Search results

From GlueXWiki
Jump to: navigation, search

Page title matches

Page text matches

  • * password: the normal "halld" password as gluon linux boxes, or ask Elton to get it
    17 KB (2,476 words) - 17:49, 5 January 2016
  • * Elton's Gluex presentation
    603 B (85 words) - 09:00, 9 March 2012
  • ''Attending: Elton, David, Tim (JLab); Will, Sergey, Orlando, Javiera, Hayk, Iñaki (USM): Mat #* Elton asked Matt and Zisis to review labels for Fcal and Bcal, respectively
    8 KB (1,161 words) - 00:08, 1 April 2015
  • # Schedule, reporting, and manpower (Elton) ''Attending: Fernando, Jack, Carl, Chuck, Tina, Yi, Jim, Tom, Elton, Chris
    3 KB (518 words) - 17:12, 22 March 2012
  • * Elton's Gluex presentation [[Media:Detector_basics.pdf]]
    604 B (85 words) - 09:35, 23 March 2012
  • Attendees: ''Naomi J., Beni Z., Lubomir P., David L.(chair), Elton S.''
    3 KB (544 words) - 16:52, 24 February 2017
  • #* <strike> Send excel sheet with progress information to Elton. (Francisco) </strike> ''Attendees:Elton, David, Dan, Yi, Beni (JLab); Alam, Javiera, Francisco, Ricardo (USM); Matt
    4 KB (549 words) - 15:14, 9 October 2012
  • #* Draft a run plan (Elton and Zisis)
    1 KB (204 words) - 23:37, 31 March 2015
  • ...data sheets from Chile to be used as input to jumper settings for boards (Elton) # Schedule, reporting, and manpower (Elton)
    3 KB (422 words) - 17:11, 29 March 2012
  • * '''JLab''': Chuck Hutton, Mark Ito, Elton Smith, Tim Whitlatch, Beni Zihlmann
    744 B (122 words) - 12:34, 31 March 2015
  • ''Attending: David, Sasha, Tim, Beni, John D., Yi, John L., Hovanes, Eugene, Elton (JLab); Matt (IU); Christina, Pavlos, George (Athens); Orlando, Javiera, Wi
    5 KB (802 words) - 15:45, 10 April 2012
  • * Elton Smith Eugene supported Elton's suggestion that the C-channel "clamp" miss the scintillator and hold the
    3 KB (429 words) - 22:50, 31 March 2015
  • ...data sheets from Chile to be used as input to jumper settings for boards (Elton) # Schedule, reporting, and manpower (Elton)
    3 KB (441 words) - 17:13, 12 April 2012
  • ''Attending: Matt (IU), Yi, Eugene, John D., John L., Elton, Beni (JLab); Christina, Pavlos, George (Athens) #* Elton should check status of control boards at JLab
    4 KB (571 words) - 08:51, 25 April 2012
  • Attendees: David L., Mark I., Elton S., Curtis M., Matt S.
    5 KB (684 words) - 16:55, 24 February 2017
  • ...data sheets from Chile to be used as input to jumper settings for boards (Elton) # Schedule, reporting, and manpower (Elton)
    606 B (77 words) - 17:02, 12 April 2012
  • - found clog in quick disconnect (Elton, Alex, Yi, John) temps dropped by few degrees C, still +3 C on downstream s - swapped flow direction from down to up to up to down (Elton, John) and downstream stayed +3C, confirming hypothesis of poor thermal con
    1,010 B (168 words) - 14:57, 16 April 2012
  • #* <strike> Draft a run plan (Elton and Zisis) </strike> ''Attending: Elton, Tim, Fernando, Andrei, Irina, Eugene, Beni (JLab); Orlando, Javiera, Sergu
    4 KB (610 words) - 11:33, 31 March 2015
  • #* <strike> Draft a run plan (Elton and Zisis) </strike> ''Attending: Elton, Beni, John, Yi (JLab); Will (USM); Andrei (UofR)
    4 KB (661 words) - 18:02, 31 March 2015
  • ...d reported on an ad hoc meeting held last week with Irina, Andrei Semenov, Elton Smith, and Eugene Chudakov to discuss the BCAL. One topic was now we smear
    6 KB (965 words) - 15:57, 31 March 2015
  • ...lexiglas support, and space between window frames on glass and plexiglass (Elton, Tim) #* Check status of monitoring control boards at JLab (Elton).
    2 KB (216 words) - 08:49, 25 April 2012
  • ...data sheets from Chile to be used as input to jumper settings for boards (Elton) </strike> # Schedule, reporting, and manpower (Elton)
    3 KB (511 words) - 18:07, 26 April 2012
  • ...n the ESB for gluing light guides. Prepare a plan for production testing. (Elton, Tom) </strike> # Schedule, reporting, and manpower (Elton)
    4 KB (718 words) - 09:02, 11 May 2012
  • * Elton Smith - ''eltonssmith''
    564 B (72 words) - 12:02, 18 July 2022
  • # <strike> Send drawings of light guide gauges to USM (Elton) </strike> sent e-mail yesterday #* [https://cebaf.jlab.org/elog/elog.php?logbook=HDFCALTEST Updates] (Elton)
    5 KB (849 words) - 23:59, 31 March 2015
  • * '''JLab''': Mark Ito (chair), Elton Smith, Tim Whitlatch, Beni Zihlmann ...sue for this detector and to save real estate. That having been said, both Elton and Werner were in favor of including it if possible. One question is wheth
    3 KB (558 words) - 06:35, 1 April 2015
  • # Preliminary look at pulse heights and times (Elton) # Considerations in choosing the SiPM operating voltage (Notes by Elton)
    2 KB (261 words) - 10:30, 31 March 2015
  • # See Elton's new Wiki page for Spring 2016 run preparations ...(Athens), Will, Curtis (CMU), Noemi, Tegan, Ahmed, Zisis, Andrei (Regina), Elton, Mark (JLab) "
    4 KB (553 words) - 17:12, 24 February 2017
  • * '''JLab''': Chuck Hutton, Mark Ito, Elton Smith, Tim Whitlatch, Beni Zihlmann ...filed with JLab Procurement. The committee members were Beni, Dan Carman, Elton, Bruce Lenzer, and Mark. Eugene Chudakov was present at the review meeting.
