Pages with the most revisions

From GlueXWiki
Jump to: navigation, search

Showing below up to 500 results in range #1 to #500.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. Analysis TTreeFormat‏‎ (673 revisions)
  2. FDC Meetings‏‎ (595 revisions)
  3. SiPM Radiation Hardness Test‏‎ (563 revisions)
  4. Calorimetry Meetings‏‎ (475 revisions)
  5. Conferences‏‎ (447 revisions)
  6. Tagged Beam Group Biweekly Meetings - Bluejeans (retired)‏‎ (445 revisions)
  7. Π polarizability Meetings‏‎ (434 revisions)
  8. GlueX Offline Software‏‎ (409 revisions)
  9. RunPeriod-2019-11 Validation‏‎ (407 revisions)
  10. GlueX Offline Software Meetings‏‎ (401 revisions)
  11. Run Planning Meeting Notes, March 8 - March 15, 2023‏‎ (388 revisions)
  12. Main Page‏‎ (370 revisions)
  13. Hall-D Weekly Meeting‏‎ (362 revisions)
  14. Mattione GlueX Analysis Factories‏‎ (357 revisions)
  15. Meetings‏‎ (339 revisions)
  16. Hall D MEDCON5 Operations Resumption Status‏‎ (333 revisions)
  17. GlueX Talks‏‎ (329 revisions)
  18. Physics Working Group Meetings‏‎ (325 revisions)
  19. GlueX Time-of-Flight Bi-Weekly Meetings‏‎ (297 revisions)
  20. JEF Meetings‏‎ (293 revisions)
  21. Construction of Low-Granularity counters‏‎ (289 revisions)
  22. Data Monitoring Procedures‏‎ (261 revisions)
  23. Analysis Studies‏‎ (244 revisions)
  24. GlueX Upgrade PID Meetings‏‎ (236 revisions)
  25. Solenoid Coil Test in Test Lab‏‎ (229 revisions)
  26. JLAB Engineering Design and Fab meeting‏‎ (219 revisions)
  27. Start Counter Meetings‏‎ (217 revisions)
  28. GlueX Analysis Workfest 2018‏‎ (215 revisions)
  29. BCAL‏‎ (203 revisions)
  30. GlueX Analysis Workshop 2013‏‎ (202 revisions)
  31. Mattione GlueX Kinematic Fitting‏‎ (200 revisions)
  32. CDC‏‎ (199 revisions)
  33. Trigger/DAQ/Monitoring/Controls Meetings‏‎ (197 revisions)
  34. RF Calibration‏‎ (193 revisions)
  35. Run Planning Meeting Notes, September 30 - October 6, 2021‏‎ (193 revisions)
  36. Calibration Dashboard‏‎ (191 revisions)
  37. Tracking Meetings‏‎ (186 revisions)
  38. GlueX Offline FAQ‏‎ (181 revisions)
  39. Electronics‏‎ (181 revisions)
  40. Fast Monitoring System - PXI‏‎ (181 revisions)
  41. GlueX Physics Workshop 2016‏‎ (180 revisions)
  42. Controls Meetings‏‎ (179 revisions)
  43. Tagger and Beamline Review‏‎ (179 revisions)
  44. SRC/CT Run Plan‏‎ (178 revisions)
  45. Run Planning Meeting Notes, July 14 - July 20, 2022‏‎ (172 revisions)
  46. GlueX-Collaboration-May-2011‏‎ (170 revisions)
  47. GlueX-Collaboration-Sept-2008‏‎ (170 revisions)
  48. GlueX-Collaboration-Meetings‏‎ (169 revisions)
  49. Offline Software‏‎ (166 revisions)
  50. Trigger/DAQ/Monitoring/Controls‏‎ (163 revisions)
  51. GlueX-Collaboration-May-2010‏‎ (160 revisions)
  52. Naomi‏‎ (157 revisions)
  53. RunPeriod-2021-09 Validation‏‎ (155 revisions)
  54. SRC/CT Physics Analysis‏‎ (154 revisions)
  55. GlueX-Collaboration-May-2019‏‎ (153 revisions)
  56. BCAL Readout‏‎ (152 revisions)
  57. GlueX-Collaboration-Oct-2013‏‎ (151 revisions)
  58. GlueX-Collaboration-May-2020‏‎ (149 revisions)
  59. Photon Beam‏‎ (147 revisions)
  60. Run Coordination Meetings:Fall2017 Spring2018 Run‏‎ (146 revisions)
  61. GlueX-Collaboration-Feb-2012‏‎ (142 revisions)
  62. Analysis Actions‏‎ (141 revisions)
  63. GlueX-Collaboration-Sep-2010‏‎ (140 revisions)
  64. Run Planning Meeting Notes, June 30 - July 06, 2022‏‎ (140 revisions)
  65. Run Coordination Meetings: Spring 2016 Run‏‎ (139 revisions)
