Search results

From GlueXWiki
Jump to: navigation, search

Page title matches

Page text matches

  • #* Elton and Ashot to meet and resolve any discrepancies between the simulations. Attendees: Beni, Jim Murphy (EHSQ), Pedro, John, Elton (Jlab); Ryan (IU); Will, Alam (USM); Andrei (UofR).
    3 KB (466 words) - 15:36, 10 June 2010
  • #* Elton is out this week. Zisis will lead the meeting. ...feels the university will be prepared to accept the procurement contract. Elton's idea of having a look at the boilerplate in advance was a very good one.
    5 KB (859 words) - 13:08, 18 June 2010
  • ** 23-Jun deadline submit writing assignments to me (Elton thinks I'll need more time)
    2 KB (315 words) - 11:17, 9 June 2010
  • #* Elton and Ashot to meet and resolve any discrepancies between the simulations.
    1 KB (175 words) - 18:03, 7 July 2010
  • * We need to talk to Elton Smith or Dan Carman about experience with the CLAS TOF nitorgen laser calib # Ask Elton about experience with the CLAS TOF laser calibration system.
    4 KB (670 words) - 00:26, 1 April 2015
  • ===Elton Smith===
    2 KB (285 words) - 10:42, 15 June 2010
  • ...construction documentation project</s><ref>statute of limitations</ref> -> Elton and David
    17 KB (2,687 words) - 17:13, 24 February 2017
  • ...construction documentation project</s><ref>statute of limitations</ref> -> Elton and David
    16 KB (2,575 words) - 09:24, 16 July 2019
  • ''Attendees:Elton, Mark, Simon, Jon, Adesh (JLab); Will, Mike (CMU); Zisis, Tegan, Ahmed (Uof #* Elton: Starting to mix in Bcal LED pulser data with production (currently comics)
    5 KB (755 words) - 17:13, 24 February 2017
  • Attendees:Beni, Yi, Elton (JLab); Andrei (UofR); Alam (USM).
    2 KB (381 words) - 12:10, 1 July 2010
  • Attendees: Fernando, Elton, Yi, Eugene, Beni, Chuck, Tim, John (JLab); Andrei (UofR); Alam, Will (USM)
    2 KB (364 words) - 14:16, 16 July 2010
  • '''JLab''': Eugene Chudakov, Mark Ito (chair), Yi Qiang, Sascha Somov, Elton Smith, Tim Whitlatch, Elliott Wolin, Beni Zihlmann Elton reported on the use of a nitrogen laser in CLAS for calibration of their ti
    4 KB (621 words) - 11:35, 31 March 2015
  • ...p and discuss issues with him. USC is building the forward TOF for CLAS12. Elton was there recently and saw the set-up. We agreed that this was a good idea. * He has added Elton's latest set of comments and corrections.
    4 KB (613 words) - 07:07, 1 April 2015
  • Attendees: Yi, Fernando, Beni, John, Elton, Eugene, Chuck (JLab); Matt, Dan (IU); Andrei, George (UofR); Pedro (USM).
    4 KB (572 words) - 17:13, 24 February 2017
  • ...b.jlab.org/doc-private/DocDB/ShowDocument?docid=1578 MOUs and Contracts] - Elton Smith ...DisplayMeeting?sessionid=267 TOF and PID] - (Organizer: P. Eugenio) Chair: Elton Smith
    12 KB (1,612 words) - 12:38, 14 March 2017
  • ...ion at low energies: Eugene summarized Matt's work in that his numbers and Elton's are consistent and the lesser radiation load for the upstream SiPMs does
    4 KB (614 words) - 14:40, 25 August 2010
  • #* Elton and Ashot to meet and resolve any discrepancies between the simulations. # Update on SiPM radiation hardness (Elton)
    4 KB (645 words) - 13:43, 5 August 2010
  • #* Elton and Ashot to meet and resolve any discrepancies between the simulations. #* FCAL simulations: deferred until Elton, Matt and Ashot attend (next?) video conference.
    4 KB (590 words) - 14:41, 19 August 2010
  • Attendees: Eugene, Beni, Yi, John, Elton, (JLab), Andrei, Zisis (Regina); Will (local), Alam (USM); Zisis, Andrei ( ...| Collaboration Meeting]] (Five 25-min sessions allocated), some topics... Elton will propose time allocations for discussion next week at the cal WG.
    5 KB (797 words) - 18:49, 26 August 2010
  • #* Elton and Ashot to meet and resolve any discrepancies between the simulations. ''Attendees: Elton, John, Hovanes, Tim, Yi, Eugene (JLab); Matt, Ryan (IU); Zisis, Andrei (Uof
    7 KB (992 words) - 15:37, 2 September 2010
  • # Progress in MOUs and contracts (Elton) # Project progress/timetables (Elton, Eugene)
    603 B (78 words) - 17:30, 9 September 2010
  • #* <strike> Elton and Ashot to meet and resolve any discrepancies between the simulations. </ #* <strike> Elton to check what to do with cables that do not meet CL2 specification. Excess?
    4 KB (650 words) - 12:42, 16 September 2010
  • * '''JLab''': Eugene Chudakov, Hovanes Egiyan, Mark Ito (chair), Elton Smith, Sascha Somov, Simon Taylor Elton, Eugene, Sascha, Hovanes, Simon, Mark
    3 KB (429 words) - 17:12, 24 February 2017
  • ''Attendees: Yi, Elton, Tim, Eugene, Beni (JLab); Will, Alam (USM). #* Elton has requested that Zisis and Matt turn in their EVMS reports today in prepa
    4 KB (638 words) - 14:05, 30 September 2010
  • * I (or Eugene? or Elton?) will lead them to the coil test apparatus and give them a brief introduct Elton, George, and Tim (Josh B, too?) will be there to answer questions.
    3 KB (453 words) - 21:54, 22 September 2010
  • * '''JLab''': Eugene Chudakov, Mark Ito (chair), Elton Smith, Sascha Somov, Simon Taylor, Beni Zihlmann ...version of the MOU, incorporating language suggested by FSU legal staff. Elton has prepared a new draft, with the new language, and will send it along to
    3 KB (409 words) - 04:56, 1 April 2015
  • ''Attendees: Christina, Pavlos, George (Athens); John, Elton, Fernando, Beni, Tim, Yi, Eugene (JLab); Matt (IU); Will (USM@cern). ##* Elton: The cal group needs to come up with some specifications on light monitorin
    4 KB (617 words) - 14:38, 14 October 2010
  • ''Attending: Joh, Elton, Fernando (JLab); Will (USM)
    2 KB (284 words) - 12:12, 21 October 2010
  • * '''JLab''': Eugene Chudakov, Hovanes Egiyan, Mark Ito, Rory Miskimen, Elton Smith, Tim Whitlatch, Beni Zihlmann
    3 KB (447 words) - 11:36, 31 March 2015
  • #* Specifications for Bcal monitoring (Zisis, Elton, Christina)
    888 B (115 words) - 11:56, 4 November 2010
  • ''Attending: Elton, Beni, Chuck, Tim, Fernando, John, Eugene (JLab); Matt (IU); Zisis, Andrei ##* Elton will check if a spare SiPM array can be lent to USM
    5 KB (746 words) - 14:31, 4 November 2010
  • * '''JLab''': Eugene Chudakov, Mark Ito (chair), Rory Miskimen, Elton Smith, Sascha Somov, Simon Taylor, Beni Zihlmann Rory, Elton, and Mark have agreed on a final draft. That has been sent to Glenn Young f
    3 KB (446 words) - 00:14, 1 April 2015
  • ...eb.jlab.org/doc-private/DocDB/ShowDocument?docid=1672 Contract and MOUs] - Elton Smith ...ocument?docid=1687 Update on the Calibration for the Fcal and the Bcal] - Elton Smith
    9 KB (1,174 words) - 12:39, 14 March 2017
  • ** 9:15 (30) --- Contract and MOUs --- Elton Smith. .../doc-private/DocDB/DisplayMeeting?sessionid=321 Calorimetry] - (Organizer: Elton Smith) - Chair: Alexander Ostrovidov
    9 KB (1,102 words) - 12:40, 14 March 2017
  • #* Specifications for BCAL [[Monitoring R&D]] (Zisis, Elton, Christina) ...ons_Table Calibration Specifications Table] for BCAL, FCAL, TOF and START (Elton, Zisis and Christina)
    5 KB (689 words) - 17:13, 24 February 2017
  • # Elton to check availability of spare SiPM array to lend to USM # Elton to investigate the options for transfering laser to UofR for future tests
    7 KB (1,051 words) - 17:12, 24 February 2017
  • ''Attendees:Elton, David, Adesh, Tegan (JLab); Zisis, Noemi, Andrei (UofR); Matt (IU); Will, ...nd Will. Elton and Will had some questions that will be passed on offline. Elton requested the data from the MC plots for ease of superimposing on measured
    6 KB (966 words) - 12:38, 14 March 2017
  • * Present: Alex S., Yi Q., Hovanes E., Elton S., Eugene C., Tim W., Dan S., Brendan P., and Richard J. # [ Update on the alternative microscope readout ] -- ''Elton/Sascha''
    888 B (130 words) - 12:35, 15 November 2010
  • #* <strike> Specifications for BCAL [[Monitoring R&D]] (Zisis, Elton, Christina) </strike> ...itoring summary points] and [[Monitoring System Requirements]] (Christina, Elton and Zisis)
    5 KB (806 words) - 17:57, 13 December 2010
  • # <strike> Elton to send timeline for project to Will for feedback. </strike> Note: Detaile # <strike> Will to send draft sow to Elton for feedback. </strike>
    3 KB (399 words) - 13:01, 2 December 2010
  • #** Yi, Eugene, Elton
    5 KB (749 words) - 16:15, 3 December 2010
  • # '''Linearity''': Elton mentioned possible tests for the SiPM linearity.
    3 KB (440 words) - 17:15, 1 December 2010
  • # Detailed schedule for testing at USM (Elton and Will). # George to send Elton information regarding the laser head so a new one can be ordered.
    1 KB (165 words) - 10:09, 15 December 2010
  • ''Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)'' ...nd [https://mailman.jlab.org/pipermail/halld-cal/2010-December/000292.html Elton] and [[May 27, 2010 Calorimetry]].]
    5 KB (817 words) - 17:12, 24 February 2017
  • #* Estimated ~10 input channels (from Elton, Fernando)
    3 KB (344 words) - 18:09, 8 December 2010
  • #* Specifications for BCAL [[Monitoring R&D]] (Zisis, Elton, Christina) #* Zisis/George to send Elton shipping specifications as example for specifying Pb shipments
    1 KB (203 words) - 13:54, 9 December 2010
  • * [http://www.jlab.org/~elton Files for discussion] ''Attendees: Elton, Yi, Carl, Jim, Chuck, Jack, Fernando
    3 KB (372 words) - 17:25, 10 December 2010
  • # Detailed schedule for testing at USM (Elton and Will). In progress # <strike> George to send Elton information regarding the laser head so a new one can be ordered.</strike>
    5 KB (746 words) - 12:39, 14 March 2017
  • # Background (Elton) To: Elton Smith <elton@jlab.org>, George Biallas <biallas@jlab.org>,
    2 KB (358 words) - 15:43, 20 December 2010
  • ...rd J., Brendan P., Alex B., Mike D., Dan S., Franz K., Nathan S., Alex D., Elton S., Eugene C., Hovanes E., Mark D., Alex S., Curtis M., Ken L., and Yang G.
    3 KB (431 words) - 11:40, 14 March 2016
  • # Progress in MOUs and contracts (Elton)
    551 B (72 words) - 12:00, 21 January 2011
  • * [http://www.jlab.org/~elton Files for discussion] ''Attendees: Jack, Chuck, Jim, Yi, Carl, John, Elton, Fernando.
    4 KB (597 words) - 17:08, 24 February 2017
  • # Detailed schedule for testing at USM (Elton and Will). In progress ...ermail/halld-cal/2011-January/000300.html Comments on QC/QA from project] (Elton)
    6 KB (914 words) - 06:25, 28 January 2011
  • Participants: Curtis, Naomi, Beni, Lubomir, Simon, Dave, Mark, Tim and Elton. # Elton asked how did the wire soldering work. Lubomir: relatively easy operation,
    5 KB (825 words) - 17:11, 16 February 2011
  • * [http://www.jlab.org/~elton Files for discussion] ...velop a specification sheet for the readout electrical and cooling system (Elton) </strike>
    3 KB (470 words) - 17:07, 24 February 2017
  • #* Specifications for BCAL [[Monitoring R&D]] (Zisis, Elton, Christina) #* <strike> Zisis/George to send Elton shipping specifications as example for specifying Pb shipments </strike>
    5 KB (701 words) - 18:00, 20 January 2011
  • #* Specifications for BCAL [[Monitoring R&D]] (Zisis, Elton, Christina) #* Zisis/George to send Elton shipping specifications as example for specifying Pb shipments
    1 KB (183 words) - 13:16, 20 January 2011
  • ''Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)''
    3 KB (482 words) - 17:42, 24 January 2011
  • ''Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)'' # Zisis will contact USM to send more LGs to Athens (and eventually Regina). Elton will look for a spare SiPM plus board to send to Athens.