    3 KB (440 words) - 04:25, 1 April 2015
  • # Schedule, reporting, and manpower (Elton) # Beam test experience (Elton)
    3 KB (501 words) - 16:21, 24 May 2012
  • # Progress in MOUs, contracts and procurement (Elton/Curtis)
    525 B (67 words) - 11:33, 31 March 2015
  • * On simulating sampling fluctuations in the BCAL, David reported that Elton Smith has summarized the discussion held when Andrei and Irina Semonov(a) w
    5 KB (829 words) - 17:23, 31 March 2015
  • ## Gain of pre-amplifier. Elton suggested to set the nominal bias to Vover=1.2 V. With this configuration, ''Attending: Elton, Beni, Dvid, Tim (Jlab); Zisis (UofR); Will, Serguei, Javiera, Iñaki, Orla
    7 KB (1,092 words) - 23:59, 31 March 2015
  • ...eb.jlab.org/doc-private/DocDB/ShowDocument?docid=2147 Contract Status] --- Elton Smith ...ssion Ib (145) --- Electronics/Trigger - (Organizer: Sascha Somov) - Chair:Elton Smith
    8 KB (1,048 words) - 12:39, 14 March 2017
  • # Schedule, reporting, and manpower (Elton) # Beam test experience (Elton)
    3 KB (409 words) - 17:31, 21 June 2012
  • ...lexiglas support, and space between window frames on glass and plexiglass (Elton, Tim)
    4 KB (667 words) - 16:01, 6 June 2012
  • ''Attendees: Fernando, Elton, Eugene, Beni (JLab), George, Andrei, Zisis (Regina)''
    2 KB (285 words) - 17:27, 18 June 2012
  • ''Attending: Elton, Beni, David, John, Ben, Yi, Tim (Jlab); Will, Javiera, Orlando, Iñaki (US ##* Elton: Checking signals on scope can be very informative.
    5 KB (754 words) - 15:57, 31 March 2015
  • ...lexiglas support, and space between window frames on glass and plexiglass (Elton, Tim) ''Attendees: Elton, David, Beni, Tara, Tim, Eugene (JLab); Zisis, Andrei (UofR); Javiera, Will
    5 KB (734 words) - 14:26, 19 June 2012
  • * Elton Smith - ''eltonssmith''
    743 B (107 words) - 08:38, 19 June 2012
  • ...lexiglas support, and space between window frames on glass and plexiglass (Elton, Tim) </strike> Appears that the 3 1.5" holes are adequate. #* <strike> no-cost schedule extension for Fcal (Elton) </strike> Extension has been signed.
    6 KB (832 words) - 01:50, 1 April 2015
  • # Schedule, reporting, and manpower (Elton) ''Attending:Jack, Nick, Chris, Elton, Jim, Eugene
    2 KB (336 words) - 16:20, 5 July 2012
  • * Elton Smith - ''eltonssmith'' Attendees: Rory M., David L., Sasha M., Elton S.
    648 B (100 words) - 14:00, 26 June 2012
  • #* <strike> Check on payment for first article delivery (Elton) </strike> Payment has been made ''Attending:Elton, John, Zisis, Shaun, Tara, Eugene, Yi, Tim (Jlab); Will, Javiera, Orlando,
    5 KB (724 words) - 03:04, 1 April 2015
  • #* <strike> When to ship structure to JLab? (Elton and Tim to review schedule) </strike> Should be ready by mid to late August ''Attendees: David, Beni, Tara, Elton, Yi, John L. (Jlab); Zisis, Andrei (UofR); George, Stratos, Christina (Athe
    8 KB (1,196 words) - 18:34, 17 July 2012
  • # <strike> Complete molds for wrapping and order forms (Jim) </strike> Elton to test wrapping forms. # Schedule, reporting, and manpower (Elton)
    3 KB (535 words) - 17:31, 26 July 2012
  • #* <strike> Understand how Orlando's data relates to the SiPM specifications (Elton et al) </strike> ''Attending: Zisis, Andrei (UofR); Tim, Elton, Ben, David, Yi, Beni, Eugene (JLab); Alam, Will, Javiera (USM)
    5 KB (723 words) - 12:38, 14 March 2017
  • Present: Elliott W, Simon T, Elton S, Vanik K, Beni Z, Dave A, Vardan G, Dave L.
    6 KB (974 words) - 02:55, 1 April 2015
  • ''Attendees: Elton, David, Tim, Yi, Manuel, Dan, Beni, Eugene (JLab); Wil, Sergey, Javiera, Or ##* Elton: How much time does it take to machine and polish each piece? Answer: 20 mi
    4 KB (692 words) - 17:11, 24 February 2017
  • <!--Attendees: Albert F., Andrew S., Elton S., Iliya L., Mark I., Rory M., Nick B., Vambow-->
    2 KB (280 words) - 07:39, 8 July 2020
  • * '''JLab''': Mark Ito (chair), Manuel Lara, David Lawrence, Paul Mattione, Elton Smith, Simon Taylor, Elliott Wolin, Beni Zihlmann
    4 KB (636 words) - 11:11, 31 March 2015
  • ...tage (Orlando): Correct equation 3 on p5, according to the discussion with Elton and Yi from two weeks ago. See plots starting on p34. Repeated measuremen
    3 KB (514 words) - 12:38, 14 March 2017
  • # Test wrapping forms (Elton) # Schedule, reporting, and manpower (Elton)
    3 KB (500 words) - 18:41, 9 August 2012
  • ''Attendees: John, Beni, David, Yi, elton, Tim, Eugene, Manuel, Dan (JLab); Hayk, Javiera, Iñaki, Will (USM); Zisis, ## Installation of monitoring boards (Elton)
    8 KB (1,260 words) - 17:12, 24 February 2017
  • * Elton Smith - ''eltonssmith''
    548 B (68 words) - 14:20, 5 August 2012
  • * <strike> Elton to check light guide delays versus FastTrack and inform us if we are on a c ''Attending:Elton, Beni, Yi, Eugene, David (JLab); Zisis, Andrei (UofR); Javiera, Hayk, Iñak
    4 KB (652 words) - 15:22, 21 August 2012
  • # <strike> Test wrapping forms (Elton) </strike> Tara and Elton used the pattern prepared by Jim and checked the fit. The pattern can be ex ...Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
    4 KB (639 words) - 17:02, 16 August 2012
  • # <strike> Send table of light guide measurements for Elton and Tim to review for acceptability (Iñaki) </strike> # <strike> Check on Fcal monitoring board review (Elton and Fernando) </strike> Fernando has reviewed the drawings and has approved
    7 KB (1,142 words) - 17:02, 24 February 2017
  • * Elton Smith - ''eltonssmith'' Attendees: Rory M., David L., Sasha M., Elton S., Candace H.