  66. GlueX-Collaboration-June-2018‏‎ (139 revisions)
  67. Run Planning Meeting Notes, July 21- July 27, 2022‏‎ (138 revisions)
  68. Run Coordination Meetings:Fall2019 Run‏‎ (138 revisions)
  69. Run Coordination Meetings: Fall 2014‏‎ (135 revisions)
  70. Run Planning Meeting Notes, February 9 - February 15, 2023‏‎ (133 revisions)
  71. Deprecated: Action Items From Hall D Offline Meetings‏‎ (133 revisions)
  72. Instrumentation Publications‏‎ (133 revisions)
  73. Run Planning Meeting Notes, October 7 - October 13, 2021‏‎ (131 revisions)
  74. SiPM Database‏‎ (130 revisions)
  75. Testing ECAL modules‏‎ (130 revisions)
  76. Guide to Using Git‏‎ (129 revisions)
  77. Run Coordination Meetings:Spring2023‏‎ (128 revisions)
  78. GlueX-Collaboration-Oct-2016‏‎ (128 revisions)
  79. Double Regge Exchange Meeting‏‎ (128 revisions)
  80. GlueX-Collaboration-Oct-2015‏‎ (127 revisions)
  81. GlueX-Collaboration-Feb-2019‏‎ (127 revisions)
  82. GlueX-Collaboration-Feb-2014‏‎ (126 revisions)
  83. Using the Grid‏‎ (126 revisions)
  84. Software‏‎ (126 revisions)
  85. FA125 firmware check‏‎ (125 revisions)
  86. GlueX-Collaboration-Sep-2018‏‎ (124 revisions)
  87. CPP and NPP Readiness Review‏‎ (123 revisions)
  88. GlueX-Collaboration-Feb-2017‏‎ (123 revisions)
  89. GlueX-Collaboration-Jan-2011‏‎ (123 revisions)
  90. Run Planning Meeting Notes, February 16 - February 22, 2023‏‎ (122 revisions)
  91. Run Planning Meeting Notes, Novemver 17 - Novemver 23, 2022‏‎ (121 revisions)
  92. GlueX Analysis Software‏‎ (121 revisions)
  93. GlueX-Collaboration-Feb-2015‏‎ (119 revisions)
  94. Weekly Analysis Meetings‏‎ (119 revisions)
  95. CDC algo‏‎ (119 revisions)
  96. Electronics Trigger Meetings‏‎ (118 revisions)
  97. GlueX-Collaboration-May-2014‏‎ (117 revisions)
  98. CPP and NPP Run Conditions‏‎ (117 revisions)
  99. Offline Monitoring Data Validation PrimEx‏‎ (116 revisions)
  100. Run Coordination Meetings:Summer2021‏‎ (116 revisions)
  101. Level-1 Trigger‏‎ (116 revisions)
  102. RunPeriod-2019-01 Validation‏‎ (116 revisions)
  103. 2022 Data Production‏‎ (115 revisions)
  104. Run Planning Meeting Notes, June 23 - June 29, 2022‏‎ (115 revisions)
  105. GlueX Tutorial 2022‏‎ (115 revisions)
  106. Offline Software News Archive‏‎ (115 revisions)
  107. GlueX-Collaboration-Feb-2013‏‎ (114 revisions)
  108. Offline Monitoring Data Validation‏‎ (113 revisions)
  109. Eta Decay Width Measurements via Primakoff Effect‏‎ (113 revisions)
  110. Nov 3-5, 2009 Calorimetry‏‎ (113 revisions)
  111. CDC recent run drift times‏‎ (113 revisions)
  112. GlueX-Collaboration-Oct-2012‏‎ (112 revisions)
  113. Run Coordination Meetings:Summer2020‏‎ (112 revisions)
  114. Mattione Update 09042013‏‎ (112 revisions)
  115. Run Coordination Meetings: Spring run‏‎ (112 revisions)
  116. Fiber Test Stand at JLAB‏‎ (111 revisions)
  117. Mattione Update 04212014‏‎ (111 revisions)
  118. GlueX-Collaboration-Feb-2020‏‎ (111 revisions)
  119. GlueX-Collaboration-Jun-2013‏‎ (110 revisions)
  120. Analysis DReaction‏‎ (109 revisions)
  121. Private:Trigger Types‏‎ (109 revisions)
  122. Run Planning Meeting Notes, Mar 29-Apr 4, 2018‏‎ (108 revisions)
  123. Studies of the Newport XPS controller by Vanik‏‎ (108 revisions)
  124. LE algo‏‎ (107 revisions)
  125. GlueX-Collaboration-Jun-2012‏‎ (107 revisions)
  126. GlueX-Collaboration-May-2021‏‎ (107 revisions)
