OWG Meeting 13-Feb-2013

From GlueXWiki
Jump to: navigation, search

Agenda

  • Announcements
    • Collaboration Meeting - Fri 22-Feb 2013
      • 11:00 Session IIIb (70) --- DAQ/Online/Slow Controls -(Organizer: Elliott Wolin) - Chair: Dave Lawrence
        • 11:00 (20) --- Counting House Installation Status - Hovanes
        • 11:20 (25) --- DAQ Test Plans - Dave Abbott
        • 11:45 (25) --- Online/Controls Update -Elliott
    • Still need to arrange for Ed to talk more on FPGA programming
  • Review of minutes from 16-Jan-2013 meeting
  • Rebaseline - Hovanes, Dave L, Elliott
  • Level-3 Trigger Update (David L.)
  • Counting House installation update - Hovanes, Elliott
  • Hall D Computer Cluster (HDCC) - Hovanes, Elliott
  • DAQ testing in Rack Room - Dave A, Elliott
  • Hardware configuration parameter storage/retrieval - Beni
  • Status of simulated raw data generation and analysis - Dave L, Dave A, Elliott
  • Solenoid test update - Elliott
  • EPICS - Hovanes
  • Controls - Elliott, Hovanes
  • JInventory database - Elliott
  • DAQ group projects- Bryan, Dave A, Graham, Carl, Vardan, Elliott
    • EVIO, cMsg, CODA3, ECS/CSS, disentangler, readout list, Java/cMsg GUI
  • Electronics, trigger and DAQ status reports - Chris, Alex, Dave, Fernando, Ben, Ed, William, Bryan
  • Mantis Task Tracker
  • Midas Elog]]


  • Calibration/Alignment issues?


Time/Location

1:30 PM Wed 13-Feb-2013 CC F326


Announcements

Next Meeting

1:30 PM Wed 27-Feb-2013 CC F326


Minutes

Present: Elliott W, Simon T, Vardan G, David L, Beni Z.


Collaboration Meeting Agenda

We all agreed on an agenda. (Later Hovanes' talk got merged into Elliott's talk, which went first).


Rebaseline

We briefly discussed the rebaseline effort. Hovanes, David and Elliott will meet to work this out. Hovanes is coordinating the effort.


Level 3

See Dave's slides for full details. This was sort of a practice talk for the collaboration meeting. Dave implemented a L1 filter on MC events, then tested various L3 strategies using about 15 event variables. Ones related to tracking take the most time by far to determine. Cutting on a simple maximum likelihood estimator he was able to get decent rejection with reasonable efficiency using acceptable amounts of cpu time. A more sophisticated multi-dimensional classification scheme might do significantly better. As a proof-of-principle his result shows we should have no problem implementing a L3 trigger system.


Counting House

Elliott gave a brief update on meetings, furniture choices, order status, installation strategy, etc.


HDCC

Elliott gave a brief update on the status of purchase/installation of computer equipment in the Rack room.


DAQ Testing

Elliott gave a brief update on Dave Abbott's plans to perform large-scale DAQ tests in the Rack room.


Controls Parameters

Beni raised questions concerning how we will store and retrieve controls parameters (e.g. hv and lv settings) from the archive system. We are hoping the Accelerator divisions MyA archive system will solve this problem.


Simulated Raw Data

David reported no change here, this is on the back burner due to the collaboration meeting, budgeting and other efforts.


Solenoid Test

Elliott reported we are still in a holding pattern waiting for the cryo plant to come back online.


Controls/EPICS

Elliott reported we are still in negotiation with the Accelerator div concerning how to implement MyA for Hall D, what hardware is needed, etc. There are alternate backup and restore systems from e.g. SNS we might use if MyA isn't good enough.


JInventory

Elliott reported we are almost ready to purchase the small barcode labels, and we should be able to print larger ones ourselves.


DAQ

Bryan reported on ongoing testing of hardware and software in the DAQ group, and that further testing requires the large scale system in the Rack room. CODA3 is ready for the latter, as are the COOL editor and other software. Vardan is working on an AFECS-based trigger configuration system and database with Alex and Dmitry. We are hoping to arrange for Vardan to work on the Farm Manager as well.