Photon Beam Commissioning Discussion Aug 13, 2014

From GlueXWiki
Jump to: navigation, search

Organization

  • Time: 4 pm EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821

References

Action Items

  • Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard). Richard is working to update the defined geometry based on a drawing received from Tim, Richard will add field map from Dan Sober
  • Estimate rates and ranges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D)
    • Need rates for profiler, start counter, ps

Agenda

  1. Announcements
  2. Recommendations from ERR Report
    • Notes beyond ongoing efforts:
    • p2 5b) "...strong suggestion by the committee to install several beam loss monitors inside Hall D proper"
    • p5 third paragraph proposes "The installation of a few sacrificial SiPMs in the Tagger hodoscope during the remaining beam transport commissioning activities, at the start of the next beam operations period..."
    • p7 first bullet: "Setup and tuning of photon beam into the experimental area along with monitoring of background and radiation levels. The latter has to be continuously available and cannot rely on the start of the DAQ system."
    • p8 under slow controls: "...concerned about... the motor control commissioning... Specific recommendation: Implement limit switches and/or hardware to avoid movable collimator completely out."
  3. Debrief Aug 8 Review:
  4. Electron Beam Specifications
    • Need signed document?
    • Accelerator and Hall D Interface Document - needs to be finalized.
  5. Update on Electron Commissioning (Todd/Mike)
    • Monitoring of photon beam dump?
    • Populating Operational Restrictions [1]
  6. Update on Photon Commissioning (Alexandre)
    • Version for the ARR
  7. Update Radiation monitors and controls (George/Pavel)
  8. Other business

Minutes

Attending: Elton, Alexandre, Hovanes, Eugene (Hall D); Pavel, George (RadCon); Todd (CASA); Michael (Operations); Richard (UConn); Curtis (CMU).

  1. Action Items
    1. Richard will make updates to geometry for tagger area. We need to provide him additional details about the geometry
    2. (Note added after meeting) Elton will connect Richard with Chuck to obtain the relevant geometry information.
    3. Geometry will be provided in G3 format for Todd and Pavel
  2. Recommendations from ERR Report
    1. Notes beyond ongoing efforts:
      • p2 5b) "...strong suggestion by the committee to install several beam loss monitors inside Hall D proper"
      • p5 third paragraph proposes "The installation of a few sacrificial SiPMs in the Tagger hodoscope during the remaining beam transport commissioning activities, at the start of the next beam operations period..."
      • p7 first bullet: "Setup and tuning of photon beam into the experimental area along with monitoring of background and radiation levels. The latter has to be continuously available and cannot rely on the start of the DAQ system."
      • p8 under slow controls: "...concerned about... the motor control commissioning... Specific recommendation: Implement limit switches and/or hardware to avoid movable collimator completely out."
    2. Richard will provide one "sacrificial" SiPM board with 15 SiPMs for checking neutron rates during electron beam commissioning.
    3. Hovanes is preparing photomultipliers that can be connected to EPICS to register beam loss along the beamline
    4. Limits switches are being installed on the collimator to prevent moving into the out position.
    5. Each item was discussed and responses are being followed up.
  3. Debrief Aug 8 Review:
    1. Photon Beam Commissioning Review Page
    2. Eugene has sent in a request to Arne to include some photon running before the break in the schedule. This will be requested formally to the Commissioning Advisory Board (CAB) next week.
    3. RSAD draft is available at review web page. Feedback will be provided by next Monday.
    • ARR presentations: Must be reviewed: Currently Eugene (2 talks), Elton (1 talk on controls), Curtis (remote connection, non-availability Aug 27 4:00-6:00)
  4. Electron Beam Specifications
    • Need signed document?
    • Accelerator and Hall D Interface Document - needs to be finalized.
  5. Update on Electron Commissioning (Todd/Mike)
    • Monitoring of photon beam dump?
    • Populating Operational Restrictions [2]
  6. Update on Photon Commissioning (Alexandre)
    • Will review document next week
  7. Update Radiation monitors and controls (George/Pavel)
    • Pavel is setting up controls on the boundary
    • Setup data archiving for all radiation monitors in EPICS
    • Ion chamber signals are included into EPICs by the Safety Systems Group
    • Alexandre is working with Melvin to add the radiation monitors from RadCon for the tagger hall and the collimator cave
  8. Other business