Run Planning Meeting Notes, December 16 - December 22, 2021

From GlueXWiki
Jump to: navigation, search

Tuesday December 21

  1. Last 24h:
  2. Issues
  3. Summaries
  4. Plans
    • End of Fall 2021 run. Hall shut down tasks:
      • Secure beam line:
        • All radiators retracted.
        • Collimator in blocking position.
        • PS and sweeping magnets off.
      • Solenoid ramp down.
      • Target will already be empty. Keep PTR on since the target group might do some investigation of the vacuum event.
      • High and low Voltages off.
      • Crates will be kept on.

Monday December 20

  1. Last 24h:
    • ~4h of production on 4He (150 nA, 0/90 para and perp).
    • 2 long down times: ~5h between Sunday 9am-13:45 (multiple causes. Mains ones: Bulk power supply and 1L04 RF). Monday: 1am-ongoing (IL05 RF).
    • 2h on Amorphous radiator (runs 90631, 90632).
    • CPP trigger tests (~5h)
  2. Issues
  3. Plans
    • Production on 4He (150 nA, 0/90 para and perp) until Tuesday 7am.
    • 3h trigger tests in raw data mode.
    • 1h CPP trigger test.
    • Finish run period with ~3h Empty target run, from 3:30am (12/21/2021) to shutdown around 7am. (This will permit to check if the target event above has made ice to accumulate on the target cell).
    • No analysis meeting today

Sunday December 19

  1. Last 24h:
    • Smooth data collection on 4He (150 nA, 0/90 para and perp).
  2. Issues
    • Nothing special.
  3. Plans
    • Production on 4He (150 nA, 0/90 para and perp).
    • Amorphous run Sunday morning.
    • CPP trigger tests (During A. Somov shift in the afternoon.)

Saturday December 18

  1. Last 24h:
    • Collected data on LD2 at 140 nA, 0/90 para and perp until 14:10. Then started empty target run, as planned before switching to 4He.
    • 1h empty target run (run 90602, Diamond 0/90, para, 150 nA).
    • Access for target gas change (C. Carlin).
    • Around 23:00 (Friday) 4He reached nominal temperature. ⇒ Ready for production but the beam was unavailable. About 1:50am: Started production on 4He (150 nA, 0/90 para and perp).
  2. Issues
  3. Plans
    • Production on 4He (150 nA, 0/90 para and perp).

Friday December 17

  1. Last 24h:
    • Smooth production on LD2 at 140 nA, 0/90 para and perp. 3 beam interruptions (1h+0.3h+2.5h). Took one amorphous run (90578).
  2. Issues
  3. Plans
    • Continue running on LD2 at 140 nA, 0/90 para and perp until 1:45pm (if empty target run is needed) or 3:45pm (if not).
    • Target change LD24He:
      • If an empty target run is desirable, start emptying the target and turn off pulse refrigerator at 1:45pm (assuming a 2h run). Otherwise, start emptying/pulse refr. off at 3:45pm.
      • 2pm-4pm: 2h empty target run?
      • 4pm. Ask MCC for beam off and Rapid Access. Chris Carlin goes in the Hall to start switching gas. Solenoid will stay on: be aware of magnetic field fringes.
      • Between 5pm and 6pm: Chris is done switching gas. End of rapid access.
      • Ask for beam. (No need for beam restoration check as the beam down time is small): while the target cools down (about 3h process). A. Somov will take test data.
    • around 9pm: target is cold. Start running on L4He at 150 nA, 0/90 para and perp.

Thursday December 16

  1. Last 24h:
    • Smooth production on LD2 at 140 nA, 0/90 para and perp. Interrupted only by search for better spot on diamond (~1h see below) and ~1h of RF-related down time.
    • Spectra from A. Somov.
  2. Issues
  3. Plans
    • Continue running on LD2 at 140 nA, 0/90 para and perp. Do one amorphous run today.
    • Discussion on possible target change to L4He.
    • Status of possible CPP test.