Search results

From GlueXWiki
Jump to: navigation, search

Page title matches

Page text matches

  • * Controls projects and test station - Hovanes, Elliott Present: Simon T, Carl T, Bryan M, Hovanes E, Eugene C, Beni Z, Alex S, Dave L, Mark I, Yi Q
    5 KB (852 words) - 17:54, 31 March 2015
  • |Hovanes Egiyan |hovanes@jlab.org
    4 KB (507 words) - 13:09, 8 July 2021
  • *** Hovanes connected to many A-B tags in coil test setup.
    12 KB (1,620 words) - 15:11, 6 May 2011
  • ...y F., Simon T>, Vardan G., Dmitry R., Bryan M., Sean D., Dave A., Carl T., Hovanes E., Naomi J. * Hovanes reminded us that there was an issue with some computers not mounting the RA
    4 KB (667 words) - 21:52, 23 March 2016
  • ...Dan S., Nathan S., Alex D., Eugene C., Hovanes E., Alex S., Curtis M., and Hovanes E.
    1 KB (197 words) - 18:39, 29 March 2016
  • ...D., Curtis M., Dave A., Bryan M., Sergey F., Alex S., Mark I., Dmitry R., Hovanes E. * Brief discussion on configuration options. Hovanes asked if we should have a guy to allow users to control the settings kept i
    5 KB (855 words) - 09:04, 3 December 2015
  • ...eb.jlab.org/doc-private/DocDB/ShowDocument?docid=2934 Controls Status] --- Hovanes Egiyan
    9 KB (1,147 words) - 12:39, 14 March 2017
  • * Present: Alex S., Brendan P., Richard J. Tim W., Hovanes E., Yi Q., and Hannah Wissmann # Progress on direct polarimetry in the Hall D beamline -- ''Hovanes''
    487 B (69 words) - 12:11, 29 November 2010
  • * '''JLab''': Hovanes Egiyan, Mark Ito (chair), David Lawrence, Lubomir Pentchev, Elliott Wolin,
    5 KB (785 words) - 23:31, 31 March 2015
  • ###* Left about 8 bases in EEL so that Hovanes can continue to test EPICS
    5 KB (755 words) - 17:13, 24 February 2017
  • * '''JLab''': Hovanes Egiyan, Mark Ito (chair), David Lawrence, Lubomir Pentchev, Yi Qiang, Sasch
    3 KB (470 words) - 11:22, 31 March 2015
  • * '''JLab''': Eugene Chudakov, Hovanes Egiyan, Mark Ito (chair), Yi Qiang, Sascha Somov, Simon Taylor, Elliott Wol
    4 KB (613 words) - 07:07, 1 April 2015
  • * '''JLab''': Andrew Blackburn, Hovanes Egiyan, Mark Ito (chair), Yi Qiang, Sasha Somov, Simon Taylor, Elliott Woli
    6 KB (875 words) - 02:07, 1 April 2015
  • Attendees: Elliott W, Simon T, Mark I, Bryan M, Vardan G, Hovanes E, Justin B, Andrew B, Yi Q, Alex S, Beni Z, Dave L.
    4 KB (698 words) - 09:12, 29 July 2010
  • * Present: Hovanes E., Eugene C., Tim W., Sascha S., Brendan P., Igor S., Richard J., Dan S.,
    1,019 B (139 words) - 16:54, 24 February 2017
  • ...tt W, Andrew B, Justin B, Simon T, Mark I, Beni Z, Bryan M, David L, Yi Q, Hovanes E, Vardan G.
    4 KB (603 words) - 14:17, 23 August 2010
  • Attendees: Matt, Ryan (IU); Elton, Beni, Tim, John, Eugene, Hovanes (JLab); Zisis (UofR); Will, Pedro (USM)
    4 KB (645 words) - 13:43, 5 August 2010
  • * Present: Hovanes E., Eugene C., Tim W., Sascha S., Brendan P., Igor S., Richard J., Dan S.,
    533 B (76 words) - 10:17, 23 August 2010
  • '''JLab''': Craig Bookwalter, Hovanes Egiyan, Mark Ito, David Lawrence, Yi Qiang, Sascha Somov, Simon Taylor, Ben
    5 KB (746 words) - 04:56, 1 April 2015
  • ##* Hovanes suggests regular harp scans, including two ACC harps in D beamline, MCC mus ## diamond tuning by Hovanes
    4 KB (595 words) - 23:00, 6 April 2016
  • * HMI and EWEB programming - Yi, Elliott, Hovanes
    996 B (151 words) - 14:10, 23 August 2010
  • * HMI and EWEB programming - Yi, Elliott, Hovanes
    962 B (141 words) - 12:01, 1 September 2010
  • ''Attendees: Elton, John, Hovanes, Tim, Yi, Eugene (JLab); Matt, Ryan (IU); Zisis, Andrei (UofR); Will (USM);
    7 KB (992 words) - 15:37, 2 September 2010
  • * '''JLab''': Eugene Chudakov, Hovanes Egiyan, Mark Ito (chair), Elton Smith, Sascha Somov, Simon Taylor Elton, Eugene, Sascha, Hovanes, Simon, Mark
    3 KB (429 words) - 17:12, 24 February 2017
  • ...p://halldeweb1.jlab.org/user/web/mps_readback.html EWEB programming] - Yi, Hovanes
    1 KB (198 words) - 08:59, 16 September 2010
  • * EPICS <--> PLC communications - Hovanes ...[http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes
    3 KB (453 words) - 21:54, 22 September 2010
  • * Present: Hovanes E., Alex S., David L., Igor S., Richard J., Yi Q., and Brendan P.
    708 B (103 words) - 12:07, 20 October 2010
  • '''JLab''': Hovanes Egiyan, Mark Ito (chair), Yi Qiang, Dmitry Romanov, Simon Taylor, Elliott W
    4 KB (558 words) - 16:44, 24 February 2017
  • * EPICS <--> PLC communications - Hovanes ...[http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes
    2 KB (239 words) - 16:56, 29 September 2010
  • Present: Craig Bookwalter, Hovanes Egiyan, Mark Ito (chair), Dmitry Romanov, Sasha Somov, Simon Taylor, Elliot
    3 KB (372 words) - 18:44, 31 March 2015
  • * Present: Tim W., Dan S., Yi Q., Hovanes E., Alex S., Igor S., Brendan P, and Richard J.
    715 B (98 words) - 11:54, 21 March 2013
  • * EPICS <--> PLC communications - Hovanes ...[http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes
    2 KB (330 words) - 15:42, 6 October 2010
  • * Coil test update - Elliott, Yi, Hovanes
    706 B (95 words) - 15:07, 13 October 2010
  • * EPICS <--> PLC communications - Hovanes ...[http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes
    2 KB (236 words) - 11:08, 14 October 2010
  • * '''JLab''': Eugene Chudakov, Hovanes Egiyan, Mark Ito, Rory Miskimen, Elton Smith, Tim Whitlatch, Beni Zihlmann
    3 KB (447 words) - 11:36, 31 March 2015
  • * Present: Igor S., Richard J., Brendan P., Alex S., Lei G., Eugene C., and Hovanes E.
    1,023 B (145 words) - 12:07, 20 October 2010
  • Hovanes Egiyan,
    4 KB (669 words) - 23:41, 31 March 2015
  • * EPICS - Hovanes ...[http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes
    2 KB (255 words) - 09:00, 21 October 2010
  • * EPICS - Hovanes ...[http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes
    2 KB (329 words) - 08:51, 28 October 2010
  • '''JLab''': Hovanes Egiyan, Mark Ito (chair), Dmitry Romanov, Simon Taylor, Elliott Wolin, Beni
    4 KB (702 words) - 02:51, 1 April 2015
  • * Present: R. Jones, Igor S., Tim W., Alex S., and Hovanes E. ::* [[polarimeter_11_01_2010 | Study by Hovanes]]
    591 B (80 words) - 11:30, 1 November 2010
  • * EPICS - Hovanes ...[http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes
    4 KB (566 words) - 13:00, 11 November 2010
  • ...ivate/DocDB/ShowDocument?docid=1837 Controlling HV, LV and VME chassis] - Hovanes Egiyan
    9 KB (1,102 words) - 12:40, 14 March 2017
  • * Experience with coil test control system - Yi, Hovanes, Elliott
    601 B (84 words) - 17:23, 22 November 2010
  • * Present: Alex S., Yi Q., Hovanes E., Elton S., Eugene C., Tim W., Dan S., Brendan P., and Richard J. # Progress on direct polarimetry in the Hall D beamline -- ''Hovanes''
    888 B (130 words) - 12:35, 15 November 2010
  • * EPICS - Hovanes ...[http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes
    2 KB (352 words) - 09:47, 19 November 2010
  • * Present: Tim W., Alex S., Richard J., Igor S., Yi Q., Dan S., Franz K., and Hovanes E. # Progress on direct polarimetry in the Hall D beamline -- ''Hovanes''
    759 B (112 words) - 12:38, 14 March 2017
  • * '''JLab''': Hovanes Egiyan, Mark Ito (chair), Chris Keith, Yi Qiang, Tim Whitlatch, Elliott Wol Hovanes mentioned that for photon running in Hall B with hydrogen, the target uses
    3 KB (489 words) - 07:03, 1 April 2015
  • ...gene C., Hovanes E., Mark D., Alex S., Curtis M., Ken L., and Yang G., and Hovanes E. #* [https://logbooks.jlab.org/entry/3389156 there it is!] - ''Hovanes E.''
    3 KB (431 words) - 11:40, 14 March 2016
  • ..._01_10_2011 | Progress on direct polarimetry in the Hall D beamline]] -- ''Hovanes''
    853 B (126 words) - 12:37, 10 January 2011
  • * '''JLab''': Hovanes Egiyan, Graham Heyes, Mark Ito (chair), David Lawrence, Yi Qiang, Dmitry Ro
    6 KB (927 words) - 06:35, 1 April 2015
  • * '''JLab''': Hovanes Egiyan, Mark Ito (chair), Yi Qiang, Sascha Somov, Simon Taylor, Beni Zihlma
    3 KB (418 words) - 23:18, 31 March 2015
  • ..._01_10_2011 | Progress on direct polarimetry in the Hall D beamline]] -- ''Hovanes''
    803 B (110 words) - 12:11, 24 January 2011
  • * EPICS status - Hovanes
    958 B (137 words) - 10:04, 31 January 2011
  • ...lator counters for finding/verifying beam plane location]] ([[User:Hovanes|Hovanes]] 10:59, 7 February 2011 (EST))
    734 B (96 words) - 16:48, 24 February 2017
  • * '''JLab''': Hovanes Egiyan, Mark Ito (chair), David Lawrence, Yi Qiang, Elton Smith, Simon Tayl
    7 KB (1,124 words) - 18:23, 31 March 2015
  • ...g/doc-private/DocDB/ShowDocument?docid=1929 Counting House and Controls] - Hovanes Egiyan
    10 KB (1,269 words) - 12:39, 14 March 2017
  • * EPICS status - Hovanes
    822 B (113 words) - 09:45, 11 February 2011
  • Present: Elliott W, Beni Z, Simon T, Dave L, Alex S, Elton S, Yi Q, Bryan M, Hovanes E, Dave A.
    3 KB (488 words) - 15:44, 17 February 2011
  • ##* Will start working with Hovanes and Elliott to incorporate this protocol into the online system.
    6 KB (958 words) - 15:35, 3 March 2011
  • * '''JLab''': Hovanes Egiyan, Mark Ito (chair), Richard Jones, David Lawrence, Yi Qiang, Igor Sen
    5 KB (768 words) - 11:36, 31 March 2015
  • * Controlling CAN systems - Elliott, Hovanes, Elton * Controls test station - Elliott, Hovanes
    4 KB (678 words) - 16:02, 22 March 2011
  • * Present: Igor S., Richard J., Jim M., Brendan P., Franz K., Sascha S., Hovanes E.