    3 KB (441 words) - 01:04, 26 January 2011
  • * '''JLab''': Mark Ito (chair), David Lawrence, Yi Qiang, Dmitry Romanov, Elton Smith, Simon Taylor, Elliott Wolin, Beni Zihlmann ...mysteries in the code that someone in the collaboration should figure out. Elton mentioned that Regina was starting to look at maintaining the BCAL code. Da
    5 KB (746 words) - 23:18, 31 March 2015
  • * [http://www.jlab.org/~elton Files for discussion] ...pe numbers on dynamic range table to include effect of attenuation length (Elton)
    4 KB (597 words) - 17:10, 24 February 2017
  • # Detailed schedule for testing at USM (Elton and Will). In progress ...e> Determine total need of light guides for work at UofR, Athens and JLab (Elton, Zisis, Christina). </strike>
    6 KB (876 words) - 16:52, 24 February 2017
  • aebarnes@jlab.org, zhangzy@jlab.org, elton@jlab.org, sdobbs@jlab.org,
    1 KB (208 words) - 13:52, 19 April 2016
  • Attending: Sean (NU); Simon, Alex B., Paul, Beni, Nathan, Mark I., Eugene, Elton, Justin (JLab); Curtis, Naomi, Mike S. (CMU)
    6 KB (936 words) - 17:06, 24 February 2017
  • ''Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)'' ...lect the information of the LED+small fibre test and send to Christina and Elton before moving forward. Athens will collect all of George's answers in an A
    4 KB (585 words) - 14:32, 8 February 2011
  • * '''JLab''': Hovanes Egiyan, Mark Ito (chair), David Lawrence, Yi Qiang, Elton Smith, Simon Taylor, Elliott Wolin, Beni Zihlmann ...blem with split-off, we need to know about it sooner rather than later and Elton's understanding is that the current focus is on deciding the summing scheme
    7 KB (1,124 words) - 18:23, 31 March 2015
  • ...jlab.org/doc-private/DocDB/ShowDocument?docid=1905 MOUs and Contracts] --- Elton Smith.
    10 KB (1,269 words) - 12:39, 14 March 2017
  • ...QA (UofR), QC/QA (IU), and procedures for signoff of non-conforming items (Elton and Tim). </strike> # <strike> Plot the angular distribution of pi0 and etas (Elton) </strike>
    4 KB (577 words) - 14:33, 24 February 2011
  • #* Elton will obtain cost estimates for this power supply ''Attending Morning: Joe Minervini, Phil Michael, Elton, Ettore, Glenn, Lionel Quettier, Mitch Laney, Catherine Ware (MIT Chief Fis
    5 KB (810 words) - 09:31, 14 February 2011
  • * [http://www.jlab.org/~elton Files for discussion] ...pe numbers on dynamic range table to include effect of attenuation length (Elton) </strike>
    3 KB (432 words) - 17:13, 24 February 2017
  • ...lab.org/doc-private/DocDB/ShowDocument?docid=1702 of pi0 and eta yields] (Elton) # new phone instructions have been updated (Elton)
    926 B (134 words) - 17:05, 24 February 2017
  • Present: Elliott W, Beni Z, Simon T, Dave L, Alex S, Elton S, Yi Q, Bryan M, Hovanes E, Dave A.
    3 KB (488 words) - 15:44, 17 February 2011
  • #* Specifications for BCAL [[Monitoring R&D]] (Zisis, Elton, Christina) #* <strike> Zisis/George to send Elton shipping specifications as example for specifying Pb shipments </strike>
    6 KB (833 words) - 17:12, 24 February 2017
  • ....jlab.org/doc-private/DocDB/ShowDocument?docid=1738 Contract and MOUs] --- Elton Smith. .../doc-private/DocDB/DisplayMeeting?sessionid=304 Calorimetry] - (Organizer: Elton Smith) - Chair: Curtis Meyer
    11 KB (1,384 words) - 17:13, 24 February 2017
  • ''Attending: Matt, Ryan, John (IU); Zisis, Andrei (UofR); Elton, John, Beni, Tim, Yi, Wayne Sachleben, Dave, Eugene, Lubomir (JLab)
    6 KB (958 words) - 15:35, 3 March 2011
  • * '''JLab''': Mark Ito (chair), Yi Qiang, Elton Smith, Sascha Somov, Simon Taylor, Tim Whitlatch, Beni Zihlmann ** Elton: 1/sqrt(p.h.) may not be the right functional dependence
    5 KB (732 words) - 17:14, 24 February 2017
  • * [http://www.jlab.org/~elton Files for discussion] # Schedule, reporting, and manpower (Elton)
    2 KB (311 words) - 16:54, 24 February 2017
  • ...Lab''': Vardan Gyurjyan, Mark Ito (chair), David Lawrence, Dmitry Romanov, Elton Smith, Sascha Somov, Simon Taylor, Elliott Wolin, Beni Zihlmann ...xists") and would have built-in 3D capabilities as well as 2D projections. Elton in particular questioned whether we can sustain multiple efforts, the EVE r
    7 KB (1,058 words) - 11:34, 31 March 2015
  • ''Attending: Zisis, Andrei (UofR); Elton, Eugene, Beni (JLab); Will (USM). Mihajlo (IU)
    4 KB (539 words) - 17:13, 24 February 2017
  • .../ShowDocument?docid=3703 The GlueX Program at Jefferson Lab], presented by Elton Smith ...ate/DocDB/ShowDocument?docid=3202 Latest results from GlueX], presented by Elton Smith
    77 KB (10,281 words) - 10:24, 23 April 2024
  • # Schedule, reporting, and manpower (Elton) # Discussion of production testing (Elton)
    3 KB (379 words) - 17:26, 31 March 2011
  • # Schedule, reporting, and manpower (Elton) ''Attendees:Jack, Carl, Tim, Chuck, Jim, Eugene, John, Elton
    2 KB (293 words) - 17:13, 24 February 2017
  • * '''JLab''': Mark Ito (chair), Elton Smith, Simon Taylor, Tim Whitlatch, Beni Zihlmann ...t Plan (APP), a schedule for putting the construction contract into place. Elton's Fastrack schedule will provide input.
    3 KB (407 words) - 22:03, 31 March 2015
  • ''Attending:Elton, Yi, Eugene, David, Tim, Beni, John (JLab); Zisis, Andrei (UofR); Will (USM
    6 KB (939 words) - 13:43, 17 March 2011
  • * [http://www.jlab.org/~elton Files for discussion] # Schedule, reporting, and manpower (Elton)
    3 KB (456 words) - 17:12, 24 February 2017
  • ''Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)'' ### BCAL design. Elton will discuss how to proceed with Eugene and give feedback to Zisis who has
    3 KB (476 words) - 16:18, 8 March 2011
  • * [Added in press.] Mark discussed this issue with Elton after the meeting and he mentioned that CLAS has been able to use its start
    4 KB (571 words) - 06:07, 1 April 2015
  • ...eb.jlab.org/doc-private/DocDB/ShowDocument?docid=1715 Electrical/cooling] (Elton) ''Attending: Christina, George, Pavlos, Kappos (Athens); Elton, Beni, Tim, Eugene, Yi, John, Beni; Zisis, Andrei (UofR); Will, Serguei (US
    3 KB (499 words) - 17:12, 24 February 2017
  • * [http://www.jlab.org/~elton Files for discussion] # Schedule, reporting, and manpower (Elton)
    2 KB (285 words) - 17:12, 24 February 2017
  • * Controlling CAN systems - Elliott, Hovanes, Elton
    4 KB (678 words) - 16:02, 22 March 2011
  • ...icipants: Curtis, Naomi, Beni, Eugene, Lubomir, Simon, Dave, Mark, Tim and Elton.
    2 KB (382 words) - 16:59, 16 March 2011
  • ''Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)'' ## Elton has been pushing the MoU through the concurrence stage at JLab.
    2 KB (342 words) - 10:52, 17 March 2011
  • * '''JLab''': Eugene Chudakov, Mark Ito (chair), Elton Smith, Sascha Somov, Simon Taylor, Tim Whitlatch, Beni Zihlmann Elton thought that we probably should try to simulate light collection for the va
    4 KB (656 words) - 17:13, 24 February 2017
  • ''Attending: Beni, Elton, John, Eugene, Tim, Lubomir, Yi (JLab); Will, Serguei (USM); Matt (IU); Zis ## Elton: Asked whether the efficiency of reconstruction has been investigated. Andr
    5 KB (757 words) - 17:28, 17 August 2011
  • # Schedule, reporting, and manpower (Elton) ''Attending: Jim, Elton, Jack, John, Yi, Carl, Eugene
    2 KB (350 words) - 17:15, 24 March 2011
  • ...the Hamamatsu PMT H9779 (8-stage) the maximum operating current is 0.1 mA. Elton estimated the signal amplitude based on this maximum current assuming a gai
    12 KB (2,086 words) - 16:55, 24 February 2017
  • # Electrical/cooling (Elton) ''Attending: Elton, David, Yi, John, Eugene (JLab); Will, Serguei (USM); Zisis, Andrei (UofR);
    5 KB (716 words) - 14:03, 7 April 2011
  • ...lab.org/doc-private/DocDB/ShowDocument?docid=1715 Points for Discussion] (Elton) ...orge Lolos, Efthimios Kappos, Stathis Stiliaris (Athens); Matt, Paul (IU); Elton, Beni, Eugene, Hovanes, Elliott, Dave (JLab); Zisis, Andrei, Mehrnoosh Taha
    3 KB (474 words) - 17:14, 24 February 2017
  • ''Attending:Yi, Tim, David, Eugene, Elton (JLab); Matt, Ryan, Mihajlo (IU); Andrei (UofR); Will (USM). #* Elton reported that the Athens system with one controller supplying signals to 4
    5 KB (771 words) - 17:02, 24 February 2017
  • Participants: Curtis, Naomi, Mark, Eugene, Beni, Simon, Lubomir, Elton, Dave
    4 KB (718 words) - 18:33, 30 March 2011
  • # Schedule, reporting, and manpower (Elton) ''Attending:Jim, Elton, Jack, Carl, Yi, Fernando, John, Chris
    2 KB (270 words) - 13:39, 8 April 2011
  • Dear Elton,
    8 KB (1,245 words) - 02:33, 2 April 2011
  • David L., Elton S., Andrei S., Irina S., Zisis P. ** (Added by Elton): The systematic difference between reconstructed and generated energy is n
    5 KB (789 words) - 17:08, 24 February 2017
  • # Electrical/cooling (Elton)
    1 KB (190 words) - 18:32, 5 April 2011
  • ''Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)'' ## Elton will look into breaking off a small part of the contract soon, to allow wor
    2 KB (311 words) - 11:42, 7 April 2011
  • # Schedule, reporting, and manpower (Elton) ''Attending: Elton, John, Carl, Yi, Jim, Chris, Eugene, Chuck
    3 KB (400 words) - 17:25, 14 April 2011
  • ##* 13 crates shipped to JLab. They arrived safely. Elton and Beni inspected the boxes, but opened only two. They glass blocks were n #** 16:30 (30) --- Cooling/Bias Compensation/Electronics (Elton?)
