Summer 2020 GlueX Run
Run Statistics Google Spreadsheet.
Meeting General Agenda
Run Planning Meeting Notes, July 27-August 5, 2020
Run Planning Meeting Notes, August 6 - 12, 2020
Run Planning Meeting Notes, August 13 -17, 2020
Run Planning Meeting Notes, August 20-26, 2020
Run Planning Meeting Notes, August 27-September 2, 2020
Run Planning Meeting Notes, September 3 - 9, 2020
Run Planning Meeting Notes, September 10 - 16, 2020
Run Planning Meeting Notes, September 17 - 21, 2020
Connect Information
To connect from the outside by phone please do the following
1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.
4.) The moderator code is 8394
Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada
Specific instructions for connecting from JLab's Hall D conference room:
- Turn polycon on if necessary (do it before turning the computer on)
- With the polycon, place a call at 199.48.152.152
- Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
- You may have to unmute the microphone: #*4
- Turn the computer on if needed
Beam and Hall configuration
- Beam energy expected:
- 11.408 GeV (i.e. about 200 MeV less than value for Spring 2019)
- Solenoid:
- 1350A
- CW Beam:
- 250 MHz frequency.
- Range: 1 nA-900
- Chopper slit: With Hall C until Sept. 3rd (always at 5 passes). Then, with Hall A (Hall A: one pass always until Sept. 3rd. Then off.) Note: Hall B at 1 pass for the first 4 days, then, at 5 pass until the end of the run.
- Standard current and radiators
- ~350 nA on a 4.1·10-4 R.L. radiator (50 μm diamond). (RSAD limit 500nA on 58 μm diamond))
- ~350 nA on a 33.7·10-5 R.L. AL radiator (30 µm Al). (RSAD limit 600nA on 30 µm Al radiator))
- Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).
- Radiators:
- Goniometer radiators:
- Diamond JD70-103 (50 μm - 4.1·10-4 R.L., 7×7 mm²) - new crystal - Not expected to be good according to rocking curve.
- Diamond JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) - Used for the second part of GlueX's Fall 2018 run and Fall 2019/Spring 2020. Good performance.
- Diamond JD70-106 (50 μm - 4.1·10-4 R.L., 7×7 mm²) - Aligned and used shortly during Tagger Accidental test in Spring 2020. Did not display sharp coherent peak.
- Diamond JD70-107 (55 μm - 4.6·10-4 R.L., 7×7 mm²) - new crystal - Not expected to be good according to rocking curve.
- Diamond JD70-109 (50 μm - 4.1·10-4 R.L., 7×7 mm²) - new crystal - Not expected to be good according to rocking curve.
- Amorphous 40 μm Al radiator (44.9·10-5 R.L.)
- V-wire (for TAC run).
- Amorphous
- 1.64 µm Al (1.86·10-5 R.L., see study)
- 10 µm Al (11.2·10-5 R.L.)
- 30 µm Al (33.7·10-5 R.L.)
- Goniometer radiators:
- Tagger quadrupole on (-4.2 A).
- Collimator hole: Default running: 5.0 mm.
- Targets:
- LH2 target: cryogenic target
- PS converter: 75 μm
- Miscellaneous:
- PS test area:
- Left arm: TRD and 12 calorimeter crystals to be tested
- Right arm: scintillator calorimeter to be tested
- DIRC installed.
- Other?
- PS test area:
General Information
This document describes the run plan for the Hall D Summer 2020 run.
- Schedule for the run (see July 2020-Dec. 2021 official schedule):
- July 13th - July 26th: Electron beam restoration.
- July 27th - Sept.6th: 6 weeks for GlueX high luminosity production.
- Accelerator overall plan and priorities: Finish Spring run 2020 cut short by pandemic.
- Deliver physics beam to 4 halls.
- Hall D plan
- Experiment: GlueX-II E12-12-002
- This run period is short (6 weeks). To make the acquired data set worth analyzing: maximize production, do only crucial tests.
- One TAC runs synchronized with test of new FCal divider.
- Two empty target runs (One at the start of the run, the other consecutive to TAC run)
- Trigger test for the SRC experiment
- CPP trigger test.
- Expected Staffing and responsibilities:
- The Run Coordinator oversees the run:
- July 13th-July 26th: 14 days: Alexandre Deur (accelerator restoration)
- July 27th-Aug. 5th, 10 days: Alexandre Deur
- Aug 5th-Aug 12th, 7 days: Alexander Austregesilo
- Aug 12th-Aug 19th, 7 days: Wenliang Li
- Aug 19th-Aug 26th, 7 days: Mark-Macrae Dalton
- Aug 26th-Sept. 2nd, 7 days: Igal Jaegle
- Sept 2nd-Sept 9th, 7 days: Keigo Mizutani
- Sept 9th-Sept 16th, 7 days: Alexandre Deur
- Sept 16th-Sept 21st, 5 days: Igal Jaegle
- The Run Coordinator oversees the run:
- The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (M. Stevens) verify that the proper safety rules are followed. PDL is:
- PDL: Benedikt Zihlmann, Deputy PDL: Lubomir Penchev
- The analysis coordinator (Alexander Austregesilo) oversees the off-line diagnostic of the different systems and analysis of the data.