  127. GlueX-Collaboration-Sep-2009‏‎ (107 revisions)
  128. GlueX-Collaboration-Oct-2014‏‎ (106 revisions)
  129. Summer 2013 Manpower Contributions‏‎ (106 revisions)
  130. GlueX-Collaboration-Sep-2011‏‎ (104 revisions)
  131. RunPeriod-2018-01 Validation‏‎ (104 revisions)
  132. Offline HOWTO List‏‎ (104 revisions)
  133. Run Planning Meeting Notes, Mar 1-Mar 7, 2018‏‎ (103 revisions)
  134. Experiment Readiness Review 2020‏‎ (103 revisions)
  135. GlueX-Collaboration-May-2017‏‎ (103 revisions)
  136. GlueX Physics Quark Model‏‎ (103 revisions)
  137. GlueX-Collaboration-Oct-2019‏‎ (103 revisions)
  138. Online Major Milestones‏‎ (102 revisions)
  139. Run Planning Meeting Noters, November 9- November 16, 2022‏‎ (102 revisions)
  140. PMT & Divider‏‎ (102 revisions)
  141. RunPeriod-2022-05 Validation‏‎ (101 revisions)
  142. Run Coordination Meetings:Spring2019 Run‏‎ (101 revisions)
  143. Run Planning Meeting Notes, September 17 - 21, 2020‏‎ (101 revisions)
  144. Online task list for 2011‏‎ (101 revisions)
  145. Run Coordination Meetings:Summer2022‏‎ (101 revisions)
  146. Noise studies‏‎ (100 revisions)
  147. Run Planning Meeting Notes, November 24 - November 30, 2022‏‎ (100 revisions)
  148. Run Coordination Meetings: Fall 2016 Run‏‎ (99 revisions)
  149. Oct 15, 2008 Calorimetry‏‎ (99 revisions)
  150. GlueX-Collaboration-Oct-2017‏‎ (99 revisions)
  151. Run Planning Meeting Notes, January 26 - February 1, 2023‏‎ (99 revisions)
  152. GlueX-Collaboration-May-2009‏‎ (99 revisions)
  153. Real Gamma GDH Experiment (REGGE)‏‎ (98 revisions)
  154. GlueX-Collaboration-Feb-2022‏‎ (98 revisions)
  155. GlueX-Collaboration-May-2024‏‎ (97 revisions)
  156. Run Planning Meeting Notes, Feb 12-Feb 28, 2018‏‎ (97 revisions)
  157. GlueX-Collaboration-May-2016‏‎ (97 revisions)
  158. SRC@GlueX‏‎ (97 revisions)
  159. Run Planning Meeting Notes, August 27-September 2, 2020‏‎ (97 revisions)
  160. Run Planning Meeting Notes, September 22 - September 28, 2022‏‎ (96 revisions)
  161. PrimEx (informal) Calibration & Analysis Meeting‏‎ (95 revisions)
  162. BCAL Beam Tests 2012‏‎ (95 revisions)
  163. Run Table‏‎ (95 revisions)
  164. Spring 2019 DIRC Commissioning‏‎ (95 revisions)
  165. BCAL Reconstruction‏‎ (94 revisions)
  166. SiPM electrical and cooling‏‎ (93 revisions)
  167. GlueX-Collaboration-May-2015‏‎ (93 revisions)
  168. GlueX-Collaboration-Feb-2016‏‎ (93 revisions)
  169. Primer for shift takers DRAFT‏‎ (93 revisions)
  170. Run Planning Meeting Notes, September 3 - 9, 2020‏‎ (93 revisions)
  171. Follow up on the Hodoscope Fabrication Readiness Review‏‎ (91 revisions)
  172. SRC FCAL time/energy calibrations‏‎ (91 revisions)
  173. Theses‏‎ (90 revisions)
  174. GlueX-Collaboration-Jan-2010‏‎ (90 revisions)
  175. Run Planning Meeting Notes, Dec 5-Dec 11, 2019‏‎ (89 revisions)
  176. May 2008 Subsystem Review‏‎ (89 revisions)
  177. Run Planning Meeting Notes, August 25 - August 31, 2022‏‎ (89 revisions)
  178. Run Planning Meeting Notes, Nov 1-Nov 8, 2018‏‎ (88 revisions)
  179. Calibration Challenge‏‎ (88 revisions)
  180. Online Design Goals‏‎ (88 revisions)
  181. Solenoid Coil Test Weekly meetings‏‎ (87 revisions)
  182. Analysis shift‏‎ (87 revisions)
  183. Offline Monitoring Data Validation CPP‏‎ (87 revisions)
  184. 2012 Software Review‏‎ (87 revisions)
  185. GlueX-Collaboration-Jan-2009‏‎ (87 revisions)
  186. PAC Proposals‏‎ (87 revisions)
  187. GlueX-Collaboration-Oct-2020‏‎ (87 revisions)