    5 KB (772 words) - 18:08, 26 April 2011
  • # Schedule, reporting, and manpower (Elton) ''Attending: Jim, Elton, Carl, Jack, Fernando, Chris
    3 KB (504 words) - 07:46, 29 April 2011
  • * '''JLab''': Mark Ito (chair), Elton Smith, Simon Taylor, Tim Whitlatch Elton described work documented in [https://halldweb.jlab.org/doc-private/DocDB/S
    3 KB (400 words) - 17:12, 24 February 2017
  • # Electrical/cooling (Elton) ''Attending:Beni, Yi, John, Tim, Elton, Eugene (JLab); Will (USM); Andrei (UofR); Christina (Athens)
    6 KB (905 words) - 15:19, 3 May 2011
  • # Progress in MOUs and contracts (Curtis/Elton)
    569 B (73 words) - 11:37, 22 April 2011
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    3 KB (438 words) - 18:28, 5 May 2011
  • # Electrical/cooling (Elton) ''Attending:Tim, David, Beni, Eugene, Elton, Yi (JLab); Christina, George, Pavlos (Athens); Alam, Serguei (USM); Andrei
    4 KB (561 words) - 13:23, 31 May 2011
  • # <strike> FCAL plexiglass pane drawings upload (Elton) </strike> [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid
    1 KB (158 words) - 17:04, 24 February 2017
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    2 KB (343 words) - 18:37, 12 May 2011
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    2 KB (263 words) - 17:30, 26 May 2011
  • Participants: Curtis, Naomi, Eugene, Beni, Simon, Lubomir, Dave, Fernando, Elton
    4 KB (598 words) - 17:15, 25 May 2011
  • David Lawrence, Elton Smith, Zisis Papandreou, Andrei Semenov, Irina Semenova, Beni Zhilmann * Elton noted that gain differences in the SiPMs would contribute to the pedestal w
    6 KB (911 words) - 17:12, 24 February 2017
  • # In the meanwhile, Elton will send 2 Plastic Craft LGs to Athens, and possibly small connectors (fro ''Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)''
    2 KB (334 words) - 17:26, 26 May 2011
  • * '''JLab''': Eugene Chudakov, Mark Ito (chair), Elton Smith, Sascha Somov, Simon Taylor, Ivan Tolstukhin, Beni Zihlmann
    3 KB (549 words) - 17:12, 24 February 2017
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    4 KB (548 words) - 17:17, 2 June 2011
  • # <strike> Ship out 10 SiPM arrays each to UofR and USM (Elton). </strike> Shipped out last week with tracking numbers. # Electrical/cooling (Elton)
    5 KB (774 words) - 17:00, 24 February 2017
  • ##* Elton sent [https://halldweb.jlab.org/talks/2011-2Q/elton_to_kuraray.pdf letter t
    4 KB (598 words) - 23:18, 31 March 2015
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    3 KB (436 words) - 18:27, 9 June 2011
  • Andrei S., Irina S., David L., Elton S. * Elton will write up how he understands the current smearing to be implemented, in
    6 KB (1,004 words) - 15:31, 9 June 2011
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    3 KB (509 words) - 17:12, 16 June 2011
  • * '''JLab''': Eugene Chudakov, Mark Ito (chair), David Lawrence, Elton Smith, Simon Taylor, Elliott Wolin, Beni Zihlmann Elton raised the idea of having one or more well-defined examples, in code, that
    6 KB (909 words) - 23:37, 31 March 2015
  • # Electrical/cooling (Elton) ''Attending: John, Yi, Elton (JLab); Christine, George, Pavlos, Stratos (Athens); Zisis, Andrei (UofR);
    5 KB (799 words) - 17:12, 24 February 2017
  • ''Attending: Matt (IU); Andrei (UofR); Christine (Athens); Elton, Beni, Tim, David, John #* Waiting for Elton to give feedback on calibration methodology
    6 KB (902 words) - 17:12, 24 February 2017
  • ...n of how we should incorporate sampling fluctuations in the smearing code (Elton) Andrei S., Irina S., Matt S., David L., Elton S., Beni Z. (partial), Eugene C. (partial)
    8 KB (1,293 words) - 17:44, 17 August 2011
  • # <strike> Calculate acceptance for various heights of the flat section (Elton). </strike> # Schedule, reporting, and manpower (Elton)
    3 KB (390 words) - 18:07, 30 June 2011
  • **Elton, Tim ** George, Elton
    7 KB (1,060 words) - 07:28, 13 July 2011
  • ''Attending: Zisis, Andrei (UofR); Elton, John, Beni, Yi (Jlab); Will (USM); Christina, Stratos (Athens); Matt (IU) ##* Elton suggested that the different colors be supplied from different (programmabl
    5 KB (877 words) - 17:41, 12 July 2011
  • ** Elton thought that UVT plastic was important for the BCAL; we will have to talk t # Talk to Elton about UVT light guides.
    5 KB (810 words) - 17:05, 24 February 2017
  • ...w Andrei's proposed procedure for calculating sampling fraction functions (Elton)
    5 KB (757 words) - 14:54, 23 June 2011
  • # Electrical/cooling (Elton) ''Attending: Zisis, Andrei (UofR); George, Christina, Strators (Athens); Elton, Beni, Yi, John, Eugene (JLab); Will (USM)
    3 KB (447 words) - 17:32, 12 July 2011
  • Andrei S., Zisis P., David L., Elton S. * After the meeting Elton also noted that the gain used to obtain the 61.67 number was larger than wh
    5 KB (754 words) - 15:51, 11 July 2011
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    3 KB (482 words) - 07:33, 13 July 2011
  • * We talked about Elton's arguments for going with UVT material. Given the price, the choice is cle Sasha has been working on applying Elton's time-walk correction prescription to data from the prototype set-up.
    3 KB (487 words) - 17:12, 24 February 2017
  • # Electrical/cooling (Elton) ''Attending: Tim, Elton, John, Yi, Beni, Eugene (JLab); Andrei (UofR); Will (attempted connection b
    4 KB (687 words) - 17:13, 24 February 2017
  • ''Attending:Christina, Stratos, Pavlos (Athens); Elton, Beni, Tim, John, Eugene, Yi (Jlab); Will (USM); Zisis, Andrei (UofR). ...update to cost to complete for the project. Zisis sent the file Friday but Elton missed it. It will be resent.
    7 KB (1,058 words) - 17:13, 24 February 2017
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    1 KB (189 words) - 10:20, 15 July 2011
  • Participants: Bill, Dave, Chris, Elton, Beni, Simon, Glenn, Caleb, and Lubomir. ...ould replace the HV capacitors with better ones and see if this will help. Elton: there were problems with the HV capacitors for the FCAL bases and they had
    5 KB (882 words) - 12:58, 15 July 2011
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    3 KB (388 words) - 17:28, 21 July 2011
  • Andrei S., Zisis P., Irina S., David L., Elton S., Matt S. ...as assigned to implement promptly the suggested method in to the code, and Elton was assigned to review Andrei's proposed procedure for calculating sampling
    7 KB (1,129 words) - 13:06, 20 July 2011
  • # In the meanwhile, Elton will send 2 Plastic Craft LGs to Athens, and possibly small connectors (fro ''Attendees: Christina (Athens), Elton (JLab), Zisis (Regina)''
    2 KB (308 words) - 12:29, 18 July 2011
  • * [https://logbooks.jlab.org/entry/3376980 Analysis of the fall data] Elton
    2 KB (235 words) - 10:49, 8 February 2016
  • ''Attending: Elton, Eugene,Tim,Beni,Lubomir (Jlab); Kei, Matt (IU); Andrei (UofR) ##* Elton: Likely use the hardware interlock from power supplies.
    4 KB (588 words) - 11:33, 31 March 2015
  • Sasha tried out the technique that Elton described in a [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?do
    3 KB (407 words) - 17:01, 24 February 2017
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    3 KB (419 words) - 08:39, 29 July 2011
  • * [[Media:Geom_dt_jul22.pdf | Toy Monte Carlo Studies]] (Elton S.) Beni Z., Elton S., David L., Andrei S., Irina S., George L., Zisis P. (partial), Matt S. (
    6 KB (961 words) - 13:26, 25 July 2011
  • # Electrical/cooling (Elton)
    888 B (126 words) - 14:28, 9 August 2011
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    3 KB (445 words) - 17:03, 4 August 2011
  • ''Attending: Tim, Beni, David, Elton (Jlab); Matt, Kei (IU); Will - no audio, Alam (USM); Christine (Athens) ...as requested additional information to Christine regarding their proposal. Elton will setup a meeting with Christine and procurement personnel for Thu (this
    5 KB (846 words) - 15:38, 17 August 2011
  • ...The text is written. It is missing some milestones. He will get those from Elton's schedule.
    2 KB (322 words) - 17:13, 24 February 2017
  • * Solenoid replacement status - Elton
    1 KB (215 words) - 10:21, 5 August 2011
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    3 KB (434 words) - 14:13, 12 August 2011
  • * Toy Monte Carlo Studies (Elton S.) ''David L., Andrei S., Irina S., Zisis P. George L., Elton S., Beni Z.''
    8 KB (1,351 words) - 16:48, 24 February 2017
  • * Elton explicitly asked for trip current control. * Beni and Elton were advocating for including a maximum voltage setting in the firmware for
    3 KB (487 words) - 14:06, 11 August 2011
  • * Read [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1796 Elton's Note] on parametric M.C. and send comments (All) ''David L., Elton S., Curtis M., Andrei S., Matt S.''
    8 KB (1,254 words) - 16:58, 24 February 2017
  • # Electrical/cooling (Elton) ''Attending: Elton, Will, Beni, Eugene (JLab); Christine (UA); Sergey (CERN); Hayk, Alam, Rica
    4 KB (623 words) - 16:37, 23 August 2011
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    4 KB (548 words) - 17:46, 25 August 2011
  • Participants: Curtis, Naomi, Beni, Eugene, Elton, Simon, Lubomir, Dave, Mark, Tim
    4 KB (603 words) - 17:04, 31 August 2011
  • Mark received a copy of Elton's scintillator specification from CLAS. Eugene suggested getting a copy of
    3 KB (371 words) - 17:10, 24 February 2017
  • #* <strike> Elton to check actual space in Hall B relative to the proposed drawing </strike> ''Attending: Elton, Jim, Beni, Yi, Eugene (Jlab); Will (USM); Christine, Stratos (Athens); Zis
    5 KB (778 words) - 16:35, 30 August 2011
  • * Read Elton's e-mail above and circulate comments via e-mail (All) ''David L., Elton S., Beni Z., George L., Andrei S., Matt S.''
    3 KB (406 words) - 12:48, 13 March 2012
  • # Electrical/cooling (Elton)
    998 B (145 words) - 16:17, 23 August 2011
  • ''Participants in call: Brad Smith, Alexey Radovinsky, Elton Smith, Joe Minervini Eugene Chudakov (joined late) # Elton: We should adopt MIT's proposal to select the Rutherford Cable in copper ch
    3 KB (459 words) - 10:36, 29 August 2011
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    3 KB (382 words) - 16:57, 1 September 2011
  • Participants: Curtis, Naomi, Eugene, Beni, Simon, Dave, Lubomir, Elton, Mark, Tim
    4 KB (695 words) - 19:02, 14 September 2011
  • ''Attending:Matt, Kei (IU); Zisis, Andrei (UofR); Elton, David, Beni, Tim, Eugene (Jlab); Will (USM) ...as possible to see if the apparatus can fit downstream of the tagger box. Elton will check with Hall B if the white angle bar could be removed for installi
    6 KB (834 words) - 16:52, 24 February 2017
  • Participants: Bill, Dave, Simon, Beni, Elton, Mark, and Lubomir. - Beni and Elton stated that the priority now should be building the first package and later
    5 KB (890 words) - 16:11, 9 September 2011
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    726 B (87 words) - 17:34, 7 September 2011
  • ''David L., Elton S., Beni Z., Matt S., Curtis M., Zisis P., Andrei S., Irina S.''
    2 KB (246 words) - 06:52, 5 September 2011
  • #* [[Media:BCAL Monitoring PCB.pdf | Geometry of monitoring board]] (Elton) # Electrical/cooling (Elton)
    6 KB (893 words) - 12:40, 14 March 2017
  • # Electrical/cooling (Elton) ''Attending: Alam, Hayk, Will, Iñaki (USM); Elton, Yi, Ivan, Tim, Beni, Eugene (JLab); Zisis, Andrei (UofR).
    5 KB (754 words) - 17:12, 24 February 2017
  • ...lldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1814 GlueX-doc-1814] (Elton) ## Contact with Hall B (Elton)
    6 KB (861 words) - 17:12, 24 February 2017
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    3 KB (428 words) - 16:48, 15 September 2011
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    3 KB (382 words) - 17:30, 22 September 2011
  • ...electronics/readout (Fernando) will be coordinated through Elton. Eugene, Elton and Sascha will interact with Hall B folks to ensure a smooth procedure fro * [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1901 Elton's presentation] to Hall B, Monday Feb 13.
    14 KB (2,229 words) - 12:40, 14 March 2017
  • # [[Media:Cost layer1.pdf | Estimated Budget]] (Elton S.) ''David L., Elton S., Beni Z., Eugene C., Zisis P., Andrei S., Matt S.''
    2 KB (392 words) - 17:01, 24 February 2017
  • ...ovanes Egiyan, Mark Ito (chair), David Lawrence, Yi Qiang, Dmitry Romanov, Elton Smith, Sascha Somov, Simon Taylor, Elliott Wolin
    6 KB (853 words) - 13:36, 31 March 2015
  • # Progress in MOUs, contracts and procurement (Elton/Curtis) ...etc following hacking event: should we consider moving it off JLab-site? (Elton)
    1,005 B (124 words) - 10:36, 31 March 2015
  • # Electrical/cooling (Elton) ''Attending: Alam, Ricardo, Hayk (USM); Zisis, Andrei (UofR); Yi, Eugene, Elton, Beni, David (JLab); Zisis, Andrei (UofR)
    2 KB (290 words) - 13:18, 4 October 2011
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    3 KB (428 words) - 16:52, 29 September 2011
  • ''David L., Elton S., Andrei S., Zisis P., Irina S., Matt S., Beni Z., Eugene C.'' ** Elton noted that there is an additional amplification of the pre-amp board in add
    3 KB (518 words) - 10:25, 27 September 2011
  • ''Attending: Carl, Jack, Chris, Fernando, Chuck, Jim, Ivan, Yi, Elton, Andrei and George Lolos (phone connection)
    3 KB (511 words) - 17:13, 24 February 2017
  • ''Attending: Brad, Alexey, Craig Mille (MIT); Elton, Eugene, Tim, Geore, Ettore, Glenn (JLab).
    4 KB (597 words) - 17:33, 18 October 2011
  • # Review Elton's method for choosing a value of R for a summed cell and implement it in cu ''David L., Elton S., Beni Z., Curtis M., Zisis P., Andrei S.''
    3 KB (461 words) - 06:37, 4 October 2011
  • # Electrical/cooling (Elton)
    878 B (125 words) - 13:19, 4 October 2011
  • ''David L., Elton, S., Pual M., Curtis M., Matt S., Eugene C., Beni Z.''
    4 KB (571 words) - 14:52, 11 October 2011
  • * '''JLab''': Mark Ito (chair), Elton Smith, Simon Taylor, Beni Zihlmann * Elton said that the uncertainties are large, but are "only" about a factor of 2 o
    5 KB (814 words) - 00:14, 1 April 2015
  • # Schedule, reporting, and manpower (Elton) # Geometry (Elton)
    3 KB (366 words) - 16:33, 13 October 2011
  • # Schedule, reporting, and manpower (Elton) ''Attending: Tina Mann, Scot, Carl, Elton, Ivan, Jack, Chuck, Jim, Yi.