- Shifts: 1 person per shift. 4 shifts per day Shift Schedule Skeleton
- The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (M. Stevens) verify that the proper safety rules are followed. PDL is:
- Coordination Activities:
- The RC will attend the MCC meetings at 7:45am and 8:00am and the weekly MCC meeting (Wednesday, 1:30pm). The PDL will attend the weekly MCC meeting.
- Run meetings: broadcasted on Bluejeans. 8:45am in the counting house conference room. The Run Coordinator will be responsible for organizing and chairing the meeting.
- Start of run: Daily meetings
- Production: Alternate nominal length meetings (Monday/Thursday) with short meetings (Tuesday, Wednesday, Friday)
- Useful links:
- Accelerator schedule and information
- Link to Richard Jones program to plot the beam profile at the collimator.
- Links to previous runplans
- Web-accessible EPICS information
- Links to beam parameters/radiation level monitoring:
- Last 8-hours plots showing 1-minute, 10-minute, and hourly averages
- Same but Last 24-hours
- Same but Last 72-hours
- Week, month, and quarter (3 months) plots also exist, with similar web addresses.
- A map of the radiation monitors
Runplan
- Verify electron beam quality and establish photon beam (assume 1 day).
- Ion Chambers trip threshold must be set using diamond JD70-105 as well as the 4 Al. radiators (1 on goni, 3 on amorphous radiator ladder)
- Tune electron beam with radiator retracted
- Radiator (amorphous and diamond) must be retracted. Collimator should be in blocking position.
- Typical levels are (for radiator retracted, collimator fully blocking, electron beam current 50 nA)
- RAD102_P1 ~ 10 mrad/hr (tagger area, gammas, between tagger and dump)
- RAD102_P2 ~30 mrad/hr (tagger area, gammas, on the ground below the goniometer).
- RAD102_P3 ~ 0.3 mrem/hr (tagger area, neutrons, near electronics racks)
- RAD508_P1 < 0.1 mrad/hr (collimator cave, gammas).
- RAD508_P2 ~ 0. mrad/hr (Hall. Neutrons).
- Typical levels are (for radiator retracted, collimator fully blocking, electron beam current 50 nA)
- Radiator (amorphous and diamond) must be retracted. Collimator should be in blocking position.
- Establish good photon beam
- Make sure tagger quadrupole is on and at -4.2 A. (It can be turned on only once the Hall is in power/beam permit.)
- Insert 2*10-5 RL radiator. Call MCC and ask to mask the FSD and turn off beam each time a radiator is moved
- Typical levels are (for 2×10-5 radiator, electron beam current 50 nA)
- RAD102_P1= 35 mrad/hr (tagger area, gammas, between tagger and dump)
- RAD102_P2= ~ 50 mrad/hr (tagger area, gammas, on the ground below the goniometer)
- RAD102_P3= ~2 mrem/hr (tagger area, neutrons, near electronics racks)
- RAD508_P1= ~10 mrad/hr (collimator cave, gammas).
- RAD508_P2 < ~ 0. mrad/hr (Hall. Neutrons).
- Typical levels are (for 2×10-5 radiator, electron beam current 50 nA)
- Insert 2*10-5 RL radiator. Call MCC and ask to mask the FSD and turn off beam each time a radiator is moved
- Verify beam position and envelope (Hovanes).
- Ask MCC to set beam position on 5C11b to x=-0.5 mm and y=+1.0 mm.
- Ask MCC for 5C11 and 5C11B HARP. Then do our radiator HARP scan, see instruction. If it looks good, proceed to next step. Otherwise, inform MCC.
- Insert profiler (no need for masking FSD when an object is inserted in the photon line), run with 10×10-4 radiator and 50 nA. Beam on the profiler should be at x=0.0±0.5cm; y=0.0±0.5cm. If not, inform MCC.
- Radiation level study (1h):
- Run 5 min without radiator (Call MCC and ask to mask the FSD each time the radiator is moved). Beam current: 50nA. Repeat at 100 nA and 200 nA. There is need to run the DAQ or stop the beam between each steps: the data are recorded by EPICS. However, the beam need to be off when moving to a different radiator for the next steps.
- Run 5 min with the 10-4 radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA
- Run 3 min with the 3*10-4 radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA
- Photon flux optimization and Active Collimator calibration. (20 + 20 mins). Call Hovanes.