  188. GlueX-Collaboration-May-2023‏‎ (87 revisions)
  189. Beam Commissioning Plan‏‎ (86 revisions)
  190. SRC/CT Good Run Selection‏‎ (85 revisions)
  191. GlueX Physics Photoproduction‏‎ (85 revisions)
  192. GlueX Physics‏‎ (84 revisions)
  193. GlueX-Collaboration-Feb-2018‏‎ (84 revisions)
  194. 2020 Data Production‏‎ (84 revisions)
  195. Run Planning Meeting Notes, September 23 - September 29, 2021‏‎ (84 revisions)
  196. CDC B field‏‎ (84 revisions)
  197. Run Planning Meeting Notes, Apr12-Apr 18, 2018‏‎ (84 revisions)
  198. Getting Started At GlueX‏‎ (84 revisions)
  199. Preparation for 2021 Run‏‎ (84 revisions)
  200. GlueX-Collaboration-Feb-2024‏‎ (83 revisions)
  201. Weekly Technical Meetings‏‎ (83 revisions)
  202. Beam Test Run Plan‏‎ (83 revisions)
  203. ReactionFilter‏‎ (82 revisions)
  204. Run Planning Meeting Notes, Feb 23- Mar 1, 2017‏‎ (81 revisions)
  205. Run Planning Meeting Notes, Jan 25-Jan 31, 2018‏‎ (81 revisions)
  206. Photon Tagger‏‎ (81 revisions)
  207. Repairs made to TAGH scintillator counters over the summer of 2019‏‎ (81 revisions)
  208. GlueX PID Bi-Weekly Meetings‏‎ (81 revisions)
  209. F425962‏‎ (80 revisions)
  210. RunPeriod-2023-01 Validation‏‎ (80 revisions)
  211. Run Wiki‏‎ (80 revisions)
  212. GlueX Tutorial 2018‏‎ (80 revisions)
  213. University of Connecticut Active Collimator Station Tutorial‏‎ (80 revisions)
  214. Final test of dividers‏‎ (79 revisions)
  215. SRC-CT Software‏‎ (79 revisions)
  216. Reviews‏‎ (78 revisions)
  217. GlueX-Collaboration-Sep-2023‏‎ (78 revisions)
  218. CDC 216 channels‏‎ (78 revisions)
  219. Analysis Working Group Meetings‏‎ (77 revisions)
  220. CDC 50 50‏‎ (77 revisions)
  221. HOWTO use hdgeant4 as a beam Monte Carlo generator‏‎ (77 revisions)
  222. Online Project List‏‎ (77 revisions)
  223. Posters‏‎ (76 revisions)
  224. Mattione Kaon PID Studies phi3(1850)‏‎ (76 revisions)
  225. FA125 firmware check 2.00D+‏‎ (76 revisions)
  226. HDGeant4 Meetings‏‎ (76 revisions)
  227. Run Planning Meeting Notes, March 1 - March 8, 2023‏‎ (76 revisions)
  228. GlueX-Collaboration-Feb-2021‏‎ (76 revisions)
  229. Run Planning Meeting Notes, February 23 - February 28, 2023‏‎ (76 revisions)
  230. HDDM Programmer's Interface‏‎ (76 revisions)
  231. Mattione Update 10312011‏‎ (76 revisions)
  232. RunPeriod-2016-02 Validation‏‎ (75 revisions)
  233. GlueX-Collaboration-Sep-2021‏‎ (75 revisions)
  234. Physics Publications‏‎ (74 revisions)
  235. HallD Online IP Name And Address Conventions‏‎ (74 revisions)
  236. Run Planning Meeting Notes, Oct 4-Oct 10, 2018‏‎ (74 revisions)
  237. Deprecated: JANA/DANA‏‎ (74 revisions)
  238. GlueX-Collaboration-Sep-2022‏‎ (73 revisions)
  239. Pair Spectrometer‏‎ (73 revisions)
  240. Run Coordination Meetings: Spring 2017 Run‏‎ (73 revisions)
  241. GlueX Physics Strong Decay Models‏‎ (73 revisions)
  242. Spring 2017 Analysis Launch Cuts‏‎ (72 revisions)
  243. Kinematic Fitting Workshop 2021‏‎ (72 revisions)
  244. Run Planning Meeting Notes, August 11- August 17, 2022‏‎ (72 revisions)
  245. RunPeriod-2022-08 Validation‏‎ (71 revisions)
  246. ASIC design optimizations‏‎ (71 revisions)
  247. GlueX-Collaboration-May-2022‏‎ (71 revisions)
  248. Run Planning Meeting Notes, February 2 - February 9, 2023‏‎ (70 revisions)
  249. Active Base Radiation Tests‏‎ (70 revisions)
  250. Run Planning Meeting Notes, Mar 12-Mar 18, 2020‏‎ (70 revisions)