    3 KB (524 words) - 17:56, 3 November 2011
  • * '''array that matches the start counter'''. Werner and Elton (independently) mentioned having an array that matches the area of the coun
    3 KB (536 words) - 06:05, 1 April 2015
  • ...e simulations with ntuples are resolved. Next week results will be shown. Elton, Will want histos and numbers from Andrei.
    5 KB (833 words) - 12:39, 14 March 2017
  • ''David L., Elton S., Eugene C., Beni Z., Matt S., Zisis P., George L., Andrei S., Curtis M.,
    2 KB (200 words) - 14:37, 7 November 2011
  • # Electrical/cooling (Elton) ''Attending: Elton, Yi, Tim, Beni (JLab); Zisis, Andrei (UofR); Will, Hayk, Ricardo, Alam (USM
    5 KB (754 words) - 17:12, 24 February 2017
  • # <strike> Elton to check availability of SiPMs and electronics to loan to Athens </strike> # <strike> Elton to update light guide specifications to change haze < 2% </strike> Sent upd
    4 KB (648 words) - 06:05, 1 April 2015
  • # Schedule, reporting, and manpower (Elton) ''Attending: Carl, Fernando, Chris, Chuck, Jim, Yi, John, Elton, Scot
    3 KB (469 words) - 08:45, 11 November 2011
  • ''Curtis M., Paul M., Eugene C., Elton S., David L., Andrei S., George L., Beni Z.,'' * Elton asked about the neutron rejection plots Andrei supplied and if the informat
    4 KB (620 words) - 17:22, 7 November 2011
  • ...2015 run to do positions, energies, z-ranges binning (e.g. 10 bins in z). Elton's estimate is 81 hours of beam time with the same rates as spring 2015.
    6 KB (888 words) - 12:39, 14 March 2017
  • ''Attending: Yi, David, Tim, Beni, John, Elton (JLab); Christina (Athens); Alam, Hayk (USM); Zisis, Andrei (UofR). #* Elton: Fernando has promised to order more compact electronics with summed output
    4 KB (652 words) - 18:42, 8 November 2011
  • * Elton Smith (Hall D contact for BCAL Readout)
    5 KB (662 words) - 12:40, 14 March 2017
  • #* <strike> Send Christina drawings of light guides, both versions (Elton) </strike> #* Send additional SiPMs to Athens for tests (Elton)
    6 KB (980 words) - 17:14, 24 February 2017
  • Participants: Curtis, Naomi, Beni, Simon, Lubomir, Elton, Mark, Dave
    2 KB (390 words) - 12:15, 14 November 2011
  • ''Attendees: David, Yi, Mark D., Elton, Beni (JLab), Will (CMU), Christina, Pavlos, George Voulgaris, Stratos (Ath # Any other business: Elton will send questions on the BCAL Calibration Document [https://halldweb.jlab
    4 KB (697 words) - 17:13, 24 February 2017
  • # <strike> Check on status of shipping of bcal slices (Elton) </strike> # <strike> Elton to send monitoring specification to Jim. </strike>
    4 KB (606 words) - 06:07, 1 April 2015
  • # Electrical/cooling (Elton) ...l, Alam, Ricardo, Sergey tried unsuccessfully to connect (USM); Tim, Carl, Elton, Yi (JLab); Zisis, George (UofR); Christina (Athens)
    5 KB (867 words) - 17:53, 29 November 2011
  • # Schedule, reporting, and manpower (Elton)
    438 B (47 words) - 17:10, 30 November 2011
  • #* Send additional SiPMs to Athens for tests (Elton) ...e, Andrei (UofR); Alam, Ricardo (USM); Christina, George, Pavlos (Athens); Elton, David, Yi, John D., Eugene, John L. (Jlab); Matt, Kei (IU);
    4 KB (658 words) - 16:48, 24 February 2017
  • * Prior to the meeting Elton suggested we need to identify an outside reviewer for each document, where
    6 KB (962 words) - 14:25, 31 March 2015
  • #* Send additional SiPMs to Athens for tests (Elton)
    1 KB (207 words) - 16:54, 24 February 2017
  • Participants: Curtis, Naomi, Beni, Eugene, Simon, Mark, Elton, Dave, Lubomir # Elton asked, in case a wire is broken is there a way to insulate it from the rest
    2 KB (303 words) - 13:09, 5 January 2012
  • ....jlab.org/doc-private/DocDB/ShowDocument?docid=2057 Contract and MOUs] --- Elton Smith. ...ssionid=380 DAQ/Online/Slow Controls] -(Organizer: Elliott Wolin) - Chair: Elton Smith
    10 KB (1,216 words) - 12:38, 14 March 2017
  • ....jlab.org/doc-private/DocDB/ShowDocument?docid=1984 Contract and MOUs] --- Elton Smith.
    10 KB (1,238 words) - 12:38, 14 March 2017
  • #* Send additional SiPMs to Athens for tests (Elton). Electronics is being prepared, should be ready by next week sometime. ''Attending: Alam, Will, Hayk, Javiera (new production manager) (USM); Elton, John L., Tim, David, John D., Eugene (Jlab); Kei tried unsuccessfully to c
    5 KB (735 words) - 04:25, 1 April 2015
  • #* Send additional SiPMs to Athens for tests (Elton). Electronics is being prepared, should be ready by next week sometime. ''Attending: David, Tim, Beni, John L., John D., Elton (JLab); Will, Serguei (USM); Zisis, George, Andrei (UofR); George, Christin
    6 KB (838 words) - 17:12, 24 February 2017
  • Participants: Curtis, Naomi, Dave, Beni, Mark, Elton, Tim, Mark, Lubomir, Simon ...Paul Mattione, Naomi Jarvis, Beni Zihlmann, David Lawrence, Simon Taylor, Elton Smith, Mark Ito, Lubomir Pentchev, Matt Shepherd, Ryan Mitchell, Kei Moriya
    5 KB (697 words) - 13:07, 1 February 2012
  • * '''USA''': Chuck Hutton, Mark Ito (chair), Elton Smith
    2 KB (240 words) - 23:18, 31 March 2015
  • # Schedule, reporting, and manpower (Elton) ''Attending: Chris, Ivan, Elton, Jim, Yi, Carl, Eugene, Tom
    2 KB (352 words) - 18:33, 12 January 2012
  • # Schedule, reporting, and manpower (Elton) ''Attending: Jack, Carl, Chris, Alex, Ivan, Tom, Jim, Yi, Elton, Eugene, (Note: Scot is out on sick leave till 17)
    3 KB (426 words) - 19:24, 5 January 2012
  • * '''JLab''': Fernando Barbosa, Mark Ito, Elton Smith, Tim Whitlatch, Beni Zihlmann, Carl Zorn
    2 KB (387 words) - 18:50, 5 January 2012
  • #* [[Media:Comparison.pdf | Comparison of PDE measurements in literature]] (Elton) ''Attending: Javiera, Hayk, Will, Serguei (USM); Elton, Yi, John, Beni, Tim (Jlab); Zisis, Mehrnoosh, George, Andrei (UofR); Georg
    5 KB (820 words) - 17:08, 24 February 2017
  • # Schedule, reporting, and manpower (Elton) ''Attending:Chris, Yi, John, Elton, Chuck, Jim, Scot, Ivan, Jack, Eugene
    2 KB (326 words) - 18:39, 19 January 2012
  • ...Howard Fenker <hcf@jlab.org>, Eugene Chudakov <gen@jlab.org>, Elton Smith <elton@jlab.org>,
    14 KB (1,875 words) - 17:12, 24 February 2017
  • Eugene Chudakov <gen@jlab.org>, Elton Smith <elton@jlab.org>,
    3 KB (401 words) - 09:07, 12 January 2012
  • #* Send additional SiPMs to Athens for tests (Elton). Electronics is out for fabrication #* Create outline to assign writing homework (Elton)
    5 KB (765 words) - 17:44, 31 January 2012
  • # Schedule, reporting, and manpower (Elton) ''Attending: Carl, Jack, Scot, Chris, Ivan, Yi, Jim, Howard Fenker, John, Elton, Eugene.
    3 KB (375 words) - 10:19, 27 January 2012
  • # [[Media:Comparison.pdf | Comparison of PDE measurements in literature]] (Elton) ''Attending: Mehrnoosh, Andrei, George, Mermoose (UofR); Carl, Yi, Elton, Eugene (JLab); Will, Serguei, Hayk, Remski (USM)
    6 KB (765 words) - 17:12, 24 February 2017
  • ''Attending: Elton, Eugene, John L., John C., Yi, Sasha, Beni, Tim (Jlab); Will, Hayk, Javiera ##* Elton: The electronic boards and components have been received. Chris is getting
    6 KB (962 words) - 10:37, 31 March 2015
  • # Schedule, reporting, and manpower (Elton) ''Attending: Chris, Jim, Ivan, Carl, Yi, Elton, Jack, Scot, Eugene
    3 KB (506 words) - 18:57, 2 February 2012
  • # Progress in MOUs, contracts and procurement (Elton/Curtis)
    569 B (72 words) - 16:52, 24 February 2017
  • #* Send additional SiPMs to Athens for tests (Elton). Electronics is out for fabrication #* <strike> Create outline to assign writing homework (Elton) </strike>
    7 KB (930 words) - 16:58, 24 February 2017
  • # Schedule, reporting, and manpower (Elton) ''Attending: Jack,, Carl, Scot, Chris, Yi, John, Elton, Jim, Eugene
    3 KB (365 words) - 12:58, 10 February 2012
  • ## SiPMs/LGs/Cooling (Elton, Fernando, Scott) ## Run plan (Elton, Zisis)
    6 KB (921 words) - 16:07, 31 March 2015
  • # Schedule, reporting, and manpower (Elton) ''Attending: Jack, Elton, John, Yi, Nick, Jim, Chuck
    2 KB (333 words) - 18:31, 23 February 2012
  • #* Send additional SiPMs to Athens for tests (Elton). Boards have been fabricated, but still need testing. ''Attending: Elton, Eugene, John D., Beni, Yi, David, Sasah, Tim, John L. (JLab); Christina, G
    5 KB (827 words) - 10:32, 31 March 2015
  • #* <strike> Investigate if Hall B chiller is available for our use (Elton) </strike> Chiller will be used for the HPS beamtest. #* Draft a run plan (Elton and Zisis)
    6 KB (971 words) - 18:02, 31 March 2015
  • Participants: Curtis, Naomi, Beni, Simon, Lubomir, Elton, Dave
    4 KB (603 words) - 21:02, 31 March 2015
  • Participants: Bill, Dave, Nick, Elton, Mark, Simon, Beni, and Lubomir. ...brackets. Bill offered two options, aluminum or G10, but prefers aluminum. Elton after checking the radiation lengths (what matters for the photon conversio
    5 KB (806 words) - 22:47, 31 March 2015
  • Present: Steve Christo, Jim Fochtman, Mark Ito, Dave Kashy, Chris Keith, Elton Smith, Tim Whitlatch, Elliott Wolin
    1 KB (147 words) - 23:09, 31 March 2015
  • # Schedule, reporting, and manpower (Elton) ''Attending: Jack, Carl, Jim, Chris, Chuck, Scot, Eugene, Nick, Yi, Elton.
    3 KB (444 words) - 18:44, 1 March 2012
  • * Present: Richard J., Alex B., Nathan S., Tim W., Alex D., Elton S., Eugene C., Dan S., Curtis M., Alex S., Brendan P., Mark S., Hovanes E.,
    1 KB (175 words) - 13:11, 29 February 2016
  • #* Send additional SiPMs to Athens for tests (Elton). Electronics is out for fabrication
    1 KB (203 words) - 09:43, 29 February 2012
  • ** [Added in press] Elton Smith pointed out that it is not a good idea to put any pressure on the sci Paul is working on documents to respond the the RFP. Elton sent him examples from the Indiana contract; Paul has found them helpful.
    3 KB (530 words) - 17:13, 24 February 2017
  • # Schedule, reporting, and manpower (Elton) ''Attending: Nick, Jim, Elton, Fernando, Yi, Chris, Jack, Scot, Carl
    4 KB (643 words) - 08:34, 16 March 2012
  • * Mark reported Elton's concern about avoiding putting pressure on the scintillator to prevent cr
    2 KB (392 words) - 00:14, 1 April 2015
  • #* Draft a run plan (Elton and Zisis) # [[BCAL Beam Tests 2012]] - Updates since last week(Elton)
    5 KB (784 words) - 23:37, 31 March 2015
  • #* <strike> Send additional SiPMs to Athens for tests (Elton). </strike> Shipment has been prepared and permission from DOE has been gr Attending: Elton, Beni, John, Tim, David, Eugene (JLab); Will, Iñaki, Sergei, Alam, Javiera
    6 KB (946 words) - 03:38, 1 April 2015
  • * password: the normal "halld" password as gluon linux boxes, or ask Elton to get it
    17 KB (2,476 words) - 17:49, 5 January 2016
  • * Elton's Gluex presentation
    603 B (85 words) - 09:00, 9 March 2012
  • ''Attending: Elton, David, Tim (JLab); Will, Sergey, Orlando, Javiera, Hayk, Iñaki (USM): Mat #* Elton asked Matt and Zisis to review labels for Fcal and Bcal, respectively
    8 KB (1,161 words) - 00:08, 1 April 2015
  • # Schedule, reporting, and manpower (Elton) ''Attending: Fernando, Jack, Carl, Chuck, Tina, Yi, Jim, Tom, Elton, Chris
    3 KB (518 words) - 17:12, 22 March 2012
  • * Elton's Gluex presentation [[Media:Detector_basics.pdf]]
    604 B (85 words) - 09:35, 23 March 2012
  • Attendees: ''Naomi J., Beni Z., Lubomir P., David L.(chair), Elton S.''