- re-Insert the 10-4 radiator (Call MCC). Use about 100 nA beam current. This will provide the Act. Col. nominal positions for its high gain values.
- Determine maximum photon beam transmission by doing 2D scans using the collimator x/y motions (Hovanes. 1h)
- Repeat procedure with 2*10-5 radiator (Call MCC) and 50 nA beam current. This will provide the Act. Col. nominal positions for its low gain values.
- Record on the white board what is the beam position on 5C11b and Active Collimator for optimal photon transmission, both for low and high Act. Col. gain.
- Until Hovanes determines to optimal 5C11b and Active Collimator position, keep profiler in and beam locked (MCC's duty) on the nominal 5C11b and x=0,y=0 profiler position. Once Active Collimator nominal beam position is known, retract profiler and lock the beam (MCC) on the active collimator.
- Detector and beamline checkout.
- Any time before starting production (beam quality is not important): microscope HV scan (2h, R. Jones)
- Reestablish L1 trigger (Alex. Somov. 2h).
- PS and TAGH HV scan. (Alex. Somov. 1h).
- Reestablish DAQ (Sergei, 2h).
- General detector calibration (Sean Dobbs. (703-887-1776) 1h). Use 2×10-5 Al. radiator. Beam current 200nA (Solenoid magnet is off)
- Run 15 min (solid time) in Long Mode (Mode 10)
- Run 15 min (solid time) in Production Mode (Mode 9).
- CDC HV scans (Naomi 6h). Use 4.5×10-4 Al. radiator (on goni). Beam current 360nA
- 47 μm diamond (Start on JD70-105) alignement check. Later during the run, align new JD70-103 (4 polarization configurations) (Hovanes. 2h ).
- GlueX-II pre-production (20h)
- Identical as production below, but at 150 nA. One cycle of five 2h runs on 4 polarization configurations+1 amorphous.
- GlueX-II production
- Standard configuration: 47 μm diamond, 350 nA, 5 mm hole, TPol on 75 μm TPol convertor. 2h runs and no more, as it may be hard to correct for calibration drifts. Cycle over 5 sets of runs: 0o, then 90o, then 45o, then 135o, then amorphous runs.
- Amorphous runs: 4.5×10-4 Al. radiator (on goni). 350 nA
- Log in run information in the shift summary (make a run list). For each production run, log useful comments on DAQ comment window, see [2]
- Tagger quadrupole on
- Harp scan (30 min): Every 2 days
- 2 Empty target run (2h: 1- h to empty/fill back the target, 1h running). Standard production current. After TAC run, beam study or RF recovery.
- Standard configuration: 47 μm diamond, 350 nA, 5 mm hole, TPol on 75 μm TPol convertor. 2h runs and no more, as it may be hard to correct for calibration drifts. Cycle over 5 sets of runs: 0o, then 90o, then 45o, then 135o, then amorphous runs.
- One "TAC" run + test of new FCal divider.
- a few nA, thinest Al. radiator and ComCal.
- To be coordinated with MCC.
- Measure bleedthrough. If acceptable, (~nA or less), proceed with TAC-ComCal run. Otherwise, explore possibility for invasive TAC run.
- If commissioning and analysis are successful, once a day (?), a beam envelope measurement by rastering on Act. Col. ??min
- Long mode 10 min run. Once a week (20 min).
- Amorphous run. Every set of 4 diam. orientation runs. 1h Standard production current. Time to switch from pol. to unpol.: 10min. time to switch from unpol. to pol.: 30min.
- Synchronize TAC run with test of new FCal divider (A. Somov).
- Trigger test for the SRC experiment (A. Somov, 6 hours)
- CPP trigger test (??34h??). (https://halldweb.jlab.org/wiki/index.php/CPP_Test_2020_-_Schedule discussion on tentative plan]) Could be done during pass change for Hall C on Sept. 4th. There will be 2-3 days of running left depending on how smooth the pass change goes. If so, we likely need other tests to use the left beam time (We could do the TAC run then/Empty target run/...?)
Hall D situation room (current run plan)
Hall D counting room white board
Runplan time charts
Summer 2020 time charts:
The horizontal scale is the time during which beam is available (in other words, it would be the real time with 100% of beam efficiency). The task time estimates given on the plot have 100% contingency.
Accelerator status
- Link to accelerator short term schedule (White board)
- Link to accelerator SAD calendar
- Bluejeans code for the daily MCC meetings and Wednesday 1:30 meeting: 569476853
Hot Checkout
To be completed by Thurs. July. 23rd.
100% ready ; 0% checked ; 0% not ready
Readiness for Fall 2019/Spring 2020 run
(This section is commented out for clarity)
Live Camera Feeds from the Four Counting Houses
- These feeds SHOULD be open and visible at all times from one of the monitors in each of the counting houses.
- Management cautions AGAINST opening them from other locations or offsite, out of concern for available bandwidth.