    2 KB (320 words) - 16:23, 16 August 2012
  • ...Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) # <strike> Clarify option of purchase of additional SiPMs (Elton) </strike>
    3 KB (494 words) - 08:20, 24 August 2012
  • * Elton Smith - ''eltonssmith'' David reported on Elton's behalf that a draft of the MOU needed for Sergey Gevorgyan's visit has be
    3 KB (418 words) - 11:35, 13 September 2012
  • ...Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) # Schedule, reporting, and manpower (Elton)
    3 KB (384 words) - 18:06, 30 August 2012
  • *'''JLab''': Mark Ito (chair), Elton Smith, Simon Taylor
    3 KB (534 words) - 11:26, 29 August 2012
  • #* <strike> Elton will work on the Bcal readout section </strike> Checked in initial draft ''Attending: Elton, Dan, David, Yi, Beni, Tim, Eugene (JLab); Javiera, Will, Alam (USM); Georg
    7 KB (1,008 words) - 18:37, 11 September 2012
  • Participants: Curtis, Naomi, Beni, Lubomir, Simon, Elton, Mark
    2 KB (269 words) - 18:08, 29 August 2012
  • Participants: Fernando, Bill, Dave, Elton, Simon, Chris, Vlad, Beni, and Lubomir
    6 KB (982 words) - 05:48, 1 April 2015
  • ...Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) # Schedule, reporting, and manpower (Elton)
    3 KB (491 words) - 17:00, 13 September 2012
  • * Elton Smith - ''eltonssmith'' Attendees: Rory M., Sasha M., Elton S., David L.
    3 KB (429 words) - 14:51, 14 September 2012
  • ...rd J., James M., Brendan P., Alex B., Fridah M., Dan S., Mike D., Mike M., Elton S., Yi Q., Ivan T., Tim W., Franz K., Curtis M., and Eugene C.
    1 KB (171 words) - 12:40, 14 March 2017
  • Attending: Sean (NU); Curtis, Elton, Simon, Adesh, Mark I., Paul, Alex B., Nathan (JLab); Will M., Naomi (CMU);
    7 KB (1,160 words) - 17:04, 24 February 2017
  • # [https://logbooks.jlab.org/entry/3367636 Fcal response to charged tracks] (Elton)
    2 KB (225 words) - 17:00, 15 December 2015
  • ''Attendees: Dan, Manuel, Elton, David, Tim, Beni, Yi, John, Eugene (JLab); Shaun, Zisis, Andrei (UofR); Ch ##* Cover in front of array is 2x1/16" flame retardant ABS plastic. Elton: Is there a beam hole? No, but one will be added
    7 KB (1,003 words) - 19:44, 31 March 2015
  • * Elton Smith (Hall D Staff)
    2 KB (265 words) - 11:31, 18 September 2012
  • ...Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) # Schedule, reporting, and manpower (Elton)
    4 KB (555 words) - 16:50, 24 February 2017
  • Present: Elliott W, Josh B, Hovanes E, Dave B, Manuel L, Dan B, Elton S.
    2 KB (351 words) - 17:12, 24 February 2017
  • ''Attending: Elton, David, Ivan, Yi, Beni, Eugene (JLab); Shaun, Zisis, Andrei (UofR); Stratos #* Elton: Please send the data electronically. [Note: Stratos has already shipped th
    5 KB (706 words) - 17:14, 24 February 2017
  • ''Attending: Christina, Stratos (Athens); Elton, David, Yi, Tim, Eugene (JLab); Will, Alam, Javiera (USM) #* Elton: jerry-rigged a new string of LEDs to trigger T3 perpendicular to the small
    5 KB (802 words) - 17:12, 24 February 2017
  • ...Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) # <strike> Provide feedback to Fernando on his readout assembly schedule (Elton and Jim) </strike>
    3 KB (441 words) - 07:19, 19 October 2012
  • * Elton Smith - ''eltonssmith'' Attendees: Rory M., Candace H., Sasha M., David L., Elton S.
    1 KB (155 words) - 15:39, 21 September 2012
  • # Progress in MOUs, contracts and procurement (Elton/Curtis)
    657 B (89 words) - 07:58, 2 October 2012
  • * '''JLab''': Chuck Hutton, Mark Ito (chair), Elton Smith, Tim Whitlatch, Beni Zihlmann ...Two rods have been purchased from the new company. They will be evaluated. Elton suggested using a laser and visually observing the amount of scattering to
    3 KB (477 words) - 21:45, 31 March 2015
  • * Elton Smith - ''eltonssmith'' Attendees: Rory M., Candace H., Sasha M., David L., Elton S.
    470 B (57 words) - 09:17, 28 September 2012
  • * Elton Smith - ''eltonssmith'' # Generated and Reconstructed Kinematics at nominal target position (Elton)
    2 KB (221 words) - 09:52, 12 October 2012
  • ...pane and TOF detector and rerun simulation to check photon reconstruction (Elton to see if Beni or Richard can add the geometry)
    4 KB (696 words) - 06:40, 24 October 2012
  • ...Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) # mini-Bcal (Elton)
    3 KB (527 words) - 10:15, 2 November 2012
  • ...Ann Marie C., Brendan P., James M., Alex S., Todd S., Nathan S., Mark D., Elton S., Franz K., Mike D., Bill C., Yi Q., Dan S., Natalie W., Franz K. and Eug ...b.org/doc-private/DocDB/ShowDocument?docid=2376 Detector Specifications] - Elton
    1 KB (178 words) - 17:13, 24 February 2017
  • ...ab: ''': Alex Austregesilo, Alex Barnes, Thomas Britton, Mark Ito (chair), Elton Smith
    6 KB (902 words) - 19:11, 15 November 2017
  • # <strike> Add Fcal dead channels into the MC. [Matt and Elton] </strike> See links below ''Attendees: Elton, Mark, Colin, Simon (JLab); Sean (FSU); Matt, Jon (IU); George (Athens); Zi
    7 KB (1,126 words) - 15:00, 14 December 2017
  • # Add Fcal dead channels into the MC. [Matt and Elton] '' Attendees: Elton, Mark, Simon (JLab); Will (CMU); Christina, George (Athens); Jon (IU); Sean
    7 KB (995 words) - 13:59, 30 November 2017
  • ...n P., Eugene C., Alex S., Curtis M., Franz K., Barry R., Mike D., Igor S., Elton S., Yi Q., Dan S.