    3 KB (544 words) - 16:52, 24 February 2017
  • #* <strike> Send excel sheet with progress information to Elton. (Francisco) </strike> ''Attendees:Elton, David, Dan, Yi, Beni (JLab); Alam, Javiera, Francisco, Ricardo (USM); Matt
    4 KB (549 words) - 15:14, 9 October 2012
  • #* Draft a run plan (Elton and Zisis)
    1 KB (204 words) - 23:37, 31 March 2015
  • ...data sheets from Chile to be used as input to jumper settings for boards (Elton) # Schedule, reporting, and manpower (Elton)
    3 KB (422 words) - 17:11, 29 March 2012
  • * '''JLab''': Chuck Hutton, Mark Ito, Elton Smith, Tim Whitlatch, Beni Zihlmann
    744 B (122 words) - 12:34, 31 March 2015
  • ''Attending: David, Sasha, Tim, Beni, John D., Yi, John L., Hovanes, Eugene, Elton (JLab); Matt (IU); Christina, Pavlos, George (Athens); Orlando, Javiera, Wi
    5 KB (802 words) - 15:45, 10 April 2012
  • * Elton Smith Eugene supported Elton's suggestion that the C-channel "clamp" miss the scintillator and hold the
    3 KB (429 words) - 22:50, 31 March 2015
  • ...data sheets from Chile to be used as input to jumper settings for boards (Elton) # Schedule, reporting, and manpower (Elton)
    3 KB (441 words) - 17:13, 12 April 2012
  • ''Attending: Matt (IU), Yi, Eugene, John D., John L., Elton, Beni (JLab); Christina, Pavlos, George (Athens) #* Elton should check status of control boards at JLab
    4 KB (571 words) - 08:51, 25 April 2012
  • Attendees: David L., Mark I., Elton S., Curtis M., Matt S.
    5 KB (684 words) - 16:55, 24 February 2017
  • ...data sheets from Chile to be used as input to jumper settings for boards (Elton) # Schedule, reporting, and manpower (Elton)
    606 B (77 words) - 17:02, 12 April 2012
  • - found clog in quick disconnect (Elton, Alex, Yi, John) temps dropped by few degrees C, still +3 C on downstream s - swapped flow direction from down to up to up to down (Elton, John) and downstream stayed +3C, confirming hypothesis of poor thermal con
    1,010 B (168 words) - 14:57, 16 April 2012
  • #* <strike> Draft a run plan (Elton and Zisis) </strike> ''Attending: Elton, Tim, Fernando, Andrei, Irina, Eugene, Beni (JLab); Orlando, Javiera, Sergu
    4 KB (610 words) - 11:33, 31 March 2015
  • #* <strike> Draft a run plan (Elton and Zisis) </strike> ''Attending: Elton, Beni, John, Yi (JLab); Will (USM); Andrei (UofR)
    4 KB (661 words) - 18:02, 31 March 2015
  • ...d reported on an ad hoc meeting held last week with Irina, Andrei Semenov, Elton Smith, and Eugene Chudakov to discuss the BCAL. One topic was now we smear
    6 KB (965 words) - 15:57, 31 March 2015
  • ...lexiglas support, and space between window frames on glass and plexiglass (Elton, Tim) #* Check status of monitoring control boards at JLab (Elton).
    2 KB (216 words) - 08:49, 25 April 2012
  • ...data sheets from Chile to be used as input to jumper settings for boards (Elton) </strike> # Schedule, reporting, and manpower (Elton)
    3 KB (511 words) - 18:07, 26 April 2012
  • ...n the ESB for gluing light guides. Prepare a plan for production testing. (Elton, Tom) </strike> # Schedule, reporting, and manpower (Elton)
    4 KB (718 words) - 09:02, 11 May 2012
  • * Elton Smith - ''eltonssmith''
    564 B (72 words) - 12:02, 18 July 2022
  • # <strike> Send drawings of light guide gauges to USM (Elton) </strike> sent e-mail yesterday #* [https://cebaf.jlab.org/elog/elog.php?logbook=HDFCALTEST Updates] (Elton)
    5 KB (849 words) - 23:59, 31 March 2015
  • * '''JLab''': Mark Ito (chair), Elton Smith, Tim Whitlatch, Beni Zihlmann ...sue for this detector and to save real estate. That having been said, both Elton and Werner were in favor of including it if possible. One question is wheth
    3 KB (558 words) - 06:35, 1 April 2015
  • # Preliminary look at pulse heights and times (Elton) # Considerations in choosing the SiPM operating voltage (Notes by Elton)
    2 KB (261 words) - 10:30, 31 March 2015
  • # See Elton's new Wiki page for Spring 2016 run preparations ...(Athens), Will, Curtis (CMU), Noemi, Tegan, Ahmed, Zisis, Andrei (Regina), Elton, Mark (JLab) "
    4 KB (553 words) - 17:12, 24 February 2017
  • * '''JLab''': Chuck Hutton, Mark Ito, Elton Smith, Tim Whitlatch, Beni Zihlmann ...filed with JLab Procurement. The committee members were Beni, Dan Carman, Elton, Bruce Lenzer, and Mark. Eugene Chudakov was present at the review meeting.
    3 KB (440 words) - 04:25, 1 April 2015
  • # Schedule, reporting, and manpower (Elton) # Beam test experience (Elton)
    3 KB (501 words) - 16:21, 24 May 2012
  • # Progress in MOUs, contracts and procurement (Elton/Curtis)
    525 B (67 words) - 11:33, 31 March 2015
  • * On simulating sampling fluctuations in the BCAL, David reported that Elton Smith has summarized the discussion held when Andrei and Irina Semonov(a) w
    5 KB (829 words) - 17:23, 31 March 2015
  • ## Gain of pre-amplifier. Elton suggested to set the nominal bias to Vover=1.2 V. With this configuration, ''Attending: Elton, Beni, Dvid, Tim (Jlab); Zisis (UofR); Will, Serguei, Javiera, Iñaki, Orla
    7 KB (1,092 words) - 23:59, 31 March 2015
  • ...eb.jlab.org/doc-private/DocDB/ShowDocument?docid=2147 Contract Status] --- Elton Smith ...ssion Ib (145) --- Electronics/Trigger - (Organizer: Sascha Somov) - Chair:Elton Smith
    8 KB (1,048 words) - 12:39, 14 March 2017
  • # Schedule, reporting, and manpower (Elton) # Beam test experience (Elton)
    3 KB (409 words) - 17:31, 21 June 2012
  • ...lexiglas support, and space between window frames on glass and plexiglass (Elton, Tim)
    4 KB (667 words) - 16:01, 6 June 2012
  • ''Attendees: Fernando, Elton, Eugene, Beni (JLab), George, Andrei, Zisis (Regina)''
    2 KB (285 words) - 17:27, 18 June 2012
  • ''Attending: Elton, Beni, David, John, Ben, Yi, Tim (Jlab); Will, Javiera, Orlando, Iñaki (US ##* Elton: Checking signals on scope can be very informative.
    5 KB (754 words) - 15:57, 31 March 2015
  • ...lexiglas support, and space between window frames on glass and plexiglass (Elton, Tim) ''Attendees: Elton, David, Beni, Tara, Tim, Eugene (JLab); Zisis, Andrei (UofR); Javiera, Will
    5 KB (734 words) - 14:26, 19 June 2012
  • * Elton Smith - ''eltonssmith''
    743 B (107 words) - 08:38, 19 June 2012
  • ...lexiglas support, and space between window frames on glass and plexiglass (Elton, Tim) </strike> Appears that the 3 1.5" holes are adequate. #* <strike> no-cost schedule extension for Fcal (Elton) </strike> Extension has been signed.
    6 KB (832 words) - 01:50, 1 April 2015
  • # Schedule, reporting, and manpower (Elton) ''Attending:Jack, Nick, Chris, Elton, Jim, Eugene
    2 KB (336 words) - 16:20, 5 July 2012
  • * Elton Smith - ''eltonssmith'' Attendees: Rory M., David L., Sasha M., Elton S.
    648 B (100 words) - 14:00, 26 June 2012
  • #* <strike> Check on payment for first article delivery (Elton) </strike> Payment has been made ''Attending:Elton, John, Zisis, Shaun, Tara, Eugene, Yi, Tim (Jlab); Will, Javiera, Orlando,
    5 KB (724 words) - 03:04, 1 April 2015
  • #* <strike> When to ship structure to JLab? (Elton and Tim to review schedule) </strike> Should be ready by mid to late August ''Attendees: David, Beni, Tara, Elton, Yi, John L. (Jlab); Zisis, Andrei (UofR); George, Stratos, Christina (Athe
    8 KB (1,196 words) - 18:34, 17 July 2012
  • # <strike> Complete molds for wrapping and order forms (Jim) </strike> Elton to test wrapping forms. # Schedule, reporting, and manpower (Elton)
    3 KB (535 words) - 17:31, 26 July 2012
  • #* <strike> Understand how Orlando's data relates to the SiPM specifications (Elton et al) </strike> ''Attending: Zisis, Andrei (UofR); Tim, Elton, Ben, David, Yi, Beni, Eugene (JLab); Alam, Will, Javiera (USM)
    5 KB (723 words) - 12:38, 14 March 2017
  • Present: Elliott W, Simon T, Elton S, Vanik K, Beni Z, Dave A, Vardan G, Dave L.
    6 KB (974 words) - 02:55, 1 April 2015
  • ''Attendees: Elton, David, Tim, Yi, Manuel, Dan, Beni, Eugene (JLab); Wil, Sergey, Javiera, Or ##* Elton: How much time does it take to machine and polish each piece? Answer: 20 mi
    4 KB (692 words) - 17:11, 24 February 2017
  • <!--Attendees: Albert F., Andrew S., Elton S., Iliya L., Mark I., Rory M., Nick B., Vambow-->
    2 KB (280 words) - 07:39, 8 July 2020
  • * '''JLab''': Mark Ito (chair), Manuel Lara, David Lawrence, Paul Mattione, Elton Smith, Simon Taylor, Elliott Wolin, Beni Zihlmann
    4 KB (636 words) - 11:11, 31 March 2015
  • ...tage (Orlando): Correct equation 3 on p5, according to the discussion with Elton and Yi from two weeks ago. See plots starting on p34. Repeated measuremen
    3 KB (514 words) - 12:38, 14 March 2017
  • # Test wrapping forms (Elton) # Schedule, reporting, and manpower (Elton)
    3 KB (500 words) - 18:41, 9 August 2012
  • ''Attendees: John, Beni, David, Yi, elton, Tim, Eugene, Manuel, Dan (JLab); Hayk, Javiera, Iñaki, Will (USM); Zisis, ## Installation of monitoring boards (Elton)
    8 KB (1,260 words) - 17:12, 24 February 2017
  • * Elton Smith - ''eltonssmith''
    548 B (68 words) - 14:20, 5 August 2012
  • * <strike> Elton to check light guide delays versus FastTrack and inform us if we are on a c ''Attending:Elton, Beni, Yi, Eugene, David (JLab); Zisis, Andrei (UofR); Javiera, Hayk, Iñak
    4 KB (652 words) - 15:22, 21 August 2012
  • # <strike> Test wrapping forms (Elton) </strike> Tara and Elton used the pattern prepared by Jim and checked the fit. The pattern can be ex ...Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
    4 KB (639 words) - 17:02, 16 August 2012
  • # <strike> Send table of light guide measurements for Elton and Tim to review for acceptability (Iñaki) </strike> # <strike> Check on Fcal monitoring board review (Elton and Fernando) </strike> Fernando has reviewed the drawings and has approved
    7 KB (1,142 words) - 17:02, 24 February 2017
  • * Elton Smith - ''eltonssmith'' Attendees: Rory M., David L., Sasha M., Elton S., Candace H.
    2 KB (320 words) - 16:23, 16 August 2012
  • ...Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) # <strike> Clarify option of purchase of additional SiPMs (Elton) </strike>
    3 KB (494 words) - 08:20, 24 August 2012
  • * Elton Smith - ''eltonssmith'' David reported on Elton's behalf that a draft of the MOU needed for Sergey Gevorgyan's visit has be
    3 KB (418 words) - 11:35, 13 September 2012
  • ...Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) # Schedule, reporting, and manpower (Elton)
    3 KB (384 words) - 18:06, 30 August 2012
  • *'''JLab''': Mark Ito (chair), Elton Smith, Simon Taylor
    3 KB (534 words) - 11:26, 29 August 2012
  • #* <strike> Elton will work on the Bcal readout section </strike> Checked in initial draft ''Attending: Elton, Dan, David, Yi, Beni, Tim, Eugene (JLab); Javiera, Will, Alam (USM); Georg
    7 KB (1,008 words) - 18:37, 11 September 2012
  • Participants: Curtis, Naomi, Beni, Lubomir, Simon, Elton, Mark
    2 KB (269 words) - 18:08, 29 August 2012
  • Participants: Fernando, Bill, Dave, Elton, Simon, Chris, Vlad, Beni, and Lubomir
    6 KB (982 words) - 05:48, 1 April 2015
  • ...Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) # Schedule, reporting, and manpower (Elton)
    3 KB (491 words) - 17:00, 13 September 2012
  • * Elton Smith - ''eltonssmith'' Attendees: Rory M., Sasha M., Elton S., David L.