    300 B (41 words) - 23:25, 21 March 2011
  • ## Comments on Hall D slow controls (Elliott/Hovanes) ...Kappos, Stathis Stiliaris (Athens); Matt, Paul (IU); Elton, Beni, Eugene, Hovanes, Elliott, Dave (JLab); Zisis, Andrei, Mehrnoosh Tahani (UofR).
    3 KB (474 words) - 17:14, 24 February 2017
  • * P3E Online tasks - Dave, Hovanes, Elliott * Controlling CAN systems - Elliott, Hovanes
    5 KB (815 words) - 10:37, 31 March 2011
  • * Present: Sascha S., Yi Q., Hovanes E., Igor S., Richard J., Curtis M.
    1 KB (194 words) - 12:20, 4 April 2011
  • *'''JLab''': Hovanes Egiyan, Mark Ito (chair), Yi Qiang, Simon Taylor, Elliott Wolin
    5 KB (850 words) - 23:40, 31 March 2015
  • Present: Hovanes Egiyan, Mark Ito, Chris Keith, Rory Miskimen, Tim Whitlatch (chair), Elliot
    3 KB (430 words) - 22:43, 31 March 2015
  • * Controlling CAN systems - Elliott, Hovanes * Controls test station - Elliott, Hovanes
    6 KB (937 words) - 00:55, 1 April 2015
  • ##* Hovanes has been in contact with Matt and they can provide him CAEN controllers to
    5 KB (772 words) - 18:08, 26 April 2011
  • Elliott W, Beni Z, Graham H, Carl T, Dave L, Josh B, Hovanes E. * Hovanes can tell us about our beamline instrumentation.
    3 KB (420 words) - 10:31, 31 March 2015
  • ...ov/css/products.html, copy it to the desired directory ( I copied to /home/hovanes/CSS/source) and unzip it, name it appropriately.
    9 KB (1,412 words) - 11:19, 18 June 2013
  • * Present: Richard J., James M., Alex S., Yi Q., Mark I., Hovanes E., Ivan T., Vitaly B.
    566 B (83 words) - 11:07, 18 April 2011
  • "Hovanes Egiyan" <hovanes.egiyan@gmail.com> From: Hovanes Egiyan [mailto:hovanes.egiyan@gmail.com]
    9 KB (1,463 words) - 15:09, 19 April 2011
  • Present: Hovanes Egiyan, Jim Fochtman, Mark Ito, Chris Keith, Tim Whitlatch
    4 KB (564 words) - 20:36, 31 March 2015
  • ...gor S., Richard J., Fridah M., James M, Sascha S., Yi Q., Ivan T., Tim W., Hovanes E., and Eugene C.
    804 B (116 words) - 11:05, 16 May 2011
  • * Controls test stand - Hovanes, Elliott Present: Elliott W, Simon T, Bryan M, Graham H, Dave L, Hovanes E, Beni Z, Dave A.
    3 KB (533 words) - 02:24, 1 April 2015
  • * '''JLab''': Hovanes Egiyan, Mark Ito (chair), David Lawrence, Paul Mattione, Yi Qiang, Sascha S
    6 KB (1,003 words) - 17:23, 31 March 2015
  • * Update on target control system - Hovanes, Elliott ...CtrlsForBrooks0254MFC.pdf | Brooks0254 module controls for FDC and CDC]] - Hovanes
    4 KB (587 words) - 23:09, 31 March 2015
  • * Update on Brooks 0254 control IOC and CSS/BOY evaluation - Hovanes
    1 KB (208 words) - 18:44, 31 March 2015
  • * Controls update - Hovanes, Elliott
    935 B (133 words) - 06:05, 1 April 2015
  • * Controls update - Hovanes, Elliott Most items ordered, Hovanes is getting the test stand going in EEL 126.
    3 KB (464 words) - 04:25, 1 April 2015
  • * '''JLab''': Eugene Chudakov, Hovanes Egiyan, Mark Ito (chair), David Lawrence, Paul Mattione, Dmitry Romanov, Si
    5 KB (823 words) - 22:03, 31 March 2015
  • * Controls test stand, BOY, etc. - Hovanes
    2 KB (281 words) - 11:20, 31 March 2015
  • * '''JLab''': Hovanes Egiyan, Jim Fochtman, Mark Ito, Tim Whitlatch (chair), Elliott Wolin
    2 KB (328 words) - 01:50, 1 April 2015
  • * Controls test stand - Hovanes ...tworks, but they did not get DHCP offer (may be 1 out of 10) on 36 subnet. Hovanes and Sasha will be working with CF cards for now until the problem has been
    4 KB (641 words) - 02:07, 1 April 2015
  • * '''JLab''': Hovanes Egiyan, Mark Ito (chair), David Lawrence, Yi Qiang, Sascha Somov, Simon Tay
    2 KB (343 words) - 22:25, 31 March 2015
  • * Controls test stand, BOY, etc. - Hovanes * More on strategy for use of PLC vs IOC vs mixed system - Elliott, Hovanes, Josh
    3 KB (473 words) - 11:36, 31 March 2015
  • ##* Sent a CAEN-Ethernet and PS this week to Hovanes
    4 KB (588 words) - 11:33, 31 March 2015
  • ## Electronics: Meeting last week with Dan Bennett and Hovanes regarding integration of the voltage to the bases into EPICS ##* The detail response Hovanes' questions are being formulated
    5 KB (846 words) - 15:38, 17 August 2011
  • * Controls test stand status - Hovanes * Hovanes installed PLC CPU and the software to program and configure the controller
    5 KB (938 words) - 06:05, 1 April 2015
  • * '''JLab''': Hovanes Egiyan, Mark Ito (chair), Puneet Khetarpal, David Lawrence, Dmitry Romanov,
    4 KB (589 words) - 20:27, 31 March 2015
  • ...computer. There were a lot of useful discussions with many suggestions to Hovanes. At 10:00am IU group had to leave to join another meeting. ...nds (an estimate by Dan). The dead time (350 ms per parameter according to Hovanes) is dominated by the time the base prepares the response.
    3 KB (487 words) - 14:06, 11 August 2011
  • ...r supplies: Received chassis and PS for +/-5V. Expecting PS for bias soon. Hovanes will also use the supplies to begin programing slow controls
    4 KB (548 words) - 17:46, 25 August 2011
  • ** test stand status - Hovanes ** license purchases - Hovanes, Elliott
    6 KB (974 words) - 20:27, 31 March 2015
  • * Equipment orders - Mark, Hovanes * ControlNet vs Ethernet/IP - Hovanes
    5 KB (840 words) - 10:35, 31 March 2015
  • * Hall, counting house and tagger building networking - Elliott, Hovanes * Counting house rack hardware purchase - Hovanes, Elliott
    7 KB (1,102 words) - 01:01, 1 April 2015
  • * '''JLab''': Hovanes Egiyan, Mark Ito (chair), David Lawrence, Yi Qiang, Dmitry Romanov, Elton S
    6 KB (853 words) - 13:36, 31 March 2015
  • * Equipment order status - Mark, Hovanes * Setting up in EEL 126 - Hovanes
    3 KB (572 words) - 11:03, 31 March 2015
  • ...ed as well to make a backup, at least the master boot record. I used user "hovanes" as the forst user to setup the operating system. The packages that need to
    16 KB (2,684 words) - 21:52, 7 December 2013
  • ...Collaboration-Sep-2011 | Online agenda for GlueX collaboration meeting]] - Hovanes, Sasha ** test stand - Hovanes
    5 KB (869 words) - 18:58, 31 March 2015
  • ** order status - Mark, Hovanes * Controls test stand update - Hovanes
    6 KB (912 words) - 23:41, 31 March 2015
  • * Present: Yi Q., Alex S., Richard J., Barry R., Hovanes E., Eugene C., Ken L., Dan S., and Tim W.
    670 B (97 words) - 12:36, 14 December 2011
  • * Experiment Control Supervisor - Elliott, Hovanes * Controls test stand - Hovanes, Josh
    1 KB (197 words) - 10:28, 31 March 2015
  • * [[Media:Hall d network config.pdf | Networking]] - Hovanes, Elliott ** test stand update - Hovanes
    7 KB (1,105 words) - 06:33, 1 April 2015
  • | G742515 || hallddisc1 || Hovanes Egiyan || Discriminator/scaler tests | H357378 || rocdisc2 || Hovanes Egiyan || Development
    2 KB (212 words) - 10:31, 11 December 2013
  • * Present: Richard J., Ken L., Igor S., Tim W., Alex S., Hovanes E., Eugene C., Yi Q., and Mike D.
    2 KB (234 words) - 08:49, 3 November 2011
  • * Present: Alex S., Tim W., Eugene C., Hovanes E., Yi Q., Igor S., Fridah M., Ivan T., Barry R., Mike D., and Ken L.
    787 B (114 words) - 12:34, 14 November 2011
  • * Select <i>/home/hovanes/css/source</i> as Workspace since the CSS source was unzipped there. ...rt->General->ExistingProjectsIntoWorkspace->Next</b>, select the <i>/home/hovanes/css/source</i> where the source is located using <b>Browse</b> button, and
    12 KB (1,856 words) - 12:16, 13 December 2011
  • * EPICS evaluation - Hovanes ** Test stand update - Hovanes
    6 KB (984 words) - 11:36, 31 March 2015
  • * Experiment Control Supervisor - Vardan, Hovanes, Elliott * EPICS - Nerses, Hovanes, Elliott
    4 KB (634 words) - 11:32, 31 March 2015
  • * Present: Richard J., Igor S., Fridah M., Alex S., Ivan T., Tim W., Hovanes E., Mike D., Dan S., and Curtis M.
    1 KB (225 words) - 11:05, 1 December 2011
  • ** fADC scalers for monitoring each sector &rarr; Hovanes
    6 KB (877 words) - 16:30, 6 September 2019
  • * Equipment orders - Mark, Hovanes * Experiment Control Supervisor - Vardan, Hovanes, Elliott
    4 KB (604 words) - 07:12, 1 April 2015
  • On 12/1/11 20:03 , "Hovanes Egiyan" <hovanes@jlab.org<mailto:hovanes@jlab.org>> wrote: Hovanes Egiyan
    11 KB (1,305 words) - 18:57, 2 December 2011
  • * Networking equipment - Hovanes, Elliott * EPICS evaluation - Hovanes
    6 KB (962 words) - 14:25, 31 March 2015
  • * Experiment Control Supervisor - Vardan, Hovanes, Elliott * EPICS update - Nerses, Hovanes, Elliott
    3 KB (466 words) - 17:54, 31 March 2015
  • * '''JLab''': Eugene Chudakov, Hovanes Egiyan, Gagik Gavalian, Nerses Gevorgyan, Mark Ito (chair), David Lawrence,
    6 KB (902 words) - 11:35, 31 March 2015
  • * Microscope motors (Vanik, Hovanes)
    214 B (26 words) - 09:59, 17 March 2016
  • ...ne needs to issue a command <pre>./AlarmServer -pluginCustomization /home/hovanes/css/products/sns_epics_w_alarm_3.1.5/AlarmServer/alarm_server.ini</pre>. Th ...':'CONFIG','CONFIG':'Test','APPLICATION_ID':'CSS','HOST':'gluon20','USER':'hovanes'}
    13 KB (2,109 words) - 17:48, 7 March 2015
  • ...lldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2084 Online Update] - Hovanes Egiyan
    10 KB (1,216 words) - 12:38, 14 March 2017
  • ...02003/001/Online%20for%20GlueX%20May%202012.pptx Online Progress Report] - Hovanes Egiyan
    10 KB (1,238 words) - 12:38, 14 March 2017
  • * Present: Igor S., Richard J., Alex S., Hovanes E., Ivan T., Franz K., Yi Q., Tim W., and Curtis M.
    772 B (108 words) - 12:39, 14 March 2017
  • * Counting house installation - Hovanes, Elliott * Progress on 12GeV planning lines - David, Hovanes, Elliott
    5 KB (819 words) - 06:22, 1 April 2015
  • #HV controls/EPICS (Hovanes) HV controls (Hovanes)
    2 KB (264 words) - 12:34, 24 January 2012
  • * Present: Igor S., Richard J., Curtis M., Alex S., Hovanes E., Tim W., Ivan T., Yi Q., Barry R., Dan S., Mike D., and Eugene C.