    1 KB (217 words) - 11:27, 17 October 2012
  • * Elton Smith - ''eltonssmith'' Attendees: Rory M. (chair), Candace H., Elton S., David L., Sasha M.
    2 KB (244 words) - 10:05, 19 October 2012
  • Present: Elliott W, Dan B, Manuel L, Josh B, Dave B, Hovanes E, Elton S.
    3 KB (385 words) - 16:54, 24 February 2017
  • #* Provide feedback on measurements described on the wiki (Elton). ''Attending:Elton, Ivan, David, Beni, Eugene, Yi (JLab); Alam, Javiera, Will, Hayk (USM); Chr
    5 KB (702 words) - 07:10, 1 April 2015
  • ...pane and TOF detector and rerun simulation to check photon reconstruction (Elton to see if Beni or Richard can add the geometry) ''Attendees:John, Dan, Elton, Yi, Ivan, David (JLab); Will, Hayk, Francisco, Alan (USM); Christina, Geor
    5 KB (794 words) - 19:02, 6 November 2012
  • ''Attending: Elton, David, Ivan , Beni, Yi, Eugene (JLab); Will, Alam, Orlando, Ricardo, Hayk ...that modifications to the data base were conducted based on feedback that Elton provided to the description of items on the wiki.
    5 KB (795 words) - 14:39, 13 November 2012
  • ...f these in a previous collaboration meeting. David has contacted Zizis and Elton on this and has identified the relevant drawings. A fix is on the way. In a
    4 KB (629 words) - 14:25, 31 March 2015
  • * Elton Smith - ''eltonssmith'' ...re still missing the azimuthal distribution of the &pi;&pi; system (not in Elton's plots)
    2 KB (353 words) - 08:13, 9 November 2012
  • # <strike> Fcal cabling (Elton to find out status of cables ordered by JLab and status of labeling) </stri # <strike> Fcal contract extension (Elton to verify all is completed) </strike> Contract extension is in place.
    5 KB (743 words) - 10:50, 31 March 2015
  • ...Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) </strike> Decided to have a separate patch panel, which allo ...ularity of LED bias and power, as well as multiplicity of trigger signals (Elton) </strike>
    4 KB (599 words) - 17:40, 6 December 2012
  • Present: Elliott W, Simon T, Dave L, Bruyan M, Hovanes E, Elton S.
    4 KB (620 words) - 22:03, 31 March 2015
  • * Elton Smith - ''eltonssmith''
    2 KB (283 words) - 17:26, 9 November 2012
  • Present: Curtis, Naomi, Beni, Eugene, Simon, Elton, Mark
    2 KB (327 words) - 16:44, 6 December 2012
  • ...mments a concept for distributing monitoring inputs to the control boards (Elton) </strike> See [https://mailman.jlab.org/pipermail/halld-cal/2012-November/ ...pane and TOF detector and rerun simulation to check photon reconstruction (Elton to see if Beni or Richard can add the geometry) </strike> Beni has agreed t
    7 KB (1,211 words) - 08:40, 21 November 2012
  • * Elton Smith - ''eltonssmith''
    705 B (80 words) - 04:03, 30 November 2012
  • ''Attendees: Elton, Mark, Wil, Jon, Adesh, Simon (Jlab); George, Christine (Athens); Mike (CMU ##* There was discussion on what could be the source of the discrepancies. Elton noted that the trigger simulation in MC may be one source of the difference
    7 KB (1,164 words) - 12:39, 14 March 2017
  • ''Attendees: Elton, David, John, Yi, Beni (JLab); Hayk, Will, Alam, Orlando (USM); Shawn, Zisi ##* Elton: IU should propose the dynamic range of signals required for the LED monito
    4 KB (539 words) - 17:10, 24 February 2017
  • ...Confirm with Fernando that the labeling of boards U1-U48 and D1-D48 is ok (Elton) </strike> # <strike> Make decisions on how to treat sensors with high dark rate (Elton) </strike> They satisfy our specifications. Use along with others.
    3 KB (480 words) - 17:33, 28 February 2013
  • * Elton Smith - ''eltonssmith''
    628 B (75 words) - 15:09, 6 December 2012
  • ''Attending: David, Yi (Jlab), Elton (GSI), Hayk (USM), Christina, Pavlos (Athens), Shaun, Andrei, Zisis (Regina ...by Kappos. Delivery will be after XMas. Christina will communicate with Elton to arrange the shipments in view of minimizing customs duty.
    4 KB (583 words) - 11:36, 12 December 2012
  • * Elton Smith - ''eltonssmith''
    558 B (63 words) - 09:39, 14 December 2012
  • * '''JLab''': Mark Ito (chair), David Lawrence, Yi Qiang, Dmitry Romanov, Elton Smith, Simon Taylor, Beni Zihlmann
    6 KB (990 words) - 15:09, 18 December 2012
  • ''Attendees:Elton, John L., David, Yi, Eugene, Lubomir, Beni (JLab); Hayk, Will, Orlando, Ala ##* Elton: Inquired about the mylar sheet inserted between the mu-metal and the iron.
    7 KB (1,061 words) - 00:14, 1 April 2015
  • ''Attending: Elton, Beni, David, Yi (JLab); Christina, Pavlos (Athens); Shaun, Zisis, Andrei ( #* Elton and Christine will work out shipping details offline.
