripani, A. Sandorfi, K. Slifer. People from Ljubljana, Mainz, W&M?
    • Target
      • $600k. Where do the funds come from? Most likely JLab capital equipment.
      • Manpower: target group.
      • Timeline? Will determine when we can say we are ready to run.
      • Should we organise a meeting with C. Keith?
    • Helicity reporting equipment
      • $50k Hall D/Accelerator ops funds?
      • Manpower Hall D/Accelerator
      • Mark to set-up a meeting with Hall D/accelerator people. Maybe after the summer 2020 run.
    • Upgrade of the Pair Spectrometer acceptance
    • Other special equipment (possibly) needed?
      • Beam hardener
      • Look into having an Al. radiator of RL between 2. 10^-5, 10^-4, so that we have some beam current flexibility.
      • Push accelerator into developing solutions for suppressing beam bleedthrough.
    • Tests with beam:
      • Rate check on plastic/carbon targets (Nuclear Compton, B-H)? Rational: use a well-known target thickness with well defined vertex.
      • Trigger optimisation studies?
    • Low energy run
    • Students