    1 KB (187 words) - 12:57, 23 January 2012
  • * Counting house installation - Hovanes * Scaler readout - Alex, Hovanes
    5 KB (719 words) - 06:20, 1 April 2015
  • #HV controls/EPICS (Hovanes)
    979 B (135 words) - 11:49, 31 January 2012
  • * Counting house status - Hovanes * Experiment Control Supervisor - Vardan, Hovanes, Elliott
    4 KB (608 words) - 23:03, 31 March 2015
  • * Counting house - Hovanes * Scaler design and management - Dave, Hovanes, Elliott
    4 KB (624 words) - 02:24, 1 April 2015
  • * Counting house installation, power, UPS power, fibers, Tagger bldg, etc. - Hovanes, Mark, Elliott * Equipment orders - Mark, Hovanes
    4 KB (703 words) - 11:07, 31 March 2015
  • * Meeting with Accelerator and halls - Hovanes, Elliott * Counting house installation, power, UPS power, etc. - Hovanes, Elliott
    3 KB (549 words) - 10:34, 31 March 2015
  • Participants: Curtis, Naomi, Beni, John, Simon, Lubomir, Hovanes, Eugene, Tim
    4 KB (583 words) - 18:34, 14 March 2012
  • ...D., Elton S., Eugene C., Dan S., Curtis M., Alex S., Brendan P., Mark S., Hovanes E., and Fridah M.
    1 KB (175 words) - 13:11, 29 February 2016
  • * FCC noise specifications - Elliott, Hovanes * Counting house installation - Hovanes, Mark
    3 KB (492 words) - 10:29, 31 March 2015
  • * Hovanes proposes to use <b>gluonxx.jlab.org</b> for the online servers main IP addr * Hovanes proposes to use "roc<b><i>name</i></b>" for the "first" interface which wil
    1 KB (203 words) - 16:20, 29 February 2012
  • ...eon E5606 2.13 GHz || 2 x 4 || 6 TB as RAID 5 (5 TB) || 32 GB || RHEL 6 || Hovanes Egiyan || In EEL 126
    518 B (56 words) - 21:37, 29 February 2012
  • * Counting house - Hovanes * Scalers - Dave, Hovanes, Elliott
    5 KB (820 words) - 11:34, 31 March 2015
  • ##* Hovanes has written some EPICS GUIs to control the 5V and bias lines.
    8 KB (1,161 words) - 00:08, 1 April 2015
  • * Other EPICS - Hovanes, Nerses, Vanik * Counting house installation - Hovanes, Mark
    3 KB (411 words) - 11:25, 31 March 2015
  • * Electronics and noise specs - Hovanes, Elliott * Counting house - Hovanes
    4 KB (701 words) - 02:09, 1 April 2015
  • ''Attending: David, Sasha, Tim, Beni, John D., Yi, John L., Hovanes, Eugene, Elton (JLab); Matt (IU); Christina, Pavlos, George (Athens); Orlan
    5 KB (802 words) - 15:45, 10 April 2012
  • * Present: Richard J., Mike D., Alex S., Tim W., Eugene C., Hovanes E., and Yi Q.
    724 B (95 words) - 10:35, 31 March 2015
  • * Security and access from outside - Elliott, Hovanes * EPICS - Hovanes, Vanik
    4 KB (690 words) - 16:40, 31 March 2015
  • * Counting house - Hovanes * 12GeV planning lines - David, Hovanes, Elliott
    5 KB (800 words) - 03:23, 1 April 2015
  • #* 50um diamond alignment '''~1hr''' (Hovanes) ## <strike>PS collimator scan '''~1hr''' (Hovanes)</strike>
    8 KB (1,100 words) - 12:39, 14 March 2017
  • * EPICS - Hovanes, Vanik * Counting house installation - Hovanes, Mark
    3 KB (530 words) - 10:26, 31 March 2015
  • * Counting house - Hovanes * 12GeV planning lines - David, Hovanes, Elliott
    6 KB (998 words) - 04:56, 1 April 2015
  • * Recent online plans and purchases - Hovanes * Counting House status - Hovanes
    5 KB (869 words) - 05:07, 1 April 2015
  • * EPICS - Hovanes, Vanik * Counting house installation - Hovanes, Mark
    3 KB (557 words) - 11:06, 31 March 2015
  • * Barcode scanner - Elliott, Hovanes * FCC Class B UPS's - Hovanes, Elliott
    4 KB (532 words) - 10:36, 31 March 2015
  • * Barcode scanner - Elliott, Hovanes * EPICS - Hovanes, Vanik
    3 KB (528 words) - 14:14, 31 March 2015
  • ...configuration with CODA-light. A student will be working (with the help of Hovanes) on the controls for the testing set-up.
    4 KB (694 words) - 18:02, 31 March 2015
  • ...//halldweb.jlab.org/JInventory JInventory database and barcode scanners] - Hovanes, Elliott * Counting House status - Hovanes
    4 KB (650 words) - 12:39, 14 March 2017
  • * Barcode scanner - Hovanes, Elliott * EPICS - Hovanes, Vanik
    2 KB (298 words) - 11:24, 31 March 2015
  • * Intel-based ROC purchase - Dave Abbott, Hovanes, Elliott * Plans for Tagger area - Hovanes
    4 KB (652 words) - 05:07, 1 April 2015
  • * Barcode scanner - Hovanes, Elliott * EPICS - Hovanes, Vanik
    2 KB (388 words) - 11:35, 31 March 2015
  • Hovanes.
    6 KB (1,086 words) - 11:15, 4 September 2012
  • * [http://halldweb.jlab.org/JInventory JInventory] - Josh, Hovanes, Elliott * Controls hardware purchases - Josh, Hovanes
    4 KB (594 words) - 10:50, 31 March 2015
  • * Intel-based ROC purchase - Dave Abbott, Hovanes, Elliott * Counting House status - Hovanes
    6 KB (974 words) - 02:55, 1 April 2015
  • * Hardware purchase status - Josh, Hovanes * EPICS - Hovanes, Vanik
    5 KB (789 words) - 16:29, 31 March 2015
  • * [https://halldweb.jlab.org/JInventory JInventory database] - Elliott, Hovanes * Counting House status - Hovanes
    4 KB (624 words) - 05:48, 1 April 2015
  • | 269 || Hovanes Egiyan || Additional ECL output card. In the test setup | 350 || Hovanes Egiyan || Additional ECL output card. In the test setup
    336 B (40 words) - 10:47, 2 August 2012
  • * Hardware purchase status - Josh, Hovanes * EPICS - Hovanes, Vanik
    4 KB (688 words) - 14:52, 31 March 2015
  • * [https://halldweb.jlab.org/JInventory JInventory database] - Elliott, Hovanes * Counting House status - Hovanes
    6 KB (1,021 words) - 02:07, 1 April 2015
  • * Present: Franz K., Hovanes E., Yi Q., Richard J., James M., Fridah M., Eugene C., Tim W., Igor S., and # Voltage control for bias supply to microscope -- ''Hovanes''
    1 KB (204 words) - 11:48, 20 August 2012
  • * Hardware purchase status - Josh, Hovanes * EPICS - Hovanes
    2 KB (320 words) - 10:34, 31 March 2015
  • * Hardware purchase status - Josh, Hovanes * EPICS - Hovanes
    2 KB (335 words) - 10:29, 31 March 2015
  • * Counting House status - Hovanes * EPICS - Hovanes
    1 KB (230 words) - 11:36, 31 March 2015
  • * Fiber contract and cost - Hovanes, Elliott * Counting House status - Hovanes
    4 KB (611 words) - 06:22, 1 April 2015
  • * Present: Richard J., James M., Barry , Yi Q., Igor S, Hovanes E., Alex S., Tim W., Franz K., Dan S., Eugene C., and Mike D. # Steps toward a tagger magnet mapping plan - ''Hovanes'', ''Alex''
    864 B (110 words) - 13:16, 18 February 2013
  • * Hardware purchase status - Josh, Hovanes * EPICS - Hovanes
    2 KB (351 words) - 17:12, 24 February 2017
  • ...e M., Eugene C., Alex D., Alex S., Alex B., Sebastian C., Baalouch M., and Hovanes E.
    1 KB (185 words) - 14:17, 6 November 2017
  • ...re D., Eugene C., Alex D., Sebastian C., Baalouch M., Michael D., Alex B., Hovanes E., Alex S., Justin S., and Tim W.
    1 KB (190 words) - 09:29, 21 November 2017
  • * FDC/CDC voltage controls (Hovanes, Nick)
    317 B (41 words) - 10:49, 9 November 2017
  • - FDC threshold upgrade is done: all mods, cables installed; Hovanes finished the control system. Has to be tested, best with DAQ and software t ...than the FDC negative ones. Replacing one module didn't help, decided with Hovanes and Fernando to replace the whole mainframe.
    2 KB (386 words) - 12:54, 30 November 2017
  • * Hardware purchase status - Josh, Hovanes * EPICS - Hovanes
    3 KB (385 words) - 16:54, 24 February 2017
  • * [[media:Subnets_in_HallD_v1.pdf | Networks in Hall D]] - Hovanes, Elliott * Counting House status - Hovanes
    4 KB (585 words) - 18:17, 31 March 2015
  • * FCAL voltages (Hovanes) * Status of scalers from JLab VME boards (Hovanes, Paul)
    318 B (43 words) - 23:17, 9 December 2015
  • * Counting House status - Hovanes, Elliott * EPICS - Hovanes
    4 KB (620 words) - 22:03, 31 March 2015
  • * Present: Richard J., James M., Yi Q., Alex S., Hovanes E., Curtis M., Franz K., and Dan S.
    1 KB (160 words) - 12:25, 14 November 2012
  • * Counting house - HOvanes, Elliott * Hardware purchase status - Josh, Hovanes
    1 KB (171 words) - 11:25, 31 March 2015
  • * Counting House status - Hovanes, Elliott * EPICS - Hovanes
    4 KB (697 words) - 02:51, 1 April 2015
  • # Patch panel cables from inside cave to outside - ''Hovanes''
    776 B (108 words) - 12:45, 10 December 2012
  • * EPICS - Hovanes * Controls - Elliott, Hovanes
    2 KB (340 words) - 06:33, 1 April 2015
  • * Counting House furniture - Hovanes * EPICS - Hovanes
    4 KB (649 words) - 06:20, 1 April 2015
  • * Hovanes Egiyan (Hall D Staff)
    5 KB (602 words) - 20:27, 1 March 2013
  • ....org/doc-private/DocDB/ShowDocument?docid=2217 Counting House and EPICS] - Hovanes Egiyan
    9 KB (1,108 words) - 12:38, 14 March 2017
  • ...web.jlab.org/doc-private/DocDB/ShowDocument?docid=2406 Controls Update] -- Hovanes Egiyan
    10 KB (1,265 words) - 12:39, 14 March 2017
  • ...lab.org/doc-private/DocDB/ShowDocument?docid=2334 EPICS Progress Report] - Hovanes Egiyan
    10 KB (1,327 words) - 12:38, 14 March 2017
  • # Hovanes has been working with us to develop a spec for the bias supply controls for
    3 KB (577 words) - 12:43, 23 January 2013
  • * Counting House computer purchase update - Hovanes, Elliott * EPICS update - Hovanes
    2 KB (280 words) - 11:09, 31 March 2015
  • * Present: Richard J., Alex B., Brendan P., James M., Tim W., Alex S., Hovanes E., Yi Q., Ivan T., Franz K., Dan S., Mike D., and Igor S.