    4 KB (573 words) - 18:37, 15 January 2013
  • * Elton Smith - ''eltonssmith''
    1 KB (134 words) - 09:44, 4 January 2013
  • #* <strike> Work out shipping details (Elton and Christina) </strike> Two packages shipped, should arrive today. ''Attending: Elton, Beni, Yi, Fernando, David (JLab); Zisis, Andrei (UofR); Christina, George
    7 KB (1,021 words) - 06:42, 1 April 2015
  • # Light guides (Elton) ''Attending: Elton, Tom, Tina, Chris, Nic, Fernando, Jim, Yi
    2 KB (300 words) - 19:02, 14 February 2013
  • * Elton Smith - ''eltonssmith'' Attendees: Rory, Sasha, Elton.
    2 KB (362 words) - 13:04, 11 January 2013
  • ...mewalk calibration plugin to use the RF as a reference instead of the PS. Elton mentioned that Alex had said before that he got different results if he use
    9 KB (1,509 words) - 19:08, 24 February 2016
  • ''Attendees: Elton, John, Shaun, Beni, Yi, Eugene, David, Tim (JLab); Christina, Pavlos (Athen ##* Bcal production including testing (Elton)
    6 KB (933 words) - 17:11, 24 February 2017
  • * Elton Smith (Hall D Staff)
    5 KB (602 words) - 20:27, 1 March 2013
  • ...rg/doc-private/DocDB/ShowDocument?docid=2212 Update MOUs and Contracts] -- Elton Smith. ...yMeeting?sessionid=413 Electronics] - (Organizer: Fernando Barbosa) Chair: Elton Smith
    9 KB (1,108 words) - 12:38, 14 March 2017
  • ...private/DocDB/ShowDocument?docid=2398 Preparations for Commissioning] --- Elton Smith ...e/DocDB/DisplayMeeting?sessionid=455 Tracking] - (Organizer: Beni ) Chair: Elton Smith
    10 KB (1,265 words) - 12:39, 14 March 2017
  • ''Attending: Elton, David, Yi, Tim, Beni (JLab); Hayk, Orlando, Alam, Serguei, Elias, Will (US ##* Elton: Three non-conforming guides shipped back to Chile are stuck in customs in
    5 KB (758 words) - 17:14, 24 February 2017
  • * Elton Smith - ''eltonssmith''
    613 B (70 words) - 10:19, 31 January 2013
  • * Elton Smith - ''eltonssmith'' Elton reported to Dave prior to the meeting that Sergey has tickets to come on Fe
    834 B (107 words) - 17:09, 28 January 2013
  • Attending: Elton, Yi, Beni, David, Eugene, Sasha (JLab); Christina, Pavlos, Stratos (Athens) #* Elton: How long to complete project once acceptance is completed? Most parts are
    7 KB (1,057 words) - 11:36, 31 March 2015
  • #* <strike> Elton to e-mail Hamamatsu regarding shipment of 360 MPPCs to inquire status. </st ...rike> Take special runs to understand the nature of the "reflected" pulse (Elton and Shaun) </strike>
    4 KB (620 words) - 14:39, 19 February 2013
  • * Elton Smith - ''eltonssmith'' Attendees: Elton S., David L., Rory M., Sergey G., Sasha M.
    906 B (111 words) - 10:03, 14 February 2013
  • ''Attendees: John, Elton, Beni, David, Yi (JLab); Stratos, George (Athens); Kei (IU), Serguei, Will, #* Elton: Requested that Athens prepare a draft specification, so that the process c
    6 KB (867 words) - 17:13, 24 February 2017
  • * Elton Smith - ''eltonssmith''
    1 KB (133 words) - 10:04, 14 February 2013
  • #* Nick to send location of files with the SiPM assignment information to Elton and Yi. ''Attending: Elton, Chris, tina, Tim, Nic, Yi, Jim
    3 KB (445 words) - 06:44, 19 April 2013
  • ...allation Plan ([[Media:Fcal_assembly_schedule_v0.pdf | Draft schedule from Elton]]) (Matt) JLab: Hovanes, Elliott, Tim, Mark, John, Dan, Elton
    3 KB (474 words) - 17:12, 24 February 2017
  • #* <strike> Provide actual copy of proforma invoice from Jlab (Elton) </strike> #* <strike> Get a count of non-conforming light guides (Elton) </strike>
    6 KB (865 words) - 17:13, 24 February 2017
  • # Progress in MOUs, contracts and procurement (Elton/Curtis)
    788 B (102 words) - 18:55, 21 February 2013
  • ''Attendees'': Elton, David (JLab); George, Zisis, Shaun, Andrei (UofR) Elton gave a detailed overview of the current and planned BCAL activities and tim
    4 KB (700 words) - 00:15, 27 February 2013
  • # Provide lists of SiPMs to Nic and Chris to facilitate sorting (Elton) # Light guides (Elton)
    2 KB (341 words) - 17:59, 28 February 2013
  • * Elton Smith - ''eltonssmith''
    935 B (118 words) - 09:34, 28 February 2013
  • * Matt and Elton will iterate on FCAL schedule
    1 KB (194 words) - 12:25, 15 March 2013
  • ''Attending:Elton, Tim, Shaun, Yi, David, Beni (Jlab); Andrei (UofR); Hayk, Alam, Orlando, El ...e is a question about how to complete the shipment of 370 units next week. Elton suggested one possibility would be to include the non-conforming MPPCs and
    5 KB (808 words) - 15:13, 19 March 2013
  • * Elton Smith - ''eltonssmith''
    1 KB (148 words) - 23:25, 6 March 2013
  • ''Attendees:Elton, Tim, Yi, David, Beni (JLab); Kei, Matt (IU); Zisis, Andrei (UofR); Will, H #* Zisis: Plan a photo shoot for the final block. (Elton will ask Greg Adams to take photo).