    3 KB (429 words) - 14:51, 14 September 2012
  • ...rd J., James M., Brendan P., Alex B., Fridah M., Dan S., Mike D., Mike M., Elton S., Yi Q., Ivan T., Tim W., Franz K., Curtis M., and Eugene C.
    1 KB (171 words) - 12:40, 14 March 2017
  • Attending: Sean (NU); Curtis, Elton, Simon, Adesh, Mark I., Paul, Alex B., Nathan (JLab); Will M., Naomi (CMU);
    7 KB (1,160 words) - 17:04, 24 February 2017
  • # [https://logbooks.jlab.org/entry/3367636 Fcal response to charged tracks] (Elton)
    2 KB (225 words) - 17:00, 15 December 2015
  • ''Attendees: Dan, Manuel, Elton, David, Tim, Beni, Yi, John, Eugene (JLab); Shaun, Zisis, Andrei (UofR); Ch ##* Cover in front of array is 2x1/16" flame retardant ABS plastic. Elton: Is there a beam hole? No, but one will be added
    7 KB (1,003 words) - 19:44, 31 March 2015
  • * Elton Smith (Hall D Staff)
    2 KB (265 words) - 11:31, 18 September 2012
  • ...Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) # Schedule, reporting, and manpower (Elton)
    4 KB (555 words) - 16:50, 24 February 2017
  • Present: Elliott W, Josh B, Hovanes E, Dave B, Manuel L, Dan B, Elton S.
    2 KB (351 words) - 17:12, 24 February 2017
  • ''Attending: Elton, David, Ivan, Yi, Beni, Eugene (JLab); Shaun, Zisis, Andrei (UofR); Stratos #* Elton: Please send the data electronically. [Note: Stratos has already shipped th
    5 KB (706 words) - 17:14, 24 February 2017
  • ''Attending: Christina, Stratos (Athens); Elton, David, Yi, Tim, Eugene (JLab); Will, Alam, Javiera (USM) #* Elton: jerry-rigged a new string of LEDs to trigger T3 perpendicular to the small
    5 KB (802 words) - 17:12, 24 February 2017
  • ...Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) # <strike> Provide feedback to Fernando on his readout assembly schedule (Elton and Jim) </strike>
    3 KB (441 words) - 07:19, 19 October 2012
  • * Elton Smith - ''eltonssmith'' Attendees: Rory M., Candace H., Sasha M., David L., Elton S.
    1 KB (155 words) - 15:39, 21 September 2012
  • # Progress in MOUs, contracts and procurement (Elton/Curtis)
    657 B (89 words) - 07:58, 2 October 2012
  • * '''JLab''': Chuck Hutton, Mark Ito (chair), Elton Smith, Tim Whitlatch, Beni Zihlmann ...Two rods have been purchased from the new company. They will be evaluated. Elton suggested using a laser and visually observing the amount of scattering to
    3 KB (477 words) - 21:45, 31 March 2015
  • * Elton Smith - ''eltonssmith'' Attendees: Rory M., Candace H., Sasha M., David L., Elton S.
    470 B (57 words) - 09:17, 28 September 2012
  • * Elton Smith - ''eltonssmith'' # Generated and Reconstructed Kinematics at nominal target position (Elton)
    2 KB (221 words) - 09:52, 12 October 2012
  • ...pane and TOF detector and rerun simulation to check photon reconstruction (Elton to see if Beni or Richard can add the geometry)
    4 KB (696 words) - 06:40, 24 October 2012
  • ...Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) # mini-Bcal (Elton)
    3 KB (527 words) - 10:15, 2 November 2012
  • ...Ann Marie C., Brendan P., James M., Alex S., Todd S., Nathan S., Mark D., Elton S., Franz K., Mike D., Bill C., Yi Q., Dan S., Natalie W., Franz K. and Eug ...b.org/doc-private/DocDB/ShowDocument?docid=2376 Detector Specifications] - Elton
    1 KB (178 words) - 17:13, 24 February 2017
  • ...ab: ''': Alex Austregesilo, Alex Barnes, Thomas Britton, Mark Ito (chair), Elton Smith
    6 KB (902 words) - 19:11, 15 November 2017
  • # <strike> Add Fcal dead channels into the MC. [Matt and Elton] </strike> See links below ''Attendees: Elton, Mark, Colin, Simon (JLab); Sean (FSU); Matt, Jon (IU); George (Athens); Zi
    7 KB (1,126 words) - 15:00, 14 December 2017
  • # Add Fcal dead channels into the MC. [Matt and Elton] '' Attendees: Elton, Mark, Simon (JLab); Will (CMU); Christina, George (Athens); Jon (IU); Sean
    7 KB (995 words) - 13:59, 30 November 2017
  • ...n P., Eugene C., Alex S., Curtis M., Franz K., Barry R., Mike D., Igor S., Elton S., Yi Q., Dan S.
    1 KB (217 words) - 11:27, 17 October 2012
  • * Elton Smith - ''eltonssmith'' Attendees: Rory M. (chair), Candace H., Elton S., David L., Sasha M.
    2 KB (244 words) - 10:05, 19 October 2012
  • Present: Elliott W, Dan B, Manuel L, Josh B, Dave B, Hovanes E, Elton S.
    3 KB (385 words) - 16:54, 24 February 2017
  • #* Provide feedback on measurements described on the wiki (Elton). ''Attending:Elton, Ivan, David, Beni, Eugene, Yi (JLab); Alam, Javiera, Will, Hayk (USM); Chr
    5 KB (702 words) - 07:10, 1 April 2015
  • ...pane and TOF detector and rerun simulation to check photon reconstruction (Elton to see if Beni or Richard can add the geometry) ''Attendees:John, Dan, Elton, Yi, Ivan, David (JLab); Will, Hayk, Francisco, Alan (USM); Christina, Geor
    5 KB (794 words) - 19:02, 6 November 2012
  • ''Attending: Elton, David, Ivan , Beni, Yi, Eugene (JLab); Will, Alam, Orlando, Ricardo, Hayk ...that modifications to the data base were conducted based on feedback that Elton provided to the description of items on the wiki.
    5 KB (795 words) - 14:39, 13 November 2012
  • ...f these in a previous collaboration meeting. David has contacted Zizis and Elton on this and has identified the relevant drawings. A fix is on the way. In a
    4 KB (629 words) - 14:25, 31 March 2015
  • * Elton Smith - ''eltonssmith'' ...re still missing the azimuthal distribution of the &pi;&pi; system (not in Elton's plots)
    2 KB (353 words) - 08:13, 9 November 2012
  • # <strike> Fcal cabling (Elton to find out status of cables ordered by JLab and status of labeling) </stri # <strike> Fcal contract extension (Elton to verify all is completed) </strike> Contract extension is in place.
    5 KB (743 words) - 10:50, 31 March 2015
  • ...Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) </strike> Decided to have a separate patch panel, which allo ...ularity of LED bias and power, as well as multiplicity of trigger signals (Elton) </strike>
    4 KB (599 words) - 17:40, 6 December 2012
  • Present: Elliott W, Simon T, Dave L, Bruyan M, Hovanes E, Elton S.
    4 KB (620 words) - 22:03, 31 March 2015
  • * Elton Smith - ''eltonssmith''
    2 KB (283 words) - 17:26, 9 November 2012
  • Present: Curtis, Naomi, Beni, Eugene, Simon, Elton, Mark
    2 KB (327 words) - 16:44, 6 December 2012
  • ...mments a concept for distributing monitoring inputs to the control boards (Elton) </strike> See [https://mailman.jlab.org/pipermail/halld-cal/2012-November/ ...pane and TOF detector and rerun simulation to check photon reconstruction (Elton to see if Beni or Richard can add the geometry) </strike> Beni has agreed t
    7 KB (1,211 words) - 08:40, 21 November 2012
  • * Elton Smith - ''eltonssmith''
    705 B (80 words) - 04:03, 30 November 2012
  • ''Attendees: Elton, Mark, Wil, Jon, Adesh, Simon (Jlab); George, Christine (Athens); Mike (CMU ##* There was discussion on what could be the source of the discrepancies. Elton noted that the trigger simulation in MC may be one source of the difference
    7 KB (1,164 words) - 12:39, 14 March 2017
  • ''Attendees: Elton, David, John, Yi, Beni (JLab); Hayk, Will, Alam, Orlando (USM); Shawn, Zisi ##* Elton: IU should propose the dynamic range of signals required for the LED monito
    4 KB (539 words) - 17:10, 24 February 2017
  • ...Confirm with Fernando that the labeling of boards U1-U48 and D1-D48 is ok (Elton) </strike> # <strike> Make decisions on how to treat sensors with high dark rate (Elton) </strike> They satisfy our specifications. Use along with others.
    3 KB (480 words) - 17:33, 28 February 2013
  • * Elton Smith - ''eltonssmith''
    628 B (75 words) - 15:09, 6 December 2012
  • ''Attending: David, Yi (Jlab), Elton (GSI), Hayk (USM), Christina, Pavlos (Athens), Shaun, Andrei, Zisis (Regina ...by Kappos. Delivery will be after XMas. Christina will communicate with Elton to arrange the shipments in view of minimizing customs duty.
    4 KB (583 words) - 11:36, 12 December 2012
  • * Elton Smith - ''eltonssmith''
    558 B (63 words) - 09:39, 14 December 2012
  • * '''JLab''': Mark Ito (chair), David Lawrence, Yi Qiang, Dmitry Romanov, Elton Smith, Simon Taylor, Beni Zihlmann
    6 KB (990 words) - 15:09, 18 December 2012
  • ''Attendees:Elton, John L., David, Yi, Eugene, Lubomir, Beni (JLab); Hayk, Will, Orlando, Ala ##* Elton: Inquired about the mylar sheet inserted between the mu-metal and the iron.
    7 KB (1,061 words) - 00:14, 1 April 2015
  • ''Attending: Elton, Beni, David, Yi (JLab); Christina, Pavlos (Athens); Shaun, Zisis, Andrei ( #* Elton and Christine will work out shipping details offline.
    4 KB (573 words) - 18:37, 15 January 2013
  • * Elton Smith - ''eltonssmith''
    1 KB (134 words) - 09:44, 4 January 2013
  • #* <strike> Work out shipping details (Elton and Christina) </strike> Two packages shipped, should arrive today. ''Attending: Elton, Beni, Yi, Fernando, David (JLab); Zisis, Andrei (UofR); Christina, George
    7 KB (1,021 words) - 06:42, 1 April 2015
  • # Light guides (Elton) ''Attending: Elton, Tom, Tina, Chris, Nic, Fernando, Jim, Yi
    2 KB (300 words) - 19:02, 14 February 2013
  • * Elton Smith - ''eltonssmith'' Attendees: Rory, Sasha, Elton.
    2 KB (362 words) - 13:04, 11 January 2013
  • ...mewalk calibration plugin to use the RF as a reference instead of the PS. Elton mentioned that Alex had said before that he got different results if he use
    9 KB (1,509 words) - 19:08, 24 February 2016
  • ''Attendees: Elton, John, Shaun, Beni, Yi, Eugene, David, Tim (JLab); Christina, Pavlos (Athen ##* Bcal production including testing (Elton)
    6 KB (933 words) - 17:11, 24 February 2017
  • * Elton Smith (Hall D Staff)
    5 KB (602 words) - 20:27, 1 March 2013
  • ...rg/doc-private/DocDB/ShowDocument?docid=2212 Update MOUs and Contracts] -- Elton Smith. ...yMeeting?sessionid=413 Electronics] - (Organizer: Fernando Barbosa) Chair: Elton Smith
    9 KB (1,108 words) - 12:38, 14 March 2017
  • ...private/DocDB/ShowDocument?docid=2398 Preparations for Commissioning] --- Elton Smith ...e/DocDB/DisplayMeeting?sessionid=455 Tracking] - (Organizer: Beni ) Chair: Elton Smith
    10 KB (1,265 words) - 12:39, 14 March 2017
  • ''Attending: Elton, David, Yi, Tim, Beni (JLab); Hayk, Orlando, Alam, Serguei, Elias, Will (US ##* Elton: Three non-conforming guides shipped back to Chile are stuck in customs in
    5 KB (758 words) - 17:14, 24 February 2017
  • * Elton Smith - ''eltonssmith''
    613 B (70 words) - 10:19, 31 January 2013
  • * Elton Smith - ''eltonssmith'' Elton reported to Dave prior to the meeting that Sergey has tickets to come on Fe
    834 B (107 words) - 17:09, 28 January 2013
  • Attending: Elton, Yi, Beni, David, Eugene, Sasha (JLab); Christina, Pavlos, Stratos (Athens) #* Elton: How long to complete project once acceptance is completed? Most parts are
    7 KB (1,057 words) - 11:36, 31 March 2015
  • #* <strike> Elton to e-mail Hamamatsu regarding shipment of 360 MPPCs to inquire status. </st ...rike> Take special runs to understand the nature of the "reflected" pulse (Elton and Shaun) </strike>
    4 KB (620 words) - 14:39, 19 February 2013
  • * Elton Smith - ''eltonssmith'' Attendees: Elton S., David L., Rory M., Sergey G., Sasha M.