    1 KB (146 words) - 10:29, 18 February 2013
  • * Saga of the EPICS archiver - Hovanes, Elliott, Graham * Experience with Elog - Elliott, Hovanes, Graham
    3 KB (525 words) - 13:15, 31 March 2015
  • * Jefferson Lab: Theo Larrieu, Alexander Somov, Igor Senderovich, Hovanes Egiyan, Pete Francis, John Musson, Trent Allison, Brian Bevins, Scott Higgi
    5 KB (802 words) - 11:35, 8 February 2013
  • **** 11:00 (20) --- Counting House Installation Status - Hovanes * Rebaseline - Hovanes, Dave L, Elliott
    4 KB (638 words) - 01:06, 1 April 2015
  • JLab: Hovanes, Elliott, Tim, Mark, John, Dan, Elton
    3 KB (474 words) - 17:12, 24 February 2017
  • ** [[Hovanes' proposal for crate naming]] * Rebaseline status - Hovanes, Dave L, Elliott
    4 KB (663 words) - 05:23, 1 April 2015
  • *** A few developed by Hovanes, Nerses, Vanik and Beni.
    6 KB (700 words) - 13:19, 19 March 2013
  • * Counting House computer system - Hovanes, Elliott * EPICS archiver update - Hovanes
    4 KB (647 words) - 10:59, 31 March 2015
  • * Rebaseline status - Hovanes, Dave L, Elliott * Counting House installation update - Hovanes, Elliott
    6 KB (1,037 words) - 06:07, 1 April 2015
  • * Counting House update - Hovanes, Elliott * EPICS update - Hovanes
    5 KB (725 words) - 07:07, 1 April 2015
  • ...ent: Richard J., Alex B., James M., Brendan P., Curtis M., Mike M., Yi Q., Hovanes E., Sascha S., Tim W., Dan S., Franz K., and Barry R.
    1 KB (140 words) - 16:48, 24 February 2017
  • * Counting House status - Hovanes, Elliott * EPICS update - Hovanes
    5 KB (798 words) - 11:12, 31 March 2015
  • * Counting House update - Hovanes, Elliott * EPICS update - Hovanes
    4 KB (589 words) - 06:10, 1 April 2015
  • * Counting House status - Hovanes, Elliott * EPICS update - Hovanes
    1 KB (149 words) - 23:09, 31 March 2015
  • ** Total maximum power consumed by motor controls, location in the hall (Hovanes) ** Total maximum power consumed by network switches, location in the hall (Hovanes)
    3 KB (414 words) - 10:05, 27 January 2014
  • * Goniometer switch positions (Hovanes) * [[media:ForFall2016_May12.xlsx | Items for the next fall]] (Hovanes)
    354 B (42 words) - 08:54, 12 May 2016
  • * Counting House status - Hovanes, Elliott * EPICS update - Hovanes
    2 KB (356 words) - 10:53, 31 March 2015
  • * Counting House update - Hovanes, Elliott * EPICS update - Hovanes
    2 KB (220 words) - 05:23, 1 April 2015
  • #* Pulsing system (Hovanes Egiyan) #* Pulsing system (Hovanes Egiyan)
    4 KB (647 words) - 13:14, 14 May 2013
  • | 7/22/2013 01:00-07:00 || Yi Q. || Hovanes E. || Standby | 7/23/2013 13:00-19:00 || Hovanes E. || Shaun K. || Rollover
    564 B (63 words) - 11:19, 19 July 2013
  • * Counting House update - Hovanes, Elliott * EPICS update - Hovanes
    4 KB (560 words) - 07:10, 1 April 2015
  • * Counting House update - Hovanes, Elliott * EPICS update - Hovanes
    3 KB (534 words) - 06:45, 1 April 2015
  • * EPICS - Hovanes, Nerses, Elliott * Counting House status - Hovanes, Elliott
    3 KB (531 words) - 11:08, 31 March 2015
  • Present: JLab (Tim, Elliott, Beni, Hovanes, Fernando, Mark, Lubomir); UConn (Jim); Regina (George); CMU (Curtis, Naomi
    4 KB (541 words) - 20:36, 31 March 2015
  • * EPICS Update - Hovanes
    725 B (93 words) - 11:01, 31 March 2015
  • ...group. Previously Mark made stab at a benchmark, prompted by an email from Hovanes and based on the numbers we presented at last year's software review, but i
    4 KB (680 words) - 17:22, 31 March 2015
  • * Counting House update - Hovanes, Elliott * EPICS update - Hovanes
    5 KB (726 words) - 06:05, 1 April 2015
  • * EPICS - Hovanes, Nerses * Counting House status - Hovanes
    4 KB (669 words) - 10:26, 31 March 2015
  • * Counting House update - Hovanes * EPICS update - Hovanes
    5 KB (742 words) - 02:09, 1 April 2015
  • ...eeded for the planned alignment method are being used. He is working with Hovanes on implementing an online procedure using EPICS scalar data, where the micr
    9 KB (1,361 words) - 17:11, 24 February 2017
  • ...tis M., Beni Z., Tim W., Todd S., Natalie W., Samara M., Kyle B., Nate D., Hovanes E., Eugene C., and Dan S. ..._halld_plans.pdf | Injector RF signal for the tagger hall and Hall D]] - ''Hovanes''
    901 B (129 words) - 16:51, 24 February 2017
  • * EPICS - Hovanes, Nerses * Counting House status - Hovanes
    2 KB (304 words) - 10:50, 31 March 2015
  • #* Elton and Hovanes have found project activities that can be used to support Orlando if he com
    3 KB (487 words) - 16:51, 24 February 2017
  • * Counting House update - Hovanes * EPICS update - Hovanes
    2 KB (263 words) - 01:01, 1 April 2015
  • ...set points on the bases are not reinitialized on soft reset. Working with Hovanes to add bits to EPICS archiver to check the set vs read back.
    8 KB (1,246 words) - 13:57, 7 April 2016
  • * EPICS - Hovanes, Nerses * Counting House status - Hovanes
    789 B (102 words) - 21:02, 31 March 2015
  • Installation Meeting - Present: CMU, JLab, IU, Regina, FSU; JLab: Fernando, Hovanes, Eugene, Tim, Elliot, Mark; CMU: Curtis, Naomi; Regina: Zisis; FSU: Sasha Counting House [Hovanes]: Counting house ready to use, but computers for event building and level3
    5 KB (765 words) - 07:03, 1 April 2015
  • Present: Curtis, Naomi, Beni, Lubomir, Simon, Cody, David, Hovanes ##Hovanes gave a [[media:FDC_CDC_HV_LV.pdf | presentation]] on the HV and LV control
    2 KB (291 words) - 10:30, 27 September 2013
  • * Present: Hovanes E., Yi Q., Ivan T., Ann Marie C., Richard J., Alex B., Brendan P., Mike D., # Discussion of target, other than diamond - ''Hovanes''
    881 B (120 words) - 17:05, 24 February 2017
  • * ROC and crate IP naming scheme - Hovanes * EPICS update - Hovanes, Nerses, Vanik
    6 KB (964 words) - 17:51, 31 March 2015
  • ...P., Dan S., Michael D., Alex B., Alex S., Nathan S., Hovanes E., Franz K., Hovanes E., Alexandre D., and Eugene C.
    1 KB (177 words) - 12:34, 7 December 2015
  • ...nt: Alex B., Richard J., Curtis M., Alex S., Natalie W., Tim W., Franz K., Hovanes E., Nathan S., Ivan T., Fernando B.,Mike D., Dan S. * Hovanes will speak with Hall B engineers about obtaining the amorphous targets they
    1 KB (181 words) - 17:14, 24 February 2017
  • * '''JLab''': Mark Dalton, Hovanes Egiyan, Mark Ito (chair), David Lawrence, Simon Taylor, Elliott Wolin, Beni
    7 KB (1,148 words) - 17:05, 24 February 2017
  • * EPICS update - Hovanes, Nerses, Vanik Present: Elliott W, Dave B, Hovanes E, Mark S.
    2 KB (282 words) - 10:39, 31 March 2015
  • * [[media:VXS_crate_fan_speed_2.pdf | VXS crate fan speed]] (Hovanes) * Scalers from JLab VME boards (Hovanes, Paul)
    413 B (55 words) - 10:49, 7 January 2016
  • * Telecom fiber installation status - Hovanes, Dave L, Mark D, Elliott * EPICS update - Hovanes, Nerses, Vanik
    6 KB (929 words) - 02:24, 1 April 2015
  • ...is set to raise a warning if the available space drops below a few TB (ask Hovanes for exact number)
    25 KB (4,058 words) - 20:52, 16 October 2019
  • ...ichard J., Alex B., Ann Marie C., Brendan P., Alex S., Natalie W., Ken L., Hovanes E., Ivan T., Bill C., Yi Q., and Eugene C. # Status of amorphous radiators - ''Hovanes''
    960 B (139 words) - 17:13, 24 February 2017
  • * Telecom fiber installation status - Hovanes, Elliott * EPICS update - Hovanes, Nerses, Vanik
    4 KB (703 words) - 06:58, 1 April 2015
  • '''Canceled since no one was around except Hovanes and Elliott''' ...Motion_Control_Applications#Collimator_table | Collimator table wiring]] - Hovanes, Mark S
    857 B (116 words) - 22:03, 31 March 2015
  • ## Goniometer commissioning at 12 GeV (Hovanes/Paul/Ken) ## Establish absolute photon flux with PS (Sacha) and with TAC (Hovanes)
    22 KB (3,414 words) - 16:27, 26 November 2018
  • Hovanes (Counting House): work in counting house is slowed by RedHat licensing. Op
    5 KB (818 words) - 06:26, 1 April 2015
  • ...ter that will be on the platform "joebesser". As for the LV and HV system, Hovanes will be working on them; the systems are supposed to be ready but have not
    5 KB (800 words) - 06:05, 1 April 2015
  • ...Motion_Control_Applications#Collimator_table | Collimator table wiring]] - Hovanes, Mark S * EPICS update - Hovanes, Vanik
    3 KB (452 words) - 10:55, 31 March 2015
  • # Calibration-Monitoring - Hovanes Egiyan
    687 B (98 words) - 10:20, 14 November 2013
  • # Calibration-Monitoring - Hovanes Egiyan
    1 KB (174 words) - 17:12, 24 February 2017
  • * Telecom fiber installation status - Hovanes, Elliott * Terminal servers - Serguei P, Hovanes, Elliott
    6 KB (988 words) - 01:13, 1 April 2015
  • Participants: Bill, Dave, Nick, Chris, Simon, Vlad, Beni, Elton, Hovanes (for the LV control discussions) and Lubomir. ...e have to change the LV module configuration and this requires ioc reboot, Hovanes gave us (at least temporary) privileges to do this.
    4 KB (763 words) - 00:48, 1 April 2015
  • ...e L, Mark I, Elton S, Graham H, Sean D, Justin S, Eugene C, Yi Q, Simon T, Hovanes E, Serguei P, Mark D, Beni Z, Dave A, Vanik K.
    9 KB (1,461 words) - 17:13, 24 February 2017
  • * Present: Alex B., Ann Marie C., Brendan P., Richard J., James M., Hovanes E., Nathan S., Tim W., Todd S., Elton S., Dave M., Bill C., Ivan T., Natali
    1 KB (170 words) - 17:06, 24 February 2017
  • * Terminal servers and ROC setup - Bryan, Hovanes, Mark D * What should we use as the standard GCC compiler for the online cluster? - Hovanes, Dave L, Elliott
    7 KB (1,064 words) - 06:33, 1 April 2015
  • Counting House Infrastructure: (Hovanes) nothing new to report Control: (Elliott) Dave Butler continues to work on control system. (Hovanes) Controls will be ready for BCAL when it is ready to be powered.
    4 KB (683 words) - 11:35, 31 March 2015
  • ...Motion_Control_Applications#Collimator_table | Collimator table wiring]] - Hovanes, Mark S * Other EPICS progress - Hovanes
    3 KB (504 words) - 11:27, 31 March 2015
  • ...C., Yi Q., Bill C., Ivan T., Dan S., Franz K., Mike D., Tim W., Nathan S., Hovanes E., and Natalie W.
    1 KB (197 words) - 17:12, 24 February 2017
  • ...B/ShowDocument?docid=3016 Diamond alignment and beam stability controls] - Hovanes Egiyan
    10 KB (1,283 words) - 12:38, 14 March 2017
  • ....org/doc-private/DocDB/ShowDocument?docid=2467 Slow Controls Progress] --- Hovanes Egiyan
    10 KB (1,231 words) - 12:38, 14 March 2017
  • * Online database and web machines - Hovanes, Dave L, Elliott * EPICS update - Hovanes
    2 KB (324 words) - 01:13, 1 April 2015
  • ...t. Details, how to do this, were discussed at another meeting organized by Hovanes right after the FDC meeting.