    5 KB (849 words) - 16:29, 26 March 2013
  • * Elton Smith - ''eltonssmith''
    1 KB (131 words) - 20:47, 13 March 2013
  • * Elton Smith (Hall D Staff)
    4 KB (506 words) - 15:49, 21 March 2013
  • ...y how the non-conforming SiPMs will be returned to Hamamatsu and replaced (Elton and Hayk) </strike> Non-conforming SiPMs will be shipped to JLab in the 370 ''Attending: Will, Serguei (USM); Shaun, Zisis, Andrei (UofR); Elton, Beni, David (JLab)
    4 KB (628 words) - 17:13, 24 February 2017
  • * Requirements for BCAL/FCAL LED pulser calibration system - Elton Present: Elliott W, Elton S, Dan B, Fernando B, John L, Yi Q, Scot S, Mark S, Dave B, Tara B, Alex S,
    5 KB (798 words) - 11:12, 31 March 2015
  • ...James M., Michael D., Dan S., Nathan S., Alex S., Curtis M., Franz K., and Elton S.
    1 KB (146 words) - 17:06, 24 February 2017
  • ''Attendees: Elton, Beni, David, Yi (JLab); Matt, Kei (IU); Christine (Athens); Will, Elias, A ##* Elton commented on the Figure that shows the overlap of trigger scintillators and
    5 KB (767 words) - 15:51, 9 April 2013
  • ...y how the non-conforming SiPMs will be returned to Hamamatsu and replaced (Elton and Hayk) </strike> Non-conforming SiPMs will be shipped to JLab in the 370
    1 KB (181 words) - 16:30, 2 April 2013
  • Present: Mark S., Jonathan, Elton, Orlando, Scot, Dave B., Eugene, Hovanes ...rom Chile is visiting us for 6 months. He will be working with Hovanes and Elton on BCAL slow controls.
    3 KB (414 words) - 10:05, 27 January 2014
  • * Elton Smith - ''eltonssmith''
    1 KB (148 words) - 09:26, 4 April 2013
  • ....jlab.org/doc-private/DocDB/ShowDocument?docid=2189 GHP Meeting, Denver] (Elton)
    2 KB (245 words) - 16:50, 24 February 2017
  • ''Attendees: Elton, Beni (JLab); Shaun (UofR); Will, Alam, Alison, Elias (USM); Athens tried t #* Elton past on the request to procurement to make a no-cost extension to the contr
    3 KB (462 words) - 17:50, 23 April 2013
  • * Elton Smith - ''eltonssmith''
    1 KB (164 words) - 13:24, 11 April 2013
  • #* <strike> Return 84 non-conforming light guides (Elton) </strike> Boxes are prepared and ready for shipment ''Attendees: Elton, Beni, David, Yi (JLab), Matt (IU), Christina, George Vasileiadis (Athens),
    5 KB (782 words) - 07:29, 8 May 2013
  • * Elton Smith - ''eltonssmith'' # [[Media:Plot piprob.pdf|Pi prob.]] (Elton)
    1 KB (148 words) - 09:05, 18 April 2013
  • # <strike> Start a series of illumination tests to test the new procedures (Elton) </strike> ''Attending: Yi, Chris, Keith, Tina, Jim, Nic, Fernando, Elton.
    3 KB (546 words) - 18:07, 25 April 2013
  • * Elton Smith - ''eltonssmith'' # [[Media:Fcal lambdaI.pdf|LGD interaction length]] (Elton)
    1 KB (143 words) - 13:40, 23 April 2013
  • # Check on status of returning "borrowed" SiPM (Elton) ''Attending: Chris, Tina, Elton, Jim, Nic
    3 KB (517 words) - 12:41, 3 May 2013
  • * Elton Smith - ''eltonssmith'' # [[Media:Beam rates cpp.pdf |Beam rates]] (Elton)
    1 KB (144 words) - 08:01, 25 April 2013
  • ''Attending: Elton, David, Beni (JLab); Christina, George Vasileiadis (Athens); Shaun, Zisis, ...the glue (previous experience resulted in a darkening of a glue he used). Elton: Will check.
    5 KB (830 words) - 17:48, 30 April 2013
  • # <strike> Check on status of non-conforming SiPMs (Elton) </strike> Hamamatsu has completed their evaluation. Confirm 2 bad. Have ag # <strike> Check on radiation hardness of glue (Elton) </strike> Based on a conversation with Carl Zorn we do not expect radiatio
    4 KB (647 words) - 13:14, 14 May 2013
  • | 7/22/2013 07:00-13:00 || Elton S. || Shaun K. ||
    564 B (63 words) - 11:19, 19 July 2013
  • ...the SiPMs are the same in the ESB test setup. David will speak more with Elton on this, and Regina will discuss it internally as well.
    4 KB (668 words) - 12:43, 31 March 2015
  • * Elton Smith - ''eltonssmith''
    1 KB (153 words) - 08:14, 2 May 2013
  • * Elton Smith - ''eltonssmith''
    1 KB (134 words) - 08:51, 3 May 2013
  • # Light guide testing (Elton)
    505 B (68 words) - 12:31, 3 May 2013
  • #* Return 84 non-conforming light guides (Elton) # Action Items: defer until Elton returns
    3 KB (434 words) - 18:32, 21 May 2013
  • * Elton Smith - ''eltonssmith'' # [[Media:Muon ms cpp.pdf]] (Elton)
    1 KB (140 words) - 09:49, 9 May 2013
  • #* They will compare notes and, with Elton, come to a consensus of which light guides are to be classified as "detache ...Any changes of procedures will have to be approved by Elton, or by Tim if Elton is not available.
    2 KB (355 words) - 12:07, 10 May 2013
  • * Elton Smith - ''eltonssmith''
    2 KB (227 words) - 09:14, 16 May 2013
  • #* Return 84 non-conforming light guides (Elton)
    1 KB (150 words) - 12:54, 21 May 2013
  • * Elton Smith - ''eltonssmith''
    1 KB (168 words) - 11:47, 23 May 2013
  • # Progress in MOUs, contracts and procurement (Elton/Curtis)
    778 B (105 words) - 09:44, 28 May 2013
  • * Elton Smith - ''eltonssmith''
    1 KB (161 words) - 09:06, 30 May 2013
  • * Elton Smith (Hall D Staff)
    3 KB (398 words) - 12:00, 11 June 2013
  • * Elton Smith - ''eltonssmith''
    1 KB (182 words) - 07:44, 13 June 2013
  • # Action Items: Chile responded offline to Elton's request on an update regarding the light guide re-machining. # Monitoring: Stratos responded offline to Elton's question regarding the FCAL plexiglas sheet specs. G. Vassileiadis will m
    4 KB (559 words) - 17:06, 24 February 2017
  • ''Attendees: Elton, George, John (JLab); Christina, Pavlos (Athens); Shawn, Andrei (UofR); Wil ##* Christina: Payment not yet received. Elton will check up on it. [Note added: Christina sent a note on Wed saying the p
    4 KB (607 words) - 17:13, 24 February 2017
  • ...Alex B. Nathan S., Justin S., Elton S., Richard J., Michael D., Franz K., Elton S., Sascha S, Tim W. and Eugene C.