  251. Tagged Beam Group Engineering Drawings‏‎ (70 revisions)
  252. 2011 Hall B FCAL Beam Test‏‎ (70 revisions)
  253. Test Setup for SiPMs‏‎ (69 revisions)
  254. Trigger Commissioning‏‎ (69 revisions)
  255. Run Planning Meeting Notes, Jan 30-Feb 05, 2020‏‎ (69 revisions)
  256. CRYTUR‏‎ (69 revisions)
  257. Run Planning Meeting Notes, Sep 28-Oct 3, 2018‏‎ (69 revisions)
  258. Sim-Recon Tagged Releases‏‎ (69 revisions)
  259. Private:UConn test setup‏‎ (68 revisions)
  260. Run Planning Meeting Notes, June 8 - June 15, 2022‏‎ (68 revisions)
  261. Run Planning Meeting Notes, July 07 - July 14, 2022‏‎ (68 revisions)
  262. Offline Monitoring Archived Data‏‎ (67 revisions)
  263. Getting started with GlueX Software‏‎ (67 revisions)
  264. Tagger Microscope‏‎ (67 revisions)
  265. RunPeriod-2017-01 Validation‏‎ (67 revisions)
  266. FCAL Insert‏‎ (67 revisions)
  267. GlueX-Collaboration-Feb-2023‏‎ (67 revisions)
  268. Run Planning Meeting Notes, October 21 - October 27, 2021‏‎ (67 revisions)
  269. 2017-01-recon v2-sims‏‎ (66 revisions)
  270. Specification for 12 GeV electron beam and associated instrumentation‏‎ (66 revisions)
  271. Light Guide Information‏‎ (66 revisions)
  272. DIRC‏‎ (65 revisions)
  273. Trigger and Readout Electronics‏‎ (65 revisions)
  274. CDC 60 40‏‎ (65 revisions)
  275. CDC q vs n‏‎ (65 revisions)
  276. Run Planning Meeting Notes, Feb 16-Feb 22, 2017‏‎ (65 revisions)
  277. GlueX phase 2, 2023-01 data set‏‎ (64 revisions)
  278. FA125 chip occupancy‏‎ (64 revisions)
  279. Calibration Train‏‎ (64 revisions)
  280. Time-of-Flight‏‎ (64 revisions)
  281. Run Planning Meeting Notes, November 30 - December 7, 2022‏‎ (63 revisions)
  282. GlueX Software Setup‏‎ (63 revisions)
  283. DSelector‏‎ (63 revisions)
  284. Specification for active photon collimator system‏‎ (63 revisions)
  285. Analysis Launch Plugin Requirements‏‎ (63 revisions)
  286. HOWTO install and run HDGeant4‏‎ (63 revisions)
  287. GlueX-Collaboration-May-2008‏‎ (63 revisions)
  288. MEDCON6 Shutdown Plan‏‎ (63 revisions)
  289. Automatic Builds of GlueX Software‏‎ (63 revisions)
  290. TS front panel connections‏‎ (63 revisions)
  291. Run Planning Meeting Notes, August 18 - August 23, 2022‏‎ (62 revisions)
  292. Mattione BCAL Segmentation‏‎ (62 revisions)
  293. DC and PID Review‏‎ (62 revisions)
  294. Calibration-Monitoring‏‎ (62 revisions)
  295. Mattione Study b1pi‏‎ (62 revisions)
  296. Fall 2015 Commissioning Plan‏‎ (62 revisions)
  297. Online builds 10-apr-2013‏‎ (61 revisions)
  298. Practice Talks‏‎ (60 revisions)
  299. Improved timing‏‎ (60 revisions)
  300. Mattione Particle Classes‏‎ (60 revisions)
  301. For the second coil‏‎ (60 revisions)
  302. Run Planning Meeting Notes, Feb 9-Feb 15, 2017‏‎ (60 revisions)
  303. Run Planning Meeting Notes, January 19 - January 25, 2023‏‎ (60 revisions)
  304. Run Planning Meeting Notes, August 13 -17, 2020‏‎ (60 revisions)
  305. GlueX-II and DIRC ERR‏‎ (60 revisions)
  306. Run Planning Meeting Notes, October 6 - October 12, 2022‏‎ (59 revisions)
  307. PMT tiles missing after restarting data taking‏‎ (59 revisions)
  308. Photon Beam Design Requirements‏‎ (59 revisions)
  309. Run Planning Meeting Notes, September 1 - September 7, 2022‏‎ (58 revisions)
  310. CPP FCAL time/energy calibrations‏‎ (58 revisions)
  311. Readiness Review: Testing of light sensors for Bcal‏‎ (58 revisions)
  312. 12 GeV Trigger/Online Workshop‏‎ (58 revisions)