    7 KB (1,144 words) - 01:06, 1 April 2015
  • Attendees: ''David L.(chair), Sascha S., Hovanes E., Mark D., Beni Z., Graham H., Dave A., Dmitry R., Mark I., Bryan M., Cur * Add a Controls talk by Hovanes
    4 KB (697 words) - 01:50, 1 April 2015
  • * UPS requirements for controls in Hall D (Dave, Yi, Hovanes) * GlueX collaboration meeting (Hovanes)
    3 KB (499 words) - 12:07, 10 February 2014
  • Mark raised the question that Hovanes has posed to the groups about whether there are any special considerations
    4 KB (623 words) - 18:17, 31 March 2015
  • ...will be copied into EPICS variables and alarms placed on those. (Mark and Hovanes will take care of these)
    3 KB (382 words) - 04:01, 1 April 2015
  • ...L.(chair), Sergey F., Graham H., Eugene C., Chris C., Sean D., Justin S., Hovanes E., Alex S., Sergey P.'' * Hovanes noted that the "Checkout Trigger" activity needs steps added in the project
    3 KB (434 words) - 02:55, 1 April 2015
  • ...ere the LV crate is. As for the MPOD controller settings Dave will talk to Hovanes.
    6 KB (1,133 words) - 06:58, 1 April 2015
  • ...esent: Richard J., Brendan P., Alex B., Alex S., Dan S., Kei M., Franz K., Hovanes E., Tim W., Eugene C, and Curtis M. ...rg/doc-private/DocDB/ShowDocument?docid=2889 Upgrades for BPU readout] - ''Hovanes E.''
    1 KB (183 words) - 17:00, 24 February 2017
  • ...upply, so maybe tomorrow we will be able to test the fast shut down. First Hovanes will try it on a different crate. Dave received the flow sensor for the chi
    4 KB (708 words) - 06:58, 1 April 2015
  • * Present: Richard J., Alex B., Brendan P, Ann Marie C., Alex S., Yi Q., Hovanes E., Curtis M., Dan S., Mike D., and Nathan S.
    943 B (139 words) - 17:00, 24 February 2017
  • * FDC power supply interlock status (Hovanes, Dave) ...ream platform since currently there no PLC in U1-5 and there are no plans. Hovanes will need to move it in his PDF file as well.
    3 KB (544 words) - 09:37, 20 March 2014
  • - The fast shut-down of the LV is now working thanks to Dave and Hovanes! (forgot to mention this at the meeting).
    4 KB (725 words) - 06:05, 1 April 2015
  • Attendees: ''David L. (chair), Hovanes E., Eugene C., Vardan G., Graham H., Bryan M., Mark I., Yi Q., Dave A., Ser ** Hovanes: will use the FCAL darkroom as an example to start prototyping
    4 KB (592 words) - 05:48, 1 April 2015
  • #* Halo Linearity scan (Hovanes) #* Halo Linearity scan (Hovanes)
    7 KB (1,008 words) - 08:43, 18 April 2016
  • ...P., Franz K., Dan S., Michael D., Mark D., Alex B., Nathan S., Eugene C., Hovanes E., Alex S., Justin S., Sascha S., and Curtis M.
    1 KB (193 words) - 12:38, 14 March 2017
  • * [[media:UPSforHallDreqs.pptx | UPS requirements for Hall D]] (Dave, Yi, Hovanes) * Radiator insertion stage test (Hovanes, Yi)
    4 KB (679 words) - 08:54, 2 April 2014
  • Attendees: ''David L.(chair), Simon T., Chris C., Beni Z., Sergey P., Hovanes E., Curtis M., Sean D., Graham H., Dave A., Mark D., Dmitry R., Vardan G.,
    5 KB (860 words) - 17:00, 24 February 2017
  • ...S., Alex D., Tim W., Natalie W., Nathan S., Elton S., Bill C., Jarrod F., Hovanes E., and Mike D.
    1 KB (194 words) - 17:12, 24 February 2017
  • * Warm magnet ramping procedures (Hovanes, Mark) * Missing controls for detector voltages (Hovanes)
    5 KB (794 words) - 22:48, 21 January 2015
  • * Radiator insertion stage test (Hovanes, Yi) Present: Dave, Mark S., Scot, Orlando, Hovanes, Elton, Nerses
    3 KB (527 words) - 11:36, 10 April 2014
  • ...i Z., Nerses G., Verdan G., Sean D., Sergey P., Dave A., Alex S., Mark D., Hovanes E., Dmitry R. ** This slipped through the cracks (Fernando's group and Hovanes thought the other was doing it)
    4 KB (536 words) - 06:26, 1 April 2015
  • Present: Nerses, Orlando, Elton, Dave B., Hovanes, Scot, Mark S., Mike, Beni * Hovanes needs some input on the archiving voltages, in particular the deadbands for
    2 KB (330 words) - 16:23, 30 April 2014
  • David L., Bryan M., Sergey F., Simon T., Alex S., HOvanes E., Dmitry R., Beni Z., Vanik, Serguei P., Curtis M., Eugene C., Mark I., M
    4 KB (652 words) - 06:29, 1 April 2015
  • ...us of motor applications 05/01/2014| Status of motor applications]] (Scot, Hovanes)
    617 B (78 words) - 09:36, 1 May 2014
  • ...know what EPICS PVs (or PLC tags) need to be archived and the deadband and Hovanes requests archiving using [http://devweb.acc.jlab.org/controls_web/cjs/reque ** Hovanes keeps track of what is in each Hall D archiving group in text file in SVN a
    3 KB (432 words) - 09:25, 29 May 2014
  • * [[EPICS archiving with MYA]] (Hovanes)
    420 B (57 words) - 09:42, 29 May 2014
  • ...d about the the control system for the bias voltages. Mark will check with Hovanes Egiyan on the status.
    4 KB (715 words) - 07:03, 1 April 2015
  • *#* We need to ask Hovanes Egiyan about the status of these scalers.
    4 KB (672 words) - 00:30, 1 April 2015
  • * Mark spoke to Hovanes Egiyan about plans for bias voltage control. A GUI will be available in Aug
    5 KB (787 words) - 20:23, 31 March 2015
  • ''n.b. Since the meeting, Hovanes has added these to the repository here: * Hovanes and Vanik have successfully tested the controls for the collimator table mo
    4 KB (616 words) - 20:23, 31 March 2015
  • ### Controls [Hovanes]
    3 KB (355 words) - 06:10, 1 April 2015
  • ...lldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2522 Slow Controls] - Hovanes Egiyan
    2 KB (196 words) - 16:51, 24 February 2017
  • * EPICS/PLC interface (Hovanes)
    618 B (82 words) - 12:40, 14 March 2017
  • ''David L., Sergey F., Sasha S., Graham H., Carl T., Beni Z., Vardan G., Hovanes E., Sean D., Mark D.''
    3 KB (439 words) - 00:48, 1 April 2015
  • ...tore them correctly, or issue an alarm. This has to be discussed also with Hovanes.
    5 KB (869 words) - 05:58, 1 April 2015
  • * <strike> Check that radiator set for commissioning is available (Alexandre, Hovanes) </strike> Material for 2x10^-4 available, Alexandre will order the 1x10^-4 ''Attending:'' Elton, Alexandre, Hovanes, Eugene, Sasha (Hall D); Todd, Michael (Accelerator)
    4 KB (571 words) - 17:22, 31 March 2015
  • ...parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Alexandre for Hall D) ''Attending: Elton, Alexandre, Hovanes, Eugene, Sasha (Hall D), Mike (Ops); Curtis (CMU); Richard (UConn)
    5 KB (659 words) - 06:20, 1 April 2015
  • ...to re-boot the IOC which is now an expert task. Please send Hovanes email (hovanes@jlab.org) if you need to have this done. ...mentary user interface at present; integration with EPICS will be left for Hovanes. Paul has asked Brad to write a program to use Sascha O.'s existing scalar
    7 KB (622 words) - 00:14, 1 April 2015
  • ##* Hovanes is working on the voltage readout with EPICs. He how has all the necessary
    6 KB (898 words) - 01:13, 1 April 2015
  • ...parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D) ...e) </strike> Alexandre talked to Tim about designing the necessary stands. Hovanes will order cables that can reach the end of the collimator hut.
    3 KB (408 words) - 06:33, 1 April 2015
  • * Problem with the BCAL interlocks (Hovanes) * [[media:ioc_status_rebooting.pdf | IOC status and rebooting]] (Hovanes)
    403 B (56 words) - 09:28, 24 July 2014
  • * Present: Richard J., Brendan P., Alex B., James M., Franz K., Yi Q., Hovanes E., Tim W., Eugene C., Natalie W., Alex D., and Michael D.
    1 KB (182 words) - 17:13, 24 February 2017
  • * Problem with the BCAL interlocks (Hovanes)
    409 B (51 words) - 09:36, 12 August 2014
  • ...parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D) ''Attending: Elton, Alexandre, Hovanes, Eugene (Hall D); Pavel, George (RadCon); Todd (CASA); Michael (Operations)
    6 KB (887 words) - 06:22, 1 April 2015
  • ''Attending: Javier Gomez (Physics); Elton Smith, Alexandre Deur, Hovanes Egiyan, Eugene Chudakov (Hall D); Richard Jones (GlueX); George, Pavel Degt
    2 KB (297 words) - 18:31, 8 August 2014
  • ##* Working with Hovanes to integrate the monitoring into the GlueX slow controls system.
    5 KB (805 words) - 06:53, 15 August 2014
  • ...parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D) * Hovanes is preparing photomultipliers that can be used to measure beam loss along t
    5 KB (749 words) - 09:14, 21 August 2014
  • * Present: Richard J., Alex B., Franz K., Nathan S., Curtis M., Hovanes E., Tim W., Eugene C., Natalie W., Alex D., and Michael D.
    1 KB (146 words) - 12:17, 18 August 2014
  • ....org/doc-private/DocDB/ShowDocument?docid=2557 Slow Controls Progress] --- Hovanes Egiyan
    9 KB (1,171 words) - 12:38, 14 March 2017
  • * [[media:alarm_system_status_21Aug2014.pdf | Alarm System]] (Hovanes)
    311 B (40 words) - 08:34, 21 August 2014
  • ...Moore was working on the epics communication with the device. According to Hovanes he changed the set temperature to a lower value for as short time, then the
    5 KB (831 words) - 03:23, 1 April 2015
  • * <strike> Hovanes is preparing photomultipliers that can be used to measure beam loss along t ''Attending: Elton, Alexandre, Eugene, Hovanes, Tim (Hall D); Pavel (RadCon); Alex Barnes, Richard, James, Brendan (UConn,
    5 KB (724 words) - 18:18, 3 September 2014
  • ...e want to implement in addition an EPICS interlock (discussed already with Hovanes). Later we will need a temperature sensor with a PLS system to interlock th
    4 KB (680 words) - 07:07, 1 April 2015
  • Attendees: Alex S., Bryan M., David L., Simon T., Sergey F., Curtis M., Hovanes E., Dave A., Sergeui P., Beni Z. * Hovanes has been working with Mark Ito on the alarm system.
    5 KB (722 words) - 21:32, 31 March 2015
  • * [[media:FDC_soft_interlock.pdf | FDC EPICS interlock]] (Hovanes) * Pair Spectrometer magnet power supply (Hovanes, Mark S.)