    1 KB (183 words) - 13:52, 6 June 2016
  • Present: CMU (Curtis), JLab (Mark, Tim, Eugene, Elton, John, Hovannes, Yi, Elliott, Lubomir), UConn (James), IU (Matt) BCAL (Elton): Ten modules remain to have light guide installation. Main focus is doin
    4 KB (673 words) - 21:54, 31 March 2015
  • ..., Pavlos (Athens); Shawn, Andrei (UofR); Will, Alam, Elias (USM); Serguei, Elton, Beni, Yi, David (JLab). ...k, it appears we have sufficient electronics to instrument all 49 modules. Elton has asked Chris to order 100 LEDs so that broken boards can be fixed.
    4 KB (668 words) - 15:13, 25 June 2013
  • # <strike> Send a letter of invitation to Alam (Elton) </strike> Sue Ewing Fedexed the letter on Friday and it arrived at the uni ''Attending: Shaun, Zach, George, Elton, Andrei, Beni (JLab); Christina (Athens); Alam, Elias, Alison, Will (USM)
    4 KB (599 words) - 12:31, 9 July 2013
  • # <strike> Check on status of Alam's invitation letter (Elton). </strike> ''Attendees: George, Elton, Dave (JLab); Matt (IU); Christina (Athens); Serguei, Will (USM).
    4 KB (549 words) - 15:11, 16 July 2013
  • ''Attendees: Elton, mark, Will, Zhenyu Zhang (Jane), Simon, Justin (Jlab); Matt (IU); Zisis, A #* Elton: Systematic mass shifts in calibration (using inclusive data) could be caus
    7 KB (1,084 words) - 12:39, 14 March 2017
  • # <strike> Monitoring Bcal boards: Elton will check that we have sufficient stock. </strike> ''Attending: Zisis, Laura, Teagan, Andrei (UofR); George, Elton, Yi, Serguei, David, Beni (Jlab); Will (USM); Christina (Athens).
    4 KB (567 words) - 17:13, 24 February 2017
  • * Elton Smith - ''eltonssmith'' Attendees: ''David L., Elton S., Ali, Sasha M., Rory M.''
    2 KB (227 words) - 11:26, 12 July 2013
  • Attending: Sean (NU); Will, Curtis, Naomi, Mike S. (CMU); Paul, Simon, Elton, Luke, Mark I., Nathan, Dominick, Brad, Adesh, Alex B., Mahmoud, Beni (JLab ...of RCDB queries (e.g. certain trigger settings, solenoid current, etc.). Elton suggested that a minimum number of events cut and additional flag to exclud
    9 KB (1,361 words) - 17:11, 24 February 2017
  • Present: Curtis, Naomi, Simon, David, Elton, Lubomir, Cody
    3 KB (573 words) - 11:27, 21 July 2013
  • ...the UConn MOU for diamond radiator. It is in the hands of Jefferson Lab. Elton will check on it.
    6 KB (901 words) - 17:04, 24 February 2017
  • ...ke> Transmission: Report back on more transmission measurements (Shaun and Elton) </strike> # <strike> FCAL cover during solenoid tests (Elton and John) </strike>
    6 KB (852 words) - 17:07, 24 February 2017
  • # Elton to send a request to the computing center to load Java version 7 update 25
    3 KB (413 words) - 21:12, 6 August 2013
  • # <strike> FCAL plexiglass pane drawings upload (Elton) </strike> [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid ''Attendees: Alam, Elton, Beni (JLab); Will, Hayk, Serguei (USM); Shaun (UofR); Matt (IU); George (A
    3 KB (487 words) - 16:51, 24 February 2017
  • ''Attendees: Elton, Mark, Simon, Adesh, Curtis, Will, Jon, Andrei (JLab); Sean (NW); Ahmed (Re ###* Elton: Is the new computer up and running? Not yet, they need to transfer the own
    8 KB (1,246 words) - 13:57, 7 April 2016
  • * Elton Smith - ''eltonssmith'' ...e for a while this morning at 9:00am but nobody connected for the meeting. Elton had a doctor's appointment so he couldn't make it either. Did I get the tim
    2 KB (379 words) - 15:05, 19 August 2013
  • * Elton Smith - ''eltonssmith'' Attendees: ''David L., Elton S., Rory M.''
