Coil Test Weekly Meeting 19-Nov-2010

From GlueXWiki
Jump to: navigation, search

Solenoid Coil Test Weekly Meeting

Location and Time

Note new meeting day

  • Fri 19-Nov-2010 9:30 am ARC 428


Agenda

  • Cooldown progress - Jonathan
    • need to recalibrate C and other sensors
  • OSP status - Elliott
    • characterization of glitches, main switch behavior - Mark
  • Test plan - Elliott
    • need fast DAQ dry run
  • Pager
    • are we connected to the guard shack?
    • spurious pages?
  • Experience with control system - All
    • be sure to document our experience
      • need some additions to EWEB pages
  • Preparation for powered operations - All
    • shunt installation/wiring, connection to interlock/control system
    • ground fault detection
    • fast DAQ, which channels, what rates, how to coordinate time with PLC archive?
    • rewire quench detector, how to balance channels?
    • Hall probe
    • pickup coils
    • 230 V UPS on Danfysik control boards, main switch
    • problematic sensors/gauges
      • vacuum gauge status
      • C-glass calibrations (not believable!)
      • C-resistors (maybe believable)
        • should NOT be powered when under vacuum!
    • vacuum gate valve interlock
    • what to do about strain gauges?
    • liquid level monitor/probes
    • vacuum monitor/gauges
    • flag heaters
    • safety equipment, beacons, barriers, etc.
    • anything else?
  • Controls racks and interlocks - Scot
    • UPS lifetime test
  • PLC - Mark W
    • status
    • alarm system
    • hardening
    • UPS interlock?
  • HMI and EWEB programming - Yi, Hovanes
    • program access to archived data
    • alarm screens
    • long-term archive strategy
  • Labview/fast DAQ - Yi, Elliott
    • status
  • Elog - Elliott
    • automatic entries
  • Coil repair status - George
    • coil 3 at IUCO
    • coil 2 winding supports
    • plans for coil 4
  • Solenoid review 7-Dec - Elliott
  • PI Responsibilities during test - Jonathan
    • Low power magnet testing 5A, 50A,100A - Elliott
    • High power magnet testing 100-1500A - Elliott
    • Identify possible turn to turn shorts during ramping - Eugene
    • Assess Heim column centering in coil - George
    • Assess Axial column forces - George
    • Estimate LN2 and He heat leak - Jonathan
    • Assess LN2 and LHe thermal siphons - Jonathan
  • Preparations for testing next coil - George, Scot, Elliott
    • update P&I
    • splices
    • yoke location
    • piping adaptors
    • downstream yoke spacers
    • controls racks rewiring
    • quench detector
    • connectors
    • fix known problems
    • what else?