    336 B (44 words) - 09:32, 4 September 2014
  • ''Attending: Elton, Alexandre, Eugene, Hovanes, Tim, Glenn (Hall D); Pavel (RadCon); Richard (UConn); Curtis (CMU); ## Slow controls (Hovanes)
    5 KB (671 words) - 17:59, 10 September 2014
  • #* Hovanes will start developing a screen for Hall D based on the comfort screens from
    3 KB (471 words) - 17:50, 17 September 2014
  • ...utler made the status of the hardware interlock available for epics. Thus, Hovanes is working now on a control window that will have all this information so t
    5 KB (941 words) - 07:10, 1 April 2015
  • ##* Hovanes will update the firmware to the latest version
    7 KB (1,077 words) - 18:12, 25 September 2014
  • ...[[media:Gluex_overview_draft.jpg | Screen of beam parameters for Hall D]] (Hovanes) </strike> * <strike> List of variables from radiation monitors to Pavel (Hovanes and Alexandre) </strike>
    5 KB (811 words) - 06:42, 9 October 2014
  • * Screen of beam parameters for Hall D (Hovanes) ''Attending: Elton, Alexandre, Hovanes, Tim, Eugene, Nathan (Hall D); Michael (Ops); Curtis (CMU); Richard (UConn)
    3 KB (388 words) - 17:50, 24 September 2014
  • ...dweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2643 Slow Controls] -- Hovanes Egiyan
    9 KB (1,130 words) - 12:38, 14 March 2017
  • ...web.jlab.org/doc-private/DocDB/ShowDocument?docid=2834 Control Status] --- Hovanes Egiyan
    10 KB (1,251 words) - 12:40, 14 March 2017
  • "Attending: Elton, Beni, Alexandre, Hovanes, Eugene (Hall D); Todd (CASA); Pavel (RadCon); Curtis (CMU); Richard (UConn ...eed to take baseline rates of profile monitor before commissioning starts. Hovanes will do this.
    4 KB (648 words) - 10:48, 17 October 2014
  • ##* Mark volunteered to meet with Hovanes and Manuel to try to isolate this problem. ...e BCAL. Considering changing the variable names, but needs to consult with Hovanes. Output of arrays for the rates is also problematic as north and south rate
    6 KB (982 words) - 06:35, 1 April 2015
  • * [[Rules for beam operations | Beam Operations ]](Hovanes) ** Hovanes will carry the slow controls phone for these three weeks.
    464 B (63 words) - 08:37, 16 October 2014
  • * Hovanes needs to be notified prior to any changes to equipment or software that inv
    1 KB (169 words) - 08:33, 16 October 2014
  • #* [[media:ControlRoomConsoles.pdf | Proposal for console assignments]] (Hovanes) ...avid L. (chair), Dave A., Will M., Michael S., Curtis M., Justin, Sean D., Hovanes, Mark D., Alex. S., Sergeui P., Aristeides T.
    3 KB (374 words) - 06:29, 1 April 2015
  • - Lubomir will discuss with Hovanes possibilities for powering off the chiller in case of a failure like this u
    4 KB (628 words) - 00:14, 1 April 2015
  • - Lubomir will discuss with Hovanes possibilities for powering off the chiller in case of a failure like this u
    4 KB (657 words) - 20:36, 31 March 2015
  • ...that the NIM electronics can be cleaned up. If needed we can get help from Hovanes and Ben on the programming of the VME logic board. ##* Will work with Fernando and Hovanes to understand source and attempt fixes in January.
    6 KB (893 words) - 14:39, 18 December 2014
  • * Present: Richard J., Brendan P., Alex B., Eugene C., James M., Elton S., Hovanes E., Alex S., Michael D., Nathan S., and Kei M.
    885 B (127 words) - 12:59, 22 December 2014
  • #<strike><span style="color:red"> Controls </span> (Hovanes) </strike> ...="color:red"> Include Status and Controls on the general EPICS GUI</span> (Hovanes)
    16 KB (2,495 words) - 10:00, 19 March 2015
  • # Work with Hovanes to activate VME LED pulser setup for FCAL (Elton)
    6 KB (1,010 words) - 12:47, 26 March 2015
  • * Summary of the meeting on target controls (Hovanes) * Motor for polarimeter (Hovanes, Scot)
    331 B (42 words) - 22:48, 21 January 2015
  • ...Alex S., Michael D., Tim W., Alex D., Nathan S., Eugene C., Franz K., and Hovanes E.
    1 KB (210 words) - 12:38, 14 March 2017
  • * Motors for TAC, polarimeter, profiler (Hovanes, Scot) * FCAL voltage controls progress (Hovanes)
    374 B (48 words) - 18:11, 4 February 2015
  • ...erminal server, but then we need software to put the information in epics (Hovanes).
    4 KB (588 words) - 04:15, 1 April 2015
  • * All speakers except Hovanes were present and indicated agreement with their time slot
    3 KB (531 words) - 06:45, 1 April 2015
  • ...ols will be completed this week. These incorporates changes discussed with Hovanes for good interface to EPICS. The EPICS GUIs will allow entire strands to be
    6 KB (960 words) - 13:49, 12 February 2015
  • ...with information on where to apply these changes. Elton needs to meet with Hovanes to discuss implementing the new changes. In the meantime, the NIM pulser se
    7 KB (1,103 words) - 14:54, 26 February 2015
  • # Work with Hovanes to activate VME LED pulser setup for FCAL (Elton) ##* Manuel and Hovanes are trying to find the root cause of the reboots.
    8 KB (1,197 words) - 12:39, 14 March 2017
  • ...even the interlock should have prevented the box from turning on. Dave and Hovanes will look into this.
    4 KB (731 words) - 17:06, 2 April 2015
  • ...te: Currently the system still works using the associated NIM electronics. Hovanes has suggested that we delay the new programing till after this run so as no
    6 KB (912 words) - 18:39, 9 April 2015
  • ....jlab.org/doc-private/DocDB/ShowDocument?docid=2714 Controls Status] --- ''Hovanes Egiyan''
    9 KB (1,156 words) - 12:38, 14 March 2017
  • * Polarimeter controls (Hovanes, Scot) * FDC Chiller interlock (Dave, Hovanes)
    520 B (67 words) - 09:11, 2 April 2015
  • # Work with Hovanes to activate VME LED pulser setup for FCAL (Elton). Postpone till mid May, a
    6 KB (848 words) - 16:55, 24 February 2017
  • # <strike> Work with Hovanes to activate VME LED pulser setup for FCAL (Elton). Postpone till mid May, a
    6 KB (991 words) - 18:09, 7 May 2015
  • # <strike> Work with Hovanes to activate VME LED pulser setup for FCAL (Elton). </strike> Orlando has go ##* Hovanes has updated the EPICs IOCs to turn off bases that read above some max volta
    7 KB (1,077 words) - 17:12, 24 February 2017
  • * VME scaler readout in EPICS (Hovanes, Paul)
    243 B (33 words) - 10:03, 14 May 2015
  • ...., Michael D., Kei M., Alexandre D., Alex B., Franz K., Alex S., Elton S., Hovanes E., and Nathan S.
    1 KB (155 words) - 12:05, 26 May 2015
  • * FCAL Voltages (Hovanes) * PLC Heartbeat Alarms (Hovanes, Dave)
    320 B (41 words) - 08:06, 28 May 2015
  • ##* Scripts are ready by need testing. Hovanes has found one bug and testing continues before final implementation.
    5 KB (736 words) - 21:40, 2 July 2015
  • * Attending: Brian Bevins, Matt Bickley, Eugene Chudakov, Alexandre Deur, Hovanes Egiyan, Richard Jones, Pamela Kjeldsen, Alexander Somov
    274 B (34 words) - 19:34, 12 June 2015
  • * Power outage and restoration experience/problems/solutions (Dave,Hovanes)
    389 B (50 words) - 14:19, 24 June 2015
  • * Power outage and restoration experience/problems/solutions (Mark,Dave,Hovanes) ...rtified/mya/MyaDeadBands.pdf New deadband definitions for EPICS archiver] (Hovanes)
    509 B (68 words) - 14:28, 24 June 2015
  • ...ovanes noted in a [https://logbooks.jlab.org/entry/3344394 logbook entry]. Hovanes was not at the meeting so David will follow up with him later to find the s
    5 KB (794 words) - 15:15, 1 July 2015
  • ...J, Brendan P., Curtis M., Dan S., Kei M., Alex B., Alex S., Eugene C., and Hovanes E.
    1 KB (168 words) - 12:22, 6 July 2015
  • ...ted all firmware and testing on a single strand. Waiting for feedback from Hovanes, which will take about a week.
    8 KB (1,241 words) - 15:24, 16 July 2015
  • ...the FDC chiller was fixed (could not read out the temperature and flow) by Hovanes and the FDC LV and HV were turned on. So far we keep the HV at 2000V, some
    3 KB (513 words) - 18:51, 17 July 2015
  • ##* Hovanes is checking new firmware updates
    7 KB (1,150 words) - 15:29, 30 July 2015
  • ..., Dan S., Kei M., Nathan S., Alex B., Alex S., Alexandre D., Elton S., and Hovanes E. ...ferenceDisplay.py?confId=109 Accelerator StayTreat Agenda] Note updates by Hovanes (Hall D), Trent Allison (Hall D Feedback), among others
    2 KB (251 words) - 12:20, 20 July 2015
  • * Power outage and restoration experience/problems/solutions (Mark,Dave,Hovanes) ...rtified/mya/MyaDeadBands.pdf New deadband definitions for EPICS archiver] (Hovanes)
    529 B (70 words) - 08:25, 23 July 2015
  • ##* Hovanes has given the ok to upload the new base firmware to the bases and Jon has c
    7 KB (974 words) - 17:12, 24 February 2017
  • Attendees: David L. (chair), Simon T., Eric P., Curtis M., Dave A., Beni Z., Hovanes E., Sergey F., Bryan M., Alex S. * Hovanes noted that while the CSS GUIs have been tested on RHEL7, there has been no
    5 KB (843 words) - 14:47, 13 August 2015
  • ##* Hovanes will modify the EPICS interface to check validity of ADC inquiries, which c
    7 KB (1,035 words) - 17:05, 24 February 2017
  • ...esent: Richard J., Michael D., Franz K., Nathan S., Alex B., Alexandre D., Hovanes E., and Eugene C.
    903 B (127 words) - 11:43, 18 August 2015
  • Attendees: David L. (chair), Simon T., Sergey F., Dave A., Hovanes E., Curtis M., Sean D., Vardan G., Alex S., Beni Z., Carl T.
    5 KB (848 words) - 17:13, 24 February 2017
  • * Present: Richard J., Brendan P., Nathan S., Alex B., Alexandre D., Alex S., Hovanes E., Franz K., Dan S., Bill B., and Elton S.
    1 KB (197 words) - 16:51, 24 February 2017
  • * FCAL and PS LED pulsers (Hovanes) * Status of FCAL HV voltage controls (Hovanes)
    416 B (56 words) - 09:28, 17 September 2015
  • * TAC interlock (Hovanes)
    180 B (22 words) - 09:19, 4 February 2016
  • * MO VME board EPICS support (Hovanes)
    198 B (26 words) - 16:23, 14 October 2015
  • ...EPICs; when loosing communication they shut themselves off. Working with Hovanes to investigate this problem.
    7 KB (1,002 words) - 12:39, 14 March 2017
  • * Present: Alex B. Nathan S., Hovanes E., Alexandre D., Curtis M, Richard J., Brendan P., Michael D., Dan S., Fra
    1 KB (193 words) - 12:38, 14 March 2017
  • * [[media:ForFall2016.xlsx | Items for the next fall]] (Hovanes)
    182 B (22 words) - 08:43, 28 April 2016
  • Attendees: David L., Sergey F., Paul L., Hovanes E., Curtis M., Sean D., Beni Z., Simon T., Eugene C. ** Hovanes noted that this can interfere with the Wed. afternoon Accelerator meeting
    5 KB (845 words) - 16:36, 5 May 2016
  • #* No significant discussion here since Hovanes was not present. Sergey suggested we could consider specifying some compute
    6 KB (914 words) - 17:16, 18 May 2016
  • ...iteboard cameras]: installed but still not accessible. Will need help from Hovanes * Hovanes not at meeting to discuss so David will speak with him offline
    5 KB (852 words) - 17:09, 1 June 2016
  • * FDC chiller EPICS interface (Hovanes) * Microscope support motion tests (Hovanes, Vanik)
    344 B (41 words) - 08:59, 23 June 2016
  • ...anaging logs to ensure they don't overwrite disk. (David will discuss with Hovanes et al.)