    906 B (111 words) - 10:03, 14 February 2013
  • ''Attendees: John, Elton, Beni, David, Yi (JLab); Stratos, George (Athens); Kei (IU), Serguei, Will, #* Elton: Requested that Athens prepare a draft specification, so that the process c
    6 KB (867 words) - 17:13, 24 February 2017
  • * Elton Smith - ''eltonssmith''
    1 KB (133 words) - 10:04, 14 February 2013
  • #* Nick to send location of files with the SiPM assignment information to Elton and Yi. ''Attending: Elton, Chris, tina, Tim, Nic, Yi, Jim
    3 KB (445 words) - 06:44, 19 April 2013
  • ...allation Plan ([[Media:Fcal_assembly_schedule_v0.pdf | Draft schedule from Elton]]) (Matt) JLab: Hovanes, Elliott, Tim, Mark, John, Dan, Elton
    3 KB (474 words) - 17:12, 24 February 2017
  • #* <strike> Provide actual copy of proforma invoice from Jlab (Elton) </strike> #* <strike> Get a count of non-conforming light guides (Elton) </strike>
    6 KB (865 words) - 17:13, 24 February 2017
  • # Progress in MOUs, contracts and procurement (Elton/Curtis)
    788 B (102 words) - 18:55, 21 February 2013
  • ''Attendees'': Elton, David (JLab); George, Zisis, Shaun, Andrei (UofR) Elton gave a detailed overview of the current and planned BCAL activities and tim
    4 KB (700 words) - 00:15, 27 February 2013
  • # Provide lists of SiPMs to Nic and Chris to facilitate sorting (Elton) # Light guides (Elton)
    2 KB (341 words) - 17:59, 28 February 2013
  • * Elton Smith - ''eltonssmith''
    935 B (118 words) - 09:34, 28 February 2013
  • * Matt and Elton will iterate on FCAL schedule
    1 KB (194 words) - 12:25, 15 March 2013
  • ''Attending:Elton, Tim, Shaun, Yi, David, Beni (Jlab); Andrei (UofR); Hayk, Alam, Orlando, El ...e is a question about how to complete the shipment of 370 units next week. Elton suggested one possibility would be to include the non-conforming MPPCs and
    5 KB (808 words) - 15:13, 19 March 2013
  • * Elton Smith - ''eltonssmith''
    1 KB (148 words) - 23:25, 6 March 2013
  • ''Attendees:Elton, Tim, Yi, David, Beni (JLab); Kei, Matt (IU); Zisis, Andrei (UofR); Will, H #* Zisis: Plan a photo shoot for the final block. (Elton will ask Greg Adams to take photo).
    5 KB (849 words) - 16:29, 26 March 2013
  • * Elton Smith - ''eltonssmith''
    1 KB (131 words) - 20:47, 13 March 2013
  • * Elton Smith (Hall D Staff)
    4 KB (506 words) - 15:49, 21 March 2013
  • ...y how the non-conforming SiPMs will be returned to Hamamatsu and replaced (Elton and Hayk) </strike> Non-conforming SiPMs will be shipped to JLab in the 370 ''Attending: Will, Serguei (USM); Shaun, Zisis, Andrei (UofR); Elton, Beni, David (JLab)
    4 KB (628 words) - 17:13, 24 February 2017
  • * Requirements for BCAL/FCAL LED pulser calibration system - Elton Present: Elliott W, Elton S, Dan B, Fernando B, John L, Yi Q, Scot S, Mark S, Dave B, Tara B, Alex S,
    5 KB (798 words) - 11:12, 31 March 2015
  • ...James M., Michael D., Dan S., Nathan S., Alex S., Curtis M., Franz K., and Elton S.
    1 KB (146 words) - 17:06, 24 February 2017
  • ''Attendees: Elton, Beni, David, Yi (JLab); Matt, Kei (IU); Christine (Athens); Will, Elias, A ##* Elton commented on the Figure that shows the overlap of trigger scintillators and
    5 KB (767 words) - 15:51, 9 April 2013
  • ...y how the non-conforming SiPMs will be returned to Hamamatsu and replaced (Elton and Hayk) </strike> Non-conforming SiPMs will be shipped to JLab in the 370
    1 KB (181 words) - 16:30, 2 April 2013
  • Present: Mark S., Jonathan, Elton, Orlando, Scot, Dave B., Eugene, Hovanes ...rom Chile is visiting us for 6 months. He will be working with Hovanes and Elton on BCAL slow controls.
    3 KB (414 words) - 10:05, 27 January 2014
  • * Elton Smith - ''eltonssmith''
    1 KB (148 words) - 09:26, 4 April 2013
  • ....jlab.org/doc-private/DocDB/ShowDocument?docid=2189 GHP Meeting, Denver] (Elton)
    2 KB (245 words) - 16:50, 24 February 2017
  • ''Attendees: Elton, Beni (JLab); Shaun (UofR); Will, Alam, Alison, Elias (USM); Athens tried t #* Elton past on the request to procurement to make a no-cost extension to the contr
    3 KB (462 words) - 17:50, 23 April 2013
  • * Elton Smith - ''eltonssmith''
    1 KB (164 words) - 13:24, 11 April 2013
  • #* <strike> Return 84 non-conforming light guides (Elton) </strike> Boxes are prepared and ready for shipment ''Attendees: Elton, Beni, David, Yi (JLab), Matt (IU), Christina, George Vasileiadis (Athens),
    5 KB (782 words) - 07:29, 8 May 2013
  • * Elton Smith - ''eltonssmith'' # [[Media:Plot piprob.pdf|Pi prob.]] (Elton)
    1 KB (148 words) - 09:05, 18 April 2013
  • # <strike> Start a series of illumination tests to test the new procedures (Elton) </strike> ''Attending: Yi, Chris, Keith, Tina, Jim, Nic, Fernando, Elton.
    3 KB (546 words) - 18:07, 25 April 2013
  • * Elton Smith - ''eltonssmith'' # [[Media:Fcal lambdaI.pdf|LGD interaction length]] (Elton)
    1 KB (143 words) - 13:40, 23 April 2013
  • # Check on status of returning "borrowed" SiPM (Elton) ''Attending: Chris, Tina, Elton, Jim, Nic
    3 KB (517 words) - 12:41, 3 May 2013
  • * Elton Smith - ''eltonssmith'' # [[Media:Beam rates cpp.pdf |Beam rates]] (Elton)
    1 KB (144 words) - 08:01, 25 April 2013
  • ''Attending: Elton, David, Beni (JLab); Christina, George Vasileiadis (Athens); Shaun, Zisis, ...the glue (previous experience resulted in a darkening of a glue he used). Elton: Will check.
    5 KB (830 words) - 17:48, 30 April 2013
  • # <strike> Check on status of non-conforming SiPMs (Elton) </strike> Hamamatsu has completed their evaluation. Confirm 2 bad. Have ag # <strike> Check on radiation hardness of glue (Elton) </strike> Based on a conversation with Carl Zorn we do not expect radiatio
    4 KB (647 words) - 13:14, 14 May 2013
  • | 7/22/2013 07:00-13:00 || Elton S. || Shaun K. ||
    564 B (63 words) - 11:19, 19 July 2013
  • ...the SiPMs are the same in the ESB test setup. David will speak more with Elton on this, and Regina will discuss it internally as well.
    4 KB (668 words) - 12:43, 31 March 2015
  • * Elton Smith - ''eltonssmith''
    1 KB (153 words) - 08:14, 2 May 2013
  • * Elton Smith - ''eltonssmith''
    1 KB (134 words) - 08:51, 3 May 2013
  • # Light guide testing (Elton)
    505 B (68 words) - 12:31, 3 May 2013
  • #* Return 84 non-conforming light guides (Elton) # Action Items: defer until Elton returns
    3 KB (434 words) - 18:32, 21 May 2013
  • * Elton Smith - ''eltonssmith'' # [[Media:Muon ms cpp.pdf]] (Elton)
    1 KB (140 words) - 09:49, 9 May 2013
  • #* They will compare notes and, with Elton, come to a consensus of which light guides are to be classified as "detache ...Any changes of procedures will have to be approved by Elton, or by Tim if Elton is not available.
    2 KB (355 words) - 12:07, 10 May 2013
  • * Elton Smith - ''eltonssmith''
    2 KB (227 words) - 09:14, 16 May 2013
  • #* Return 84 non-conforming light guides (Elton)
    1 KB (150 words) - 12:54, 21 May 2013
  • * Elton Smith - ''eltonssmith''
    1 KB (168 words) - 11:47, 23 May 2013
  • # Progress in MOUs, contracts and procurement (Elton/Curtis)
    778 B (105 words) - 09:44, 28 May 2013
  • * Elton Smith - ''eltonssmith''
    1 KB (161 words) - 09:06, 30 May 2013
  • * Elton Smith (Hall D Staff)
    3 KB (398 words) - 12:00, 11 June 2013
  • * Elton Smith - ''eltonssmith''
    1 KB (182 words) - 07:44, 13 June 2013
  • # Action Items: Chile responded offline to Elton's request on an update regarding the light guide re-machining. # Monitoring: Stratos responded offline to Elton's question regarding the FCAL plexiglas sheet specs. G. Vassileiadis will m
    4 KB (559 words) - 17:06, 24 February 2017
  • ''Attendees: Elton, George, John (JLab); Christina, Pavlos (Athens); Shawn, Andrei (UofR); Wil ##* Christina: Payment not yet received. Elton will check up on it. [Note added: Christina sent a note on Wed saying the p
    4 KB (607 words) - 17:13, 24 February 2017
  • ...Alex B. Nathan S., Justin S., Elton S., Richard J., Michael D., Franz K., Elton S., Sascha S, Tim W. and Eugene C.
    1 KB (183 words) - 13:52, 6 June 2016
  • Present: CMU (Curtis), JLab (Mark, Tim, Eugene, Elton, John, Hovannes, Yi, Elliott, Lubomir), UConn (James), IU (Matt) BCAL (Elton): Ten modules remain to have light guide installation. Main focus is doin
    4 KB (673 words) - 21:54, 31 March 2015
  • ..., Pavlos (Athens); Shawn, Andrei (UofR); Will, Alam, Elias (USM); Serguei, Elton, Beni, Yi, David (JLab). ...k, it appears we have sufficient electronics to instrument all 49 modules. Elton has asked Chris to order 100 LEDs so that broken boards can be fixed.
    4 KB (668 words) - 15:13, 25 June 2013
  • # <strike> Send a letter of invitation to Alam (Elton) </strike> Sue Ewing Fedexed the letter on Friday and it arrived at the uni ''Attending: Shaun, Zach, George, Elton, Andrei, Beni (JLab); Christina (Athens); Alam, Elias, Alison, Will (USM)
    4 KB (599 words) - 12:31, 9 July 2013
  • # <strike> Check on status of Alam's invitation letter (Elton). </strike> ''Attendees: George, Elton, Dave (JLab); Matt (IU); Christina (Athens); Serguei, Will (USM).
    4 KB (549 words) - 15:11, 16 July 2013
  • ''Attendees: Elton, mark, Will, Zhenyu Zhang (Jane), Simon, Justin (Jlab); Matt (IU); Zisis, A #* Elton: Systematic mass shifts in calibration (using inclusive data) could be caus
    7 KB (1,084 words) - 12:39, 14 March 2017
  • # <strike> Monitoring Bcal boards: Elton will check that we have sufficient stock. </strike> ''Attending: Zisis, Laura, Teagan, Andrei (UofR); George, Elton, Yi, Serguei, David, Beni (Jlab); Will (USM); Christina (Athens).
    4 KB (567 words) - 17:13, 24 February 2017
  • * Elton Smith - ''eltonssmith'' Attendees: ''David L., Elton S., Ali, Sasha M., Rory M.''
    2 KB (227 words) - 11:26, 12 July 2013
  • Attending: Sean (NU); Will, Curtis, Naomi, Mike S. (CMU); Paul, Simon, Elton, Luke, Mark I., Nathan, Dominick, Brad, Adesh, Alex B., Mahmoud, Beni (JLab ...of RCDB queries (e.g. certain trigger settings, solenoid current, etc.). Elton suggested that a minimum number of events cut and additional flag to exclud
    9 KB (1,361 words) - 17:11, 24 February 2017
  • Present: Curtis, Naomi, Simon, David, Elton, Lubomir, Cody
    3 KB (573 words) - 11:27, 21 July 2013
  • ...the UConn MOU for diamond radiator. It is in the hands of Jefferson Lab. Elton will check on it.
