Run Planning Meeting Notes, Feb. 14-Fev 21, 2019

From GlueXWiki
Jump to: navigation, search

Thursday, Feb. 14 at 08:45

  1. Past 24 hours:
  2. Issues
  3. Today:
    • No planned access
    • Opportunistic access requested by Kenoe to work on GEM.
    • DIRC nominal running (MOROC threshold scan?)

Friday, Feb. 15 at 08:45

  1. Past 24 hours:
    • Nominal DIRC setting collected 1B triggers
      • Switched to the higher MOROC threshold (200)
    • Smooth overnight running at 180nA, coming back to the desired 225nA this morning.
    • Both opportunistic accesses happened during the accelerator down time due to the bulk power supply failure.
  2. Issues:
  3. Plan for today:
    • keep collecting higher MOROC threshold data (up to 1B triggers).
    • When beam is not available, 15 min LED runs with different pulsing and trigger conditions.
    • No planned and opportunistic access