    4 KB (597 words) - 15:28, 29 June 2016
  • * Microscope support actuator issues (Hovanes) * FDC chiller EPICS control (Hovanes)
    288 B (34 words) - 10:05, 20 July 2016
  • * Microscope support actuator issues (Hovanes) * FDC chiller EPICS control (Hovanes)
    288 B (34 words) - 10:06, 20 July 2016
  • * Present: Eugene, Justin, Alexandre D., Michael D., Curtis, Nathan, Hovanes, Brendan, Alex S., Dan S.
    1 KB (179 words) - 11:54, 5 August 2016
  • * Present: Alex D., Hovanes E., Alex S., Eugene C., Alex B., Nathan S., Justin S., Elton S., Richard J.
    1 KB (191 words) - 11:51, 17 August 2016
  • <!--#*Check bleedthrough level. 10min Hovanes. <font color="red">Hall A or C needs to be running</font>--> #*Once radiation levels are good, proceed with harp scans (Hovanes/Todd. 15 min)
    19 KB (2,918 words) - 16:30, 26 November 2018
  • #*Check bleedthrough level. 10min Hovanes. <font color="red">Hall A needs to be running</font> #*Once radiation levels are good, proceed with harp scans (Hovanes/Todd. 15 min)
    21 KB (3,257 words) - 16:26, 26 November 2018
  • ##* Hovanes has made available a PDU to power the supplies and it is being installed in ...n. The Fcal probably wishes to setup something similar. Adesh will talk to Hovanes to see how best to implement such a scheme.
    8 KB (1,229 words) - 17:00, 24 February 2017
  • * Hovanes and Alex S. will be notified of their slots
    3 KB (473 words) - 09:28, 28 September 2016
  • ...ent: Michael D., Richard J., Franz K., Brendan P., Elton S., Alexandre D., Hovanes E., Nathan S., Eugene C., Tim W., and Curtis M.
    1 KB (176 words) - 11:35, 12 September 2016
  • ...Richard J., Dan S., Brendan P., Alex S., Elton S., Alex B., Alexandre D., Hovanes E., Nathan S., Eugene C., and Curtis M.
    2 KB (226 words) - 17:00, 24 February 2017
  • * Collimator status (Hovanes) * CompCal motors (Hovanes, Tim)
    180 B (21 words) - 09:15, 13 October 2016
  • # Update on goniometer repairs - ''Tim W.'', ''Hovanes E.''
    1 KB (163 words) - 11:36, 24 October 2016
  • # Update on goniometer installation - ''Hovanes E.''
    1 KB (170 words) - 12:50, 7 November 2016
  • * Goniometer status (Hovanes, Tim) * CAEN SY4527 HV chassis for DIRC/COMPCAL (Hovanes)
    332 B (43 words) - 11:55, 9 November 2016
  • # Collimator scans with the new x,y controls - ''Hovanes E.''
    1 KB (172 words) - 12:44, 21 November 2016
  • ...ating an alarm state even when the system was locked out by the interlock. Hovanes has updated the values in EPICS to correspond to the hardware and will now
    6 KB (917 words) - 14:39, 15 December 2016
  • ...rendan P., Dan S., Sascha S., Alex B., Justin S., Thomas B., Alexandre D., Hovanes E., Nathan S., Eugene C., and Curtis M. # Beam spot profile measurements - ''Hovanes E.''
    2 KB (334 words) - 12:34, 19 December 2016
  • ...vate/DocDB/ShowDocument?docid=3234 Diamond alignment and beam stability] - Hovanes Egiyan
    10 KB (1,269 words) - 12:38, 14 March 2017
  • * BCAL alarms in PLC (Hovanes, Nick, Elton) * Goniometer for spring run (Hovanes, Tim)
    484 B (65 words) - 10:10, 19 January 2017
  • * Present: Richard J., Alexandre D., Nathan S., Barry R., Michael D., Tim W., Hovanes E., Dan S., Sascha S., Alex B., Justin S., Eugene C., and Curtis M. # Beam spot profile measurements taken last run - ''Hovanes E.''
    2 KB (296 words) - 14:24, 10 January 2017
  • ...r). Sergey F., Dave A., Carl T., Vardan G., Bryan M., Simon T., Curtis M., Hovanes E., Graham H. * Hovanes pointed out that the problem could be with the controller and not a disk
    4 KB (665 words) - 18:02, 11 January 2017
  • ##* Hovanes planes to add the LED pulser information into the archiver, but this may no
    6 KB (993 words) - 13:22, 26 January 2017
  • * BCAL alarms in PLC (Hovanes, Nick, Elton) * Goniometer for spring run (Hovanes, Tim)
    510 B (70 words) - 10:10, 19 January 2017
  • * Present: Richard J., James M., Dan S., Hovanes E., Alexandre D., Nathan S., Michael D., Thomas B., Tim W., Sascha S., Alex
    1 KB (176 words) - 13:01, 30 January 2017
  • #** Hovanes + Tom: cable running
    10 KB (1,363 words) - 10:23, 15 February 2017
  • * Present: Richard J., Brendan P., Hovanes E., Alexandre D., Nathan S., Alex B., and Eugene C. ...sciencedirect.com/science/article/pii/S0168900211020055 MCB reference that Hovanes promised allegedly showing slightly rotated distributions]
    3 KB (349 words) - 12:40, 14 March 2017
  • #** [https://logbooks.jlab.org/entry/3461097 Analysis of the latest scan] by Hovanes #* Once, the goniometer got stuck moving, and Hovanes had to fix it [https://logbooks.jlab.org/entry/3459894]
    13 KB (1,779 words) - 09:43, 22 February 2017
  • # Brief review of progress with beam conditions during run - ''Hovanes E.''
    2 KB (221 words) - 12:00, 1 March 2017
  • ...s.jlab.org/entry/3464184 Hall D], [https://logbooks.jlab.org/entry/3464277 Hovanes analysis]
    12 KB (1,560 words) - 09:34, 8 March 2017
  • * BCAL PLC not tripping MPODs when down (Nick, Hovanes) * Alarms from BCAL (Nick,Hovanes)
    381 B (53 words) - 08:27, 2 March 2017
  • * Present: Hovanes E., Alexandre D., Eugene C., Richard J., Michael D., Dan S., Brendan P., Na
    2 KB (214 words) - 11:34, 13 March 2017
  • * BCAL PLC not tripping MPODs when down (Nick, Hovanes) * Alarms from BCAL (Nick, Hovanes)
    435 B (57 words) - 23:09, 15 March 2017
  • ...'JLab''': Alex Austregesilo, Thomas Britton, Brad Cannon, Eugene Chudakov, Hovanes Egiyan, Sergey Furletov, Mark Ito (chair), David Lawrence, Paul Mattione, D
    8 KB (1,184 words) - 18:53, 22 March 2017
  • ...Curtis M., Dan S., Alex B., Brendan P., Michael D., Justin S., Nathan S., Hovanes E., Alexandre D., Eugene C., and Sascha S.
    2 KB (213 words) - 12:32, 27 March 2017
  • * Alarms from BCAL (Nick, Hovanes) * Alarms for beamline vacuum (Tim, Hovanes)
    358 B (47 words) - 15:05, 29 March 2017
  • * 10:00 Session IIIb (50) --- Tracking - (Organizer: Naomi Jarvis) - Chair: Hovanes Egiyan
    10 KB (1,300 words) - 12:23, 18 May 2017
  • ...b''': Alex Austregesilo, Amber Boehnlein, Thomas Britton, Eugene Chudakov, Hovanes Egiyan, Sergey Furletov, Mark Ito (chair), David Lawrence, Paul Mattione, D
    5 KB (724 words) - 13:41, 19 April 2017
  • * EPICS alarms from BCAL (Nick, Hovanes) * BCAL chiller naming and labeling (Hovanes,Nick)
    836 B (115 words) - 09:20, 27 April 2017
  • ...stregesilo, Amber Boehnlein, Thomas Britton, Brad Cannon, Eugene Chudakov, Hovanes Egiyan, Sergey Furletov, Mark Ito (chair), David Lawrence, Dmitry Romanov,
    6 KB (898 words) - 12:46, 3 June 2017
  • ...hard J., Micah W., Curtis M., Alexandre D., Baalouch M., Dan S., Elton S., Hovanes E., Michael D., and Ken L.
    1 KB (199 words) - 11:33, 5 June 2017
  • * Collimator survey (Tim, Hovanes)
    266 B (34 words) - 09:08, 8 June 2017
  • * '''JLab''': Thomas Britton, Brad Cannon, Eugene Chudakov, Hovanes Egiyan, Mark Ito (chair), Dmitry Romanov, Beni Zihlmann
    6 KB (879 words) - 09:16, 21 June 2017
  • ...prior to a data run, monitor bases, coordinate fixes with Chris and Nick, Hovanes before turn on.
    6 KB (984 words) - 13:07, 29 June 2017
  • * '''JLab''': Alexander Austregesilo, Thomas Britton, Brad Cannon, Hovanes Egiyan, Mark Ito (chair), David Lawrence, Dmitry Romanov, Elton Smith, Nath
    6 KB (883 words) - 15:30, 29 June 2017
  • * '''JLab''': Alexander Austregesilo, Thomas Britton, Eugene Chudakov, Hovanes Egiyan, Mark Ito (chair), David Lawrence, Dmitry Romanov, Justin Stevens, S
    6 KB (798 words) - 14:37, 11 October 2017
  • ...vate/DocDB/ShowDocument?docid=3234 Diamond alignment and beam stability] - Hovanes Egiyan
    8 KB (1,073 words) - 15:42, 31 August 2017
  • * Update on motors (Hovanes)
    282 B (36 words) - 09:29, 3 August 2017
  • ...Alexander Austregesilo, Amber Boehnlein, Thomas Britton, Eugene Chudakov, Hovanes Egiyan, Mark Ito (chair), Curtis Meyer, Sandy Philpott, Joerg Reinhold, Dmi
    4 KB (612 words) - 17:55, 10 August 2017
  • ** BCAL chiller numbering mismatch fixed (Hovanes)
    309 B (39 words) - 17:01, 14 August 2017
  • * ''' JLab ''': Thomas Britton, Eugene Chudakov, Hovanes Egiyan, Mark Ito (chair), Dmitry Romanov, Justin Stevens, Simon Taylor, Ben
    6 KB (941 words) - 12:40, 25 August 2017
  • * BCAL analog alarms (Nick,Hovanes)
    252 B (34 words) - 08:50, 31 August 2017
  • * Hovanes Egiyan has checked in a [https://github.com/JeffersonLab/sim-recon/pull/899
    5 KB (669 words) - 20:49, 7 September 2017
  • * Present: Richard J., James M., Curtis M., Hovanes E., Tim W., Alex D., Sebastian C., Baalouch M., Michael D., Peter P., Ken L
    2 KB (226 words) - 12:29, 11 September 2017
  • * Goni survey (Tim, Hovanes)
    479 B (63 words) - 07:38, 14 September 2017
  • ...lex D., Sebastian C., Baalouch M., Michael D., Alex B., Dan S., Justin S., Hovanes E., Alex S.
    2 KB (252 words) - 11:51, 25 September 2017
  • * Discussed with Alex Somov, Hovanes and Eugene: Agree that this should help with TAC runs: Wire radiator could
    2 KB (350 words) - 11:26, 25 September 2017
  • * FDC/CDC voltage controls (Hovanes)
    327 B (42 words) - 09:04, 27 September 2017
  • .... Nick is working on the distribution box. Once the hardware is installed, Hovanes has to redo the control software, it might be tight in time before the Dece
    2 KB (388 words) - 15:45, 28 September 2017
  • ** Align JD70-104 (17 μm - 1.4·10-4 R.L., 7×7 mm²) (Hovanes) and take enough data to achieve ~1% statistic on rho polarimetry (less tha ...alo measurements to assess background for PRad target TAC runs.]] (A. Deur/Hovanes/A. Somov 1h×2)
    28 KB (4,381 words) - 16:26, 26 November 2018
  • ...e C., Alex D., Alex S., Sebastian C., Baalouch M., Michael D., Dan S., and Hovanes E.