  313. Hodoscope Fabrication Readiness Review‏‎ (57 revisions)
  314. RunPeriod-2021-08 Validation‏‎ (57 revisions)
  315. Run Planning Meeting Notes, Apr 11 - Apr 17, 2019‏‎ (57 revisions)
  316. BCAL Beam Tests‏‎ (57 revisions)
  317. GlueX-Collaboration-Jan-2008‏‎ (56 revisions)
  318. Run Planning Meeting Notes, August 3- August 10, 2022‏‎ (56 revisions)
  319. Detector Rates and Lifetime‏‎ (56 revisions)
  320. Collaboration Board‏‎ (56 revisions)
  321. Addressing ERR review recommendations‏‎ (56 revisions)
  322. Run Coordination Meetings:Fall2022‏‎ (55 revisions)
  323. CPP Test 2020 - Schedule‏‎ (55 revisions)
  324. Mattione Update 07092012‏‎ (55 revisions)
  325. Recoil proton reconstruction‏‎ (55 revisions)
  326. GlueX Tutorial 2019‏‎ (55 revisions)
  327. Publications‏‎ (55 revisions)
  328. Photon beam pipe‏‎ (55 revisions)
  329. Mattione Kaon PID Studies Y2175‏‎ (55 revisions)
  330. Short-Range Correlations and CT‏‎ (54 revisions)
  331. FCAL‏‎ (54 revisions)
  332. CDC straight straws‏‎ (54 revisions)
  333. Hall Network Specifications‏‎ (53 revisions)
  334. Run Planning Meeting Notes, September 16 - September 23, 2021‏‎ (53 revisions)
  335. SRC/CT Data Reconstruction‏‎ (53 revisions)
  336. OWG Meeting 13-Apr-2011‏‎ (53 revisions)
  337. HOWTO documentation‏‎ (53 revisions)
  338. Tagger Magnetic Field Mapping‏‎ (53 revisions)
  339. CDC Hit Generation‏‎ (53 revisions)
  340. Run Planning Meeting Notes, Apr 26-May 2, 2018‏‎ (52 revisions)
  341. Motion Control Applications‏‎ (52 revisions)
  342. Online Action Items‏‎ (52 revisions)
  343. Barrel Calorimeter‏‎ (52 revisions)
  344. Experiment Readiness Review 2017‏‎ (52 revisions)
  345. CDC algo tuning‏‎ (52 revisions)
  346. Pi0 polarizability Meetings‏‎ (52 revisions)
  347. Run Planning Meeting Notes, Mar 2 - Mar 8, 2017‏‎ (52 revisions)
  348. Run Planning Meeting Notes, May 2-May 6, 2018‏‎ (51 revisions)
  349. Final Design‏‎ (51 revisions)
  350. CDC Construction Details‏‎ (51 revisions)
  351. GlueX Project Overviews‏‎ (51 revisions)
  352. FCAL Fabrication Readiness Review‏‎ (51 revisions)
  353. Run Planning Meeting Notes, Feb 1-Feb 7, 2018‏‎ (51 revisions)
  354. Mapping PS results‏‎ (51 revisions)
  355. Fall 2019 DIRC Commissioning‏‎ (51 revisions)
  356. FADC FPGA Programming Meetings‏‎ (51 revisions)
  357. RunPeriod-2018-08 Validation‏‎ (51 revisions)
  358. HOWTO get your jobs to run on the Grid‏‎ (51 revisions)
  359. Mini-BCAL Update June 19, 2012‏‎ (51 revisions)
  360. GlueX Data Classes‏‎ (50 revisions)
  361. Run Planning Meeting Notes, December 16 - December 22, 2021‏‎ (50 revisions)
  362. Charged Pion Polarizability Experiment in Hall-D‏‎ (50 revisions)
  363. Mattione Update 04302014‏‎ (50 revisions)
  364. Analysis Shift Meeting Agenda, November 21 - November 27, 2021‏‎ (50 revisions)
  365. CDC gain calibrations‏‎ (50 revisions)
  366. Conference Proceedings‏‎ (50 revisions)
  367. Run Planning Meeting Notes, Nov 8-Nov 14, 2018‏‎ (50 revisions)
  368. March 1, 2017, Production & Analysis Working Group‏‎ (50 revisions)
  369. Run Coordination Meetings: Fall 2015 Run‏‎ (50 revisions)
  370. BCAL reconstruction 11/28/11‏‎ (50 revisions)
  371. Run Coordination Meetings:Fall2021‏‎ (50 revisions)
  372. SRC/CT Calibrations‏‎ (49 revisions)
  373. BLTWG Meeting 12/6/2007‏‎ (49 revisions)
  374. Run Planning Meeting Notes, Jan 23-Jan 29, 2020‏‎ (49 revisions)
  375. Data Monitoring Database‏‎ (49 revisions)