    6 KB (901 words) - 17:04, 24 February 2017
  • ...ke> Transmission: Report back on more transmission measurements (Shaun and Elton) </strike> # <strike> FCAL cover during solenoid tests (Elton and John) </strike>
    6 KB (852 words) - 17:07, 24 February 2017
  • # Elton to send a request to the computing center to load Java version 7 update 25
    3 KB (413 words) - 21:12, 6 August 2013
  • # <strike> FCAL plexiglass pane drawings upload (Elton) </strike> [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid ''Attendees: Alam, Elton, Beni (JLab); Will, Hayk, Serguei (USM); Shaun (UofR); Matt (IU); George (A
    3 KB (487 words) - 16:51, 24 February 2017
  • ''Attendees: Elton, Mark, Simon, Adesh, Curtis, Will, Jon, Andrei (JLab); Sean (NW); Ahmed (Re ###* Elton: Is the new computer up and running? Not yet, they need to transfer the own
    8 KB (1,246 words) - 13:57, 7 April 2016
  • * Elton Smith - ''eltonssmith'' ...e for a while this morning at 9:00am but nobody connected for the meeting. Elton had a doctor's appointment so he couldn't make it either. Did I get the tim
    2 KB (379 words) - 15:05, 19 August 2013
  • * Elton Smith - ''eltonssmith'' Attendees: ''David L., Elton S., Rory M.''
    2 KB (343 words) - 15:45, 19 August 2013
  • * Calorimetry: Elton
    2 KB (205 words) - 12:04, 2 February 2016
  • ''Attendees: Ilya Larin, Beni, Elton, David, Yi, Dan B., Alam (JLab); Shaun, Zisis (UofR); George V. (Athens); M #* Elton: UVT acrylic sheets arrived from Eljen and are stored in the ESB. They requ
    5 KB (795 words) - 12:38, 14 March 2017
  • * Elton Smith - ''eltonssmith''
    961 B (123 words) - 08:19, 5 September 2013
  • ''Attendees: Elton, Beni (JLab); Shaun, Giovanni Alcocer (new graduate student), Zisis, Andrei ##* Elton: Expectations are based on beam test data, so they probably effectively inc
    5 KB (710 words) - 17:13, 24 February 2017
  • - As indicated by Elton, after the BCAL was inserted in the magnet, it might be down w.r.t. the mag
    3 KB (577 words) - 18:24, 12 September 2013
  • * 15:20 Session II: Experiment --- Chair: Elton Smith ...B/ShowDocument?docid=2301 Working group on the target and photon source]: Elton Smith
    3 KB (433 words) - 17:13, 24 February 2017
  • # Progress in MOUs, contracts and procurement (Elton/Curtis)
    695 B (90 words) - 17:44, 3 October 2013
  • ...subsystems are ready, some have not been decided yet. Beni proposed to ask Elton to explain their plans on the next FDC meeting so that we can synchronize o
    4 KB (676 words) - 18:04, 19 September 2013
  • ''Attendees: Will L., Curtis (CMU), David, Elton, Beni (JLab), George Vas. (Athens), Andrei, Giovanni, Zisis (Regina)''
    2 KB (241 words) - 13:47, 15 October 2013
  • * Elton Smith (Hall D Staff)
    4 KB (502 words) - 10:53, 30 September 2013
  • ''Attendees: Elton, David, Alam, Beni, John, Dan, Yi (JLab); Sean (NW); Matt (IU); Zisis, Shau ##* Sean: Should we use the gain as an indicator of dead channels? Elton: Should have an additional quality factor for each channel
    4 KB (669 words) - 16:57, 22 October 2013
  • ''Attendees: Elton, Dave, Beni, Yi, Alam (JLab); Will (CMU); Sean (NW); Matt (IU); Zisis, Andr #* Elton: Notes that Orlando Soto (from USM) is being invited to JLab, has his visa,
    5 KB (780 words) - 17:12, 24 February 2017
  • # [https://logbooks.jlab.org/entry/3360082 Fcal response to charged tracks] (Elton)
    2 KB (234 words) - 16:15, 30 November 2015
  • ''Attendees: David, Elton, Yi, Beni (JLab), Andrei, Giovanni, Zisis (Regina)''
    4 KB (672 words) - 13:12, 31 March 2015
  • * Elton Smith - ''eltonssmith'' Attendees: Rory M., David L., Elton S.
    2 KB (327 words) - 09:33, 17 October 2013
  • ''Attendees: Elton, Mark (Jlab), Curtis, Will, Mike (CMU), George (Athens), Ahmed, Noemi, Zis ## Elton's email: ongoing conversation; solicit input by email. This could pipe info
    6 KB (914 words) - 13:01, 7 January 2016
  • * Elton Smith - ''eltonssmith'' Attendees: Rory M., David L., Elton S.
    2 KB (289 words) - 10:57, 31 October 2013
  • ## π<sup>0</sup> calibration. (Elton S.) **[https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2900 Bcal] (Elton)
    22 KB (3,414 words) - 16:27, 26 November 2018
  • * Present: Richard J., Alex S., Michael D., Nathan S., Franz K., Eugene C., Elton S., Curtis M, and James M.
    964 B (137 words) - 12:50, 4 January 2016
  • ...ike> Investigate room for mounting an external counter above the solenoid (Elton). </strike> ''Attendees: Zisis, Andrei, Shaun, Giovanni (UofR); Sean (NW); Elton, Beni, Alam, David, Yi (JLab); Matt (IU); Will (USM); Will (CMU)
    5 KB (734 words) - 18:44, 20 November 2013
  • # [[Beam Commissioning Plan]] Reviews Sequence (Elton) Elton: Presented the various steps and safety reviews needed to commission the b
    5 KB (818 words) - 06:26, 1 April 2015
  • Present: Richard Jones, James McIntyre [UConn] and Elton S., Alex D., Hovannes E., Mike M., Eugene C.[Jlab] <br> # Elton is away July 17-18 and July 30-Aug 6.
    3 KB (435 words) - 14:19, 23 June 2014
  • ...construction. Zisis proposed that the Regina students (helped by Mark and Elton) will gradually populate thd ccdb with conditions and calibration parameter ...ect the 3.75 deg rotation, implement changes and rerun. We will convey to Elton the need to run cosmics data nightly and on weekends, as we will need adequ
    5 KB (812 words) - 12:54, 27 June 2014
  • ...lex S., Natalie W., Yi Q., Nathan S., Jarrod F., Todd S., Ivan T., Tim W., Elton S. # [[Beam Commissioning Plan]] - ''Elton''
    5 KB (818 words) - 16:54, 24 February 2017
  • ''Attendees: Elton, David, Yi, Beni, Mark (JLab), Will (CMU), Andrei, Zisis (Regina)'' ...e (e.g. as a result of Andrei's curvature (E,theta) table and philosophy)? Elton suggested that we first assemble the complete picture of the number of cons
    4 KB (629 words) - 11:42, 11 December 2013
  • # Barrel Calorimeter (BCAL) - Elton Smith # Forward Calorimeter (FCAL) - Elton Smith
    687 B (98 words) - 10:20, 14 November 2013
  • * Elton Smith - ''eltonssmith'' Attendees: ''Rory M., Sean M., Ali, Megan, Elton S., Mark I., David L.''
    3 KB (424 words) - 15:41, 14 November 2013
  • Present: Elliott W, Simon T, Yi Q, Serguei P, Bryan M, Mark D, Elton S, William G, Beni Z, Alex S, Sean D, Hovanes E, Curtis M, Mark I, Dave L,
    6 KB (988 words) - 01:13, 1 April 2015
  • ...sit raw data format for Flash-250 MHz following Flash-125 MHz discussion. (Elton to send out info before next meeting) </strike> Links added to meeting agen ''Attendees: Yi, Alam, Elton, John, David (JLab); Zisis, Shawn, Andrei (UofR)
    5 KB (716 words) - 17:12, 24 February 2017
  • ...rs for cosmics running - [http://gluex.phys.uregina.ca/photos photos] from Elton ...re was some discussion of adding scintillator paddles for cosmics running. Elton's photos showed enough room for paddles both below the magnet and between t
    3 KB (447 words) - 14:25, 31 March 2015
  • Participants: Bill, Dave, Nick, Chris, Simon, Vlad, Beni, Elton, Hovanes (for the LV control discussions) and Lubomir.
    4 KB (763 words) - 00:48, 1 April 2015
  • # [[Beam Commissioning Plan]] Reviews Sequence (Elton)
    2 KB (222 words) - 14:52, 31 March 2015
  • ''Attendees: Elton, Mark (Jlab), Curtis, Will, Mike (CMU), George (Athens), Ahmed, Noemi, Zis ## Elton's email: ongoing conversation; solicit input by email. This could pipe info
    6 KB (914 words) - 18:16, 7 January 2016
  • ...resent at the meeting were: Elliott W, Bryan M, Curtis M, Dave L, Mark I, Elton S, Graham H, Sean D, Justin S, Eugene C, Yi Q, Simon T, Hovanes E, Serguei
    9 KB (1,461 words) - 17:13, 24 February 2017
  • ...Brendan P., Richard J., James M., Hovanes E., Nathan S., Tim W., Todd S., Elton S., Dave M., Bill C., Ivan T., Natalie W., Franz K., Yi Q., Alex S., Mike D
    1 KB (170 words) - 17:06, 24 February 2017
  • ...ave started work on the BCAL. Zisis will recheck all numbers and reply to Elton by early January. John is presumably doing the same for the FCAL.
    4 KB (595 words) - 11:53, 8 January 2014
  • Present: Elliott W, Bryan M, Curtis M, Dave L, Mark I, Graham H, Elton S, Sean D, Justin S, Yi Q, Eugene C, Simon T, Hovanes E, Serguei P, Mark D,
    7 KB (1,064 words) - 06:33, 1 April 2015
  • # [[Beam Commissioning Plan]] Reviews Sequence (Elton) Elton: next week will attend the Hall A beam commissioning review to understand
    4 KB (683 words) - 11:35, 31 March 2015
  • * Elton Smith - ''eltonssmith''
    1 KB (157 words) - 15:11, 5 December 2013
  • #* Green button (Elton)
    1 KB (150 words) - 16:46, 29 March 2016
  • # [[Beam Commissioning Plan]] Reviews Sequence (Elton)
    2 KB (225 words) - 02:55, 1 April 2015
  • * Elton Smith - ''eltonssmith'' Attendees: ''David L., Elton S., Rory M., Sean M., Ali R.''
    2 KB (208 words) - 12:40, 7 January 2014
  • ...lab.org/doc-private/DocDB/ShowDocument?docid=2464 Commissioning Plans] --- Elton Smith .../DisplayMeeting?sessionid=484 Tracking] - (Organizer: Beni Zihlman) Chair: Elton Smith
    10 KB (1,231 words) - 12:38, 14 March 2017
  • Attendees: ''David L., Elton S., Cody D., Fernando B., Ed J., Chris C., Curtis M., Naomi J., Beni Z., Ha
    3 KB (450 words) - 17:12, 24 February 2017
  • ...ge Voulgaris, George Vassileiadis, Pavlos (Athens), Sean (NWU), David, Yi, Elton, Eugene, Mark D., John (JLab), Andrei, Zisis (Regina)'' ...It will be a controlled document that needs to be signed off by Eugene or Elton. Input for the FCAl is needed from John/Matt.
    5 KB (738 words) - 17:12, 24 February 2017
  • .../mailman.jlab.org/pipermail/halld-cal/2014-January/000857.html see e-mail] Elton) ''Attendees: Fernando, Yi, David, Elton, Mark, Sasha, Eugene, Beni, Orlando (JLab); Shawn, Zisis, Andrei (UofR); Ch
    6 KB (943 words) - 13:34, 30 January 2014
  • David noted that Elton mentioned a conversation he had with Fernando which did not seem consistent
    2 KB (289 words) - 17:04, 24 February 2017
  • # Updates: not much progress has occurred on the calibration effort. Elton has submitted comments on the BCAL document (GlueX-doc-2379) and Sean has r ## Hovannes needs input on the BCAL interlock conditions. Elton has made a draft of these and further input is sought.
    3 KB (396 words) - 20:12, 7 February 2014
  • #* BCAL - Questions from Elton
    805 B (102 words) - 12:07, 30 January 2014
  • * Elton Smith - ''eltonssmith''
    1 KB (170 words) - 07:48, 28 January 2014
  • ''Attendees: Elton, John, Mark (JLab); George, Pavlos, Stratos (Athens); Shaun, Andrei (UofR);
    4 KB (631 words) - 10:05, 17 February 2014
  • ...Alex B., Ann Marie C., Brendan P., Nathan S., Tim W., Alex D., Eugene C., Elton S., Jarrod , Alex S., Curtis M., Dan S., Franz K., and Mike D.
    1 KB (180 words) - 16:53, 24 February 2017
  • Attending: Sean (NU); Simon, Beni, Kei, Nathan, Mark I., Will M., Sasha S., Elton, Will L., David L., Sergey F., Mike S. (JLab); Matt S. (IU); Curtis, Paul,
    9 KB (1,425 words) - 17:12, 24 February 2017
  • ...ment?docid=2379|Calibration document], [[Calibration_20140212_BCALComments|Elton's Comments]] #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1702 Elton's study on pi0 and eta statistics]
    4 KB (655 words) - 16:54, 24 February 2017
  • From: Elton Smith <elton@jlab.org> Thanks, Elton.
    4 KB (618 words) - 15:04, 11 February 2014

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)