    1 KB (173 words) - 19:19, 23 October 2017
  • * FDC/CDC voltage controls (Hovanes, Nick)
    301 B (39 words) - 07:48, 26 October 2017
  • - FDC threshold upgrade is done: all modules, cables installed; Hovanes finished the control system. Has to be tested, best with DAQ and software t ...than the FDC negative ones. Replacing one module didn't help, decided with Hovanes and Fernando to replace the whole mainframe.
    3 KB (498 words) - 18:44, 2 November 2017
  • - FDC threshold upgrade is done: all mods, cables installed; Hovanes finished the control system. Has to be tested, best with DAQ and software t ...than the FDC negative ones. Replacing one module didn't help, decided with Hovanes and Fernando to replace the whole mainframe.
    3 KB (457 words) - 12:57, 30 November 2017
  • * ''' JLab: ''': Alex Austregesilo, Thomas Britton, Hovanes Egiyan, Mark Ito (chair), Richard Jones, Mahmoud Kamel, Justin Stevens, Ben
    3 KB (503 words) - 16:45, 13 December 2017
  • ...s M., Alexandre D., Baalouch M., Michael D., Alex B., Eugene C., Sasha S., Hovanes E., and Alex S.
    2 KB (351 words) - 13:04, 18 December 2017
  • ...asha can do the TAC runs (including with V-wire) without Hovanes? Or maybe Hovanes can make preparation today so that Sasha can do the runs by himself Sunday ...ould also align the 17 um diamond (0 and 90 degree only). An issue is that Hovanes is off Sunday and Monday. Maybe Paul can do it?
    1 KB (273 words) - 17:52, 13 January 2018
  • ...d J., James M., Curtis M., Alexandre D., Alexander A., Alex B., Justin S., Hovanes E., Eugene C., Alex S., Michael D., and Ken L.
    2 KB (238 words) - 13:59, 22 January 2018
  • * Goniometer linear motion sequence (Hovanes, Vanik)
    387 B (49 words) - 11:54, 25 January 2018
  • ...oks.jlab.org/entry/3523561], [https://logbooks.jlab.org/entry/3523573] and Hovanes [https://logbooks.jlab.org/entry/3523819] #* Different harp fits: Hovanes [https://logbooks.jlab.org/entry/3521184], Richard [https://logbooks.jlab.o
    13 KB (1,919 words) - 12:14, 31 January 2018
  • #** Harp scans by MCC and Hall D (Hovanes on shift)
    11 KB (1,569 words) - 09:43, 7 February 2018
  • #* active collimator - ''Hovanes E.''
    1 KB (171 words) - 12:46, 5 February 2018
  • * ''' JLab: ''' Alex Austregesilo, Thomas Britton, Hovanes Egiyan, Mark Ito (chair), David Lawrence, Beni Zihlmann
    10 KB (1,517 words) - 15:00, 21 February 2018
  • #** [https://logbooks.jlab.org/entry/3532033 Hovanes put lead on the beam profiler for the v-wire study] #* [https://logbooks.jlab.org/entry/3531898 Hovanes made a V-wire study]
    9 KB (1,313 words) - 07:59, 21 February 2018
  • ...to check active collimator X; MCC cannot lock on to it but can lock on Y (Hovanes) #* Move collimator (Hovanes)
    9 KB (1,306 words) - 10:43, 27 February 2018
  • * Present: Richard J., Mark D., Sasha S., Justin S., Hovanes E., Alexander A., Alexandre D. and Dan S.
    1 KB (130 words) - 13:32, 14 April 2020
  • #* For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous cur
    9 KB (1,335 words) - 09:36, 7 March 2018
  • ...to check active collimator X; MCC cannot lock on to it but can lock on Y (Hovanes) #* Move collimator (Hovanes)
    10 KB (1,436 words) - 09:49, 28 February 2018
  • * Translation stages for ComCal (Tim, Hovanes)
    202 B (25 words) - 08:16, 17 May 2018
  • * EPICS support for ActiveMQ messages (Hovanes)
    405 B (55 words) - 19:55, 7 March 2018
  • Tell/email Hovanes that he can check the beam convergence (we do not need this result to proce If PS rate on Al. radiator is wrong too, call Hovanes to do the photon beam transmission optimization (i.e. collimator scan). Thi
    3 KB (478 words) - 16:22, 23 March 2018
  • #* Diamond spot adjustment (Hovanes, needs to start before noon or try again tomorrow) #** Hovanes set diamond positions but didn't have time for spot adjustment, #1 for toda
    8 KB (1,284 words) - 10:35, 4 April 2018
  • * Present: Richard J., James M., Alex B., Alexandre D., Hovanes E., Alexandre A., Mark D., Sasha S, Justin S., Sebastian C., and Eugene C.
    1 KB (166 words) - 12:53, 2 April 2018
  • ...://logbooks.jlab.org/entry/3555570 Multiple peaks in profiler (AC lock?)] (Hovanes) #* [https://logbooks.jlab.org/entry/3556975 Beam Convergence](Hovanes)
    7 KB (896 words) - 17:19, 11 April 2018
  • * Present: <!-- Richard J., James M., Alex B., Alexandre D., Hovanes E., Alexandre A., Mark D., Sasha S, Justin S., Sebastian C., and Eugene C.-
    2 KB (302 words) - 15:42, 6 April 2018
  • #* [https://logbooks.jlab.org/entry/3559655 Harp scan] (Hovanes) #* Hovanes and Sasha need to test V wire and lock on active collimater (~10 minutes)
    8 KB (1,222 words) - 08:42, 18 April 2018
  • * Present: Richard J., James M., Alex B., Alexandre D., Hovanes E., Alexandre A., Mark D., Sasha S, Justin S., Sebastian C., and Eugene C. #* TAC run lessons learned - ''Hovanes''
    1 KB (188 words) - 08:42, 30 April 2018
  • #* TAC run lessons learned - ''Hovanes''
    2 KB (301 words) - 12:21, 30 April 2018
  • #* progress with TAC runs - ''Hovanes''
    2 KB (246 words) - 11:34, 14 May 2018
  • * ''' JLab: ''' Amber Boehnlein, Thomas Britton, Hovanes Egiyan, Mark Ito (chair), David Lawrence, Simon Taylor
    6 KB (979 words) - 17:41, 1 June 2018
  • ** Translation stages (Tim, Hovanes) ** Voltages (Hovanes, Nick)
    326 B (39 words) - 15:55, 13 June 2018
  • ** Translation stages (Tim, Hovanes) ** Voltages (Hovanes, Nick)
    377 B (44 words) - 08:51, 28 June 2018
  • * Goniometer (Tim, Hovanes) ** Translation stages (Tim, Hovanes)
    415 B (48 words) - 17:03, 11 July 2018
  • ** Translation stages (Tim, Hovanes, Sasha) ** Voltages (Hovanes, Nick)
    595 B (73 words) - 08:55, 9 August 2018
  • *** Align JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) (Hovanes) and take enough data to achieve ~1% statistic on rho polarimetry (less tha <!--#*Check bleedthrough level. 10min Hovanes. <font color="red">Hall A/B/C needs to be running</font>-->
    24 KB (3,652 words) - 12:48, 12 December 2018
  • ** Translation stages (Tim, Hovanes, Vanik) ** LED pulser (Hovanes)
    507 B (61 words) - 21:11, 5 September 2018
  • ** LED pulser (Hovanes) ** LED Pulser (Hovanes)
    602 B (71 words) - 09:55, 20 September 2018
  • #* Overnight saw some straight track running with Hovanes doing the flux optimization today. # Run Plan: Hovanes flux optimization/AC calibration. Sergey DAQ work. CDC HV scan? Detector c
    5 KB (833 words) - 09:03, 27 September 2018
  • #** 0930 Quick access for Hovanes with ARM to install the Pb converter; also remember to call Melvin from ra #** Hovanes will calibrate A.C. high gain setting on Thurs am.
    8 KB (1,287 words) - 09:25, 3 October 2018
  • #***TAC run preparation, Hovanes with ARM to install the Pb converter #** Hovanes will calibrate A.C. high gain setting (am, after access)
    7 KB (977 words) - 08:27, 10 October 2018
  • #* Alignment of JD70-105 47um in 10 hours. THANKS TO HOVANES!
    6 KB (821 words) - 08:33, 24 October 2018
  • ** LED pulser (Hovanes) ** LED Pulser (Hovanes)
    457 B (56 words) - 08:05, 18 October 2018
  • ...e. MCC spent an hour working on this with the result being no improvement. Hovanes then realigned the diamonds in preparation for weekend running.
    1 KB (237 words) - 09:23, 24 October 2018
  • #*[https://logbooks.jlab.org/entry/3621853 Hovanes reinstated the beamline vacuum alarm auto-notifications] #*Vacuum pump speed alarm re-enabled by Hovanes
    11 KB (1,688 words) - 10:45, 7 November 2018
  • ** LED pulser (Hovanes) ** Voltages (Hovanes)
    576 B (66 words) - 09:54, 1 November 2018
  • ** LED pulser (Hovanes) ** Voltages (Hovanes)
    396 B (44 words) - 20:55, 14 November 2018
  • #* [https://logbooks.jlab.org/entry/3629008 tagger magnetic field] Hovanes ...https://logbooks.jlab.org/entry/3627399 GONI camera is not communicating] (Hovanes)
    9 KB (1,262 words) - 05:07, 22 November 2018
  • ** XPS Controllers (Nick, Hovanes) * Remote resets (Hovanes, Nick)
    516 B (66 words) - 16:51, 26 June 2019
  • #* Amorphous radiator ladder by Hovanes and Scot
    4 KB (673 words) - 09:42, 12 December 2018
  • ** Voltages (Nick, Hovanes) ** LED pulser (Hovanes)
    544 B (62 words) - 09:39, 13 December 2018
  • ** Voltages (Nick, Hovanes) ** LED pulser (Hovanes)
    608 B (71 words) - 10:04, 10 January 2019
  • <!--#*Check bleedthrough level. 10min Hovanes. <font color="red">Hall A/B/C needs to be running</font>--> #*Verify beam position and envelope (Hovanes).
    27 KB (4,215 words) - 08:36, 10 April 2019
  • ** Voltages (Nick, Hovanes) ** LED pulser (Hovanes)
    810 B (103 words) - 10:45, 24 January 2019
  • ** Scalers and Temperatures from FPGA (Hovanes)
    445 B (55 words) - 22:58, 6 February 2019
  • ...IOCHDCOL failed at 21:30. Reported to us by MCC at 0:00. Reset at 1:50 am. Hovanes verified things are ok at 3am. https://logbooks.jlab.org/entry/3652920
    2 KB (276 words) - 10:09, 15 February 2019
  • ...IOCHDCOL failed at 21:30. Reported to us by MCC at 0:00. Reset at 1:50 am. Hovanes verified things are ok at 3am. https://logbooks.jlab.org/entry/3652920
    5 KB (686 words) - 07:19, 21 March 2019
  • ...gbooks.jlab.org/entry/3666123 Collimator scan]: new AC position -0.1, 0.0 (Hovanes) ...ry/3666037][[https://logbooks.jlab.org/entry/3666074], needs rapid access (Hovanes)
    3 KB (453 words) - 07:21, 21 March 2019
  • * Remote resets (Hovanes)
    421 B (65 words) - 17:51, 20 March 2019
  • #* Hovanes checked the performance of the Active Collimator at small current using Bea ##* Sergey and Hovanes: DAQ
    6 KB (966 words) - 07:22, 21 March 2019
  • #*Verify beam position and envelope (Hovanes). ...flux optimization and Active Collimator calibration. (20 + 20 mins). Call Hovanes.
    34 KB (5,218 words) - 16:32, 31 March 2020
  • ...ork connection that ended up fixing itself after much troubleshooting from Hovanes (https://logbooks.jlab.org/entry/3668424). In total, these and other minor
    1 KB (218 words) - 13:29, 22 March 2019
  • * Remote resets (Hovanes)
    489 B (75 words) - 10:32, 3 April 2019

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)