  376. Run Planning Meeting Notes, Mar 28 - Apr 3, 2019‏‎ (49 revisions)
  377. CDC bad channels‏‎ (49 revisions)
  378. Mini BCAL for EIC‏‎ (48 revisions)
  379. SCONS for online‏‎ (48 revisions)
  380. Active Collimator‏‎ (48 revisions)
  381. Raid-to-Silo Transfer Strategy‏‎ (48 revisions)
  382. Run Planning Meeting Notes, April 19-April 25, 2016‏‎ (48 revisions)
  383. Mattione sim-recon Code Documentation‏‎ (48 revisions)
  384. Run Coordination Meetings:Winter2024‏‎ (48 revisions)
  385. Baby BCAL at JLab‏‎ (48 revisions)
  386. Mark's Sandbox‏‎ (48 revisions)
  387. Locking in JANA‏‎ (48 revisions)
  388. Beam Simulations‏‎ (47 revisions)
  389. Run Planning Meeting Notes, November 4 - November 10, 2021‏‎ (47 revisions)
  390. Trigger Commissioning Meetings‏‎ (47 revisions)
  391. Comparison of radiation damage between FLUKA and Geant‏‎ (47 revisions)
  392. Run Planning Meeting Notes, August 6 - 12, 2020‏‎ (47 revisions)
  393. Configuration Management‏‎ (47 revisions)
  394. September 19, 2014 Data Monitoring‏‎ (47 revisions)
  395. CHESS X-ray measurements 11/2006‏‎ (46 revisions)
  396. Analysis FAQ‏‎ (46 revisions)
  397. CDC Fabrication Readiness Review‏‎ (46 revisions)
  398. Planning for 2015 DIRC Review‏‎ (46 revisions)
  399. Tagger Engineering Design‏‎ (46 revisions)
  400. Mattione Update 09172012‏‎ (46 revisions)
  401. GlueX Physics Review Papers‏‎ (46 revisions)
  402. Run Planning Meeting Notes, Feb 27-Mar 05, 2020‏‎ (45 revisions)
  403. List of FCAL Beamtest Component IDs‏‎ (45 revisions)
  404. GlueX Physics Exotc Quantum Number Mesons‏‎ (45 revisions)
  405. Meeting with SICCAS‏‎ (45 revisions)
  406. Photon Reconstruction in b1pi events 02/10/2012‏‎ (45 revisions)
  407. CPP DAQ/Monitoring Test Spring 2022‏‎ (45 revisions)
  408. JEF meeting, April 8, 2022‏‎ (45 revisions)
  409. Run Planning Meeting Notes, Mar 21 - Mar 27, 2019‏‎ (45 revisions)
  410. Spring 2016 Recon Checklist‏‎ (45 revisions)
  411. Possible Meeting Topics‏‎ (45 revisions)
  412. Results with the active collimator in the Hall B photon beam‏‎ (45 revisions)
  413. HOWTO use AmpTools on the JLab farm GPUs‏‎ (45 revisions)
  414. May 7, 2009 Readout‏‎ (45 revisions)
  415. KPP November 30, 2014‏‎ (44 revisions)
  416. 2013 Software Review‏‎ (44 revisions)
  417. Run Planning Meeting Notes, Mar 9 - Mar 15, 2017‏‎ (44 revisions)
  418. Solenoid Controls Redesign‏‎ (44 revisions)
  419. Resolutions‏‎ (44 revisions)
  420. FA125 Data Format July 7, 2015‏‎ (44 revisions)
  421. Run Planning Meeting Notes, March 15 - March 22, 2023‏‎ (44 revisions)
  422. Run Coordination Meetings:Summer Fall2022‏‎ (44 revisions)
  423. DIRC Software Overview‏‎ (44 revisions)
  424. Slow controls‏‎ (44 revisions)
  425. CPP Design Meetings‏‎ (44 revisions)
  426. GlueX PAC 2010‏‎ (44 revisions)
  427. Run Planning Meeting Notes, September 10 - 16, 2020‏‎ (44 revisions)
  428. Simulations‏‎ (44 revisions)
  429. Email Lists‏‎ (43 revisions)
  430. How to Setup Visual Studio Code for the ifarm‏‎ (43 revisions)
  431. Run Planning Meeting Notes, October 26 - November 2, 2022‏‎ (43 revisions)
  432. Microscope Fabrication Readiness Review‏‎ (43 revisions)
  433. Run Planning Meeting Notes, Feb 28 - Mar 6, 2019‏‎ (43 revisions)
  434. Basic formalism for X-ray monochromator resolution‏‎ (43 revisions)
  435. CDC prototype drift times‏‎ (43 revisions)
  436. CDC transfer func attempt‏‎ (43 revisions)