    2 KB (343 words) - 15:45, 19 August 2013
  • * Calorimetry: Elton
    2 KB (205 words) - 12:04, 2 February 2016
  • ''Attendees: Ilya Larin, Beni, Elton, David, Yi, Dan B., Alam (JLab); Shaun, Zisis (UofR); George V. (Athens); M #* Elton: UVT acrylic sheets arrived from Eljen and are stored in the ESB. They requ
    5 KB (795 words) - 12:38, 14 March 2017
  • * Elton Smith - ''eltonssmith''
    961 B (123 words) - 08:19, 5 September 2013
  • ''Attendees: Elton, Beni (JLab); Shaun, Giovanni Alcocer (new graduate student), Zisis, Andrei ##* Elton: Expectations are based on beam test data, so they probably effectively inc
    5 KB (710 words) - 17:13, 24 February 2017
  • - As indicated by Elton, after the BCAL was inserted in the magnet, it might be down w.r.t. the mag
    3 KB (577 words) - 18:24, 12 September 2013
  • * 15:20 Session II: Experiment --- Chair: Elton Smith ...B/ShowDocument?docid=2301 Working group on the target and photon source]: Elton Smith
    3 KB (433 words) - 17:13, 24 February 2017
  • # Progress in MOUs, contracts and procurement (Elton/Curtis)
    695 B (90 words) - 17:44, 3 October 2013
  • ...subsystems are ready, some have not been decided yet. Beni proposed to ask Elton to explain their plans on the next FDC meeting so that we can synchronize o
    4 KB (676 words) - 18:04, 19 September 2013
  • ''Attendees: Will L., Curtis (CMU), David, Elton, Beni (JLab), George Vas. (Athens), Andrei, Giovanni, Zisis (Regina)''
    2 KB (241 words) - 13:47, 15 October 2013
  • * Elton Smith (Hall D Staff)
    4 KB (502 words) - 10:53, 30 September 2013
  • ''Attendees: Elton, David, Alam, Beni, John, Dan, Yi (JLab); Sean (NW); Matt (IU); Zisis, Shau ##* Sean: Should we use the gain as an indicator of dead channels? Elton: Should have an additional quality factor for each channel
    4 KB (669 words) - 16:57, 22 October 2013
  • ''Attendees: Elton, Dave, Beni, Yi, Alam (JLab); Will (CMU); Sean (NW); Matt (IU); Zisis, Andr #* Elton: Notes that Orlando Soto (from USM) is being invited to JLab, has his visa,
    5 KB (780 words) - 17:12, 24 February 2017
  • # [https://logbooks.jlab.org/entry/3360082 Fcal response to charged tracks] (Elton)
    2 KB (234 words) - 16:15, 30 November 2015
  • ''Attendees: David, Elton, Yi, Beni (JLab), Andrei, Giovanni, Zisis (Regina)''
    4 KB (672 words) - 13:12, 31 March 2015
  • * Elton Smith - ''eltonssmith'' Attendees: Rory M., David L., Elton S.
    2 KB (327 words) - 09:33, 17 October 2013
  • ''Attendees: Elton, Mark (Jlab), Curtis, Will, Mike (CMU), George (Athens), Ahmed, Noemi, Zis ## Elton's email: ongoing conversation; solicit input by email. This could pipe info
    6 KB (914 words) - 13:01, 7 January 2016
  • * Elton Smith - ''eltonssmith'' Attendees: Rory M., David L., Elton S.
    2 KB (289 words) - 10:57, 31 October 2013
  • ## π<sup>0</sup> calibration. (Elton S.) **[https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2900 Bcal] (Elton)
    22 KB (3,414 words) - 16:27, 26 November 2018
  • * Present: Richard J., Alex S., Michael D., Nathan S., Franz K., Eugene C., Elton S., Curtis M, and James M.
    964 B (137 words) - 12:50, 4 January 2016
  • ...ike> Investigate room for mounting an external counter above the solenoid (Elton). </strike> ''Attendees: Zisis, Andrei, Shaun, Giovanni (UofR); Sean (NW); Elton, Beni, Alam, David, Yi (JLab); Matt (IU); Will (USM); Will (CMU)
    5 KB (734 words) - 18:44, 20 November 2013
  • # [[Beam Commissioning Plan]] Reviews Sequence (Elton) Elton: Presented the various steps and safety reviews needed to commission the b
    5 KB (818 words) - 06:26, 1 April 2015
  • Present: Richard Jones, James McIntyre [UConn] and Elton S., Alex D., Hovannes E., Mike M., Eugene C.[Jlab] <br> # Elton is away July 17-18 and July 30-Aug 6.
    3 KB (435 words) - 14:19, 23 June 2014
  • ...construction. Zisis proposed that the Regina students (helped by Mark and Elton) will gradually populate thd ccdb with conditions and calibration parameter ...ect the 3.75 deg rotation, implement changes and rerun. We will convey to Elton the need to run cosmics data nightly and on weekends, as we will need adequ
    5 KB (812 words) - 12:54, 27 June 2014
  • ...lex S., Natalie W., Yi Q., Nathan S., Jarrod F., Todd S., Ivan T., Tim W., Elton S. # [[Beam Commissioning Plan]] - ''Elton''
    5 KB (818 words) - 16:54, 24 February 2017
  • ''Attendees: Elton, David, Yi, Beni, Mark (JLab), Will (CMU), Andrei, Zisis (Regina)'' ...e (e.g. as a result of Andrei's curvature (E,theta) table and philosophy)? Elton suggested that we first assemble the complete picture of the number of cons
    4 KB (629 words) - 11:42, 11 December 2013
  • # Barrel Calorimeter (BCAL) - Elton Smith # Forward Calorimeter (FCAL) - Elton Smith
    687 B (98 words) - 10:20, 14 November 2013
  • * Elton Smith - ''eltonssmith'' Attendees: ''Rory M., Sean M., Ali, Megan, Elton S., Mark I., David L.''
    3 KB (424 words) - 15:41, 14 November 2013
  • Present: Elliott W, Simon T, Yi Q, Serguei P, Bryan M, Mark D, Elton S, William G, Beni Z, Alex S, Sean D, Hovanes E, Curtis M, Mark I, Dave L,
    6 KB (988 words) - 01:13, 1 April 2015
  • ...sit raw data format for Flash-250 MHz following Flash-125 MHz discussion. (Elton to send out info before next meeting) </strike> Links added to meeting agen ''Attendees: Yi, Alam, Elton, John, David (JLab); Zisis, Shawn, Andrei (UofR)
    5 KB (716 words) - 17:12, 24 February 2017
  • ...rs for cosmics running - [http://gluex.phys.uregina.ca/photos photos] from Elton ...re was some discussion of adding scintillator paddles for cosmics running. Elton's photos showed enough room for paddles both below the magnet and between t
    3 KB (447 words) - 14:25, 31 March 2015
  • Participants: Bill, Dave, Nick, Chris, Simon, Vlad, Beni, Elton, Hovanes (for the LV control discussions) and Lubomir.
    4 KB (763 words) - 00:48, 1 April 2015
  • # [[Beam Commissioning Plan]] Reviews Sequence (Elton)
    2 KB (222 words) - 14:52, 31 March 2015
  • ''Attendees: Elton, Mark (Jlab), Curtis, Will, Mike (CMU), George (Athens), Ahmed, Noemi, Zis ## Elton's email: ