Coil Test Weekly Meeting 28-Oct-2010

From GlueXWiki
Jump to: navigation, search

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 28-Oct-2010 9:30 am ARC 428


Agenda

  • Aftermath of Director's Review - George, Mark, Josh, Jonathan, Elliott
    • redundancy in quench detection and other systems
    • redundant breaker in fast/slow interlock chains
    • high-speed DAQ for diagnosis of electrical problems
    • UPS on power supply control system
    • what needs to be done for the test vs for the experiment?
  • PI Responsibilities during test - Jonathan
    • Low power magnet testing 5A, 50A,100A - Elliott
    • High power magnet testing 100-1500A - Elliott
    • Identify possible turn to turn shorts during ramping - Eugene
    • Assess Heim column centering in coil - George
    • Assess Axial column forces - George
    • Estimate LN2 and He heat leak - Jonathan
    • Assess LN2 and LHe thermal siphons - Jonathan
  • OSP status - Elliott
  • Hall probe - Mark S
  • Installation and commissioning status - all
    • pressure testing and certifications
    • pumping/purging
    • connection to cryo system
    • ODH on platform?
    • vacuum gate valve status
    • what else?
  • Magnet power supply and interlock commissioning - Mark S
    • quench protector wiring
    • shunt
    • ground fault detection
    • should strain gauges be in interlock system?
  • Controls racks - Scot
    • strain gauge and UPS interlocks
    • commissioning
    • hook up redundant sensors
    • anything else?
  • PLC programming/testing status - Mark W
    • UPS interlock
    • what's left?
    • another tutorial
  • EPICS - Hovanes
    • communication with Cryo Group
    • connection to guard shack and notification conditions
    • pager status and strategy
  • HMI and EWEB programming - Yi, Hovanes
    • PID screens
    • program access to archived data
    • another tutorial
  • Coil repair status - George
  • Learn how to use Linux for web and email - Elliott
  • Solenoid review 7-Dec
  • Purchase of another PLC and Ethernet module - Elliott
  • Hall D Technical web page
  • Preparations for testing next coil - George, Scot, Elliott
    • update P&I
    • splices
    • yoke location
    • piping adaptors
    • downstream yoke spacers
    • controls racks rewiring
    • quench detector connections
    • connectors on next coil
    • what else?