  437. FCAL Installation‏‎ (43 revisions)
  438. Bill's to do list‏‎ (43 revisions)
  439. Commissioning Calibration Data‏‎ (42 revisions)
  440. BLTWG Meeting 11/25/2013‏‎ (42 revisions)
  441. Mattione Kaon PID Studies h2Prime(2600)‏‎ (42 revisions)
  442. CDC events‏‎ (42 revisions)
  443. Hall D Package Manager‏‎ (42 revisions)
  444. FCAL energy calibration‏‎ (42 revisions)
  445. Run Planning Meeting Notes, October 14 - October 20, 2021‏‎ (42 revisions)
  446. Optical link connections‏‎ (42 revisions)
  447. Event Analyzer‏‎ (42 revisions)
  448. Photon Beam Polarimetry‏‎ (42 revisions)
  449. Run Planning Meeting Notes, Dec 5-Dec 11, 2018‏‎ (42 revisions)
  450. CPP and NPP Experiment Configuration‏‎ (41 revisions)
  451. CDC prototype more on timing 3‏‎ (41 revisions)
  452. Mattione Update 08212013‏‎ (41 revisions)
  453. Offline Monitoring Incoming Data‏‎ (41 revisions)
  454. FA125 Data Format June 23, 2015‏‎ (41 revisions)
  455. ADC data‏‎ (41 revisions)
  456. BCAL hadronic efficiencies‏‎ (41 revisions)
  457. Run Planning Meeting Notes, Feb 15-Feb 21, 2018‏‎ (41 revisions)
  458. CDC travel plans‏‎ (41 revisions)
  459. First look at TOF calibration‏‎ (40 revisions)
  460. 2023 Data Production‏‎ (40 revisions)
  461. Run Planning Meeting Notes, Nov 14-Nov 21, 2018‏‎ (40 revisions)
  462. Action Items‏‎ (40 revisions)
  463. FDC Fabrication Readiness Review‏‎ (40 revisions)
  464. Run Coordination Meetings:Fall2018 Run‏‎ (40 revisions)
  465. Neutral Particle PID May 2007‏‎ (40 revisions)
  466. Monitoring System Requirements‏‎ (40 revisions)
  467. CDC 06 02 2008‏‎ (39 revisions)
  468. Run Planning Meeting Notes, Apr 4 - Apr 10, 2019‏‎ (39 revisions)
  469. Apr 15, 2010 Calorimetry‏‎ (39 revisions)
  470. Crystals‏‎ (39 revisions)
  471. CDC time spikes‏‎ (39 revisions)
  472. PrimEx-eta Short Term Run Plan‏‎ (39 revisions)
  473. OWG Meeting 3-Aug-2011‏‎ (39 revisions)
  474. Monte Carlo simulation of the CHESS C1 beamline‏‎ (39 revisions)
  475. JEF meeting, October 13, 2023‏‎ (39 revisions)
  476. Mattione Kaon PID Studies‏‎ (39 revisions)
  477. Photon flux for GlueX empty target runs‏‎ (39 revisions)
  478. FCAL2 Crates‏‎ (38 revisions)
  479. Aug 20, 2009 Calorimetry‏‎ (38 revisions)
  480. Mattione Kaon PID Studies eta1Prime(2300)‏‎ (38 revisions)
  481. C++11 in Hall D Online‏‎ (38 revisions)
  482. CDC tilted detectors‏‎ (38 revisions)
  483. SRC/CT Detector Calibration‏‎ (38 revisions)
  484. FDC‏‎ (38 revisions)
  485. Polycom Equipment‏‎ (38 revisions)
  486. HOWTO use the GlueX Singularity Container‏‎ (38 revisions)
  487. GlueX-2023-01 data reconstruction‏‎ (38 revisions)
  488. ASIC meeting June 14, 2010‏‎ (38 revisions)
  489. Calorimeter Review‏‎ (38 revisions)
  490. PrimEx-eta phase3 FCAL time/energy calibrations‏‎ (38 revisions)
  491. GlueX Offline Meeting, March 23, 2010‏‎ (37 revisions)
  492. Barrel Calorimeter Shift‏‎ (37 revisions)
  493. Analysis Shift Meeting Agenda, November 14 - November 20, 2021‏‎ (37 revisions)
  494. Detector Alignment‏‎ (37 revisions)
  495. Online Data Challenge 2013 List of Issues‏‎ (37 revisions)
  496. DAQ test computer‏‎ (37 revisions)
  497. Alarm System for EPICS‏‎ (37 revisions)
  498. Run Planning Meeting Notes, November 18 - November 24, 2021‏‎ (37 revisions)
  499. Minutes-9-27-2012‏‎ (37 revisions)
  500. Private:SiPM timing measurements‏‎ (37 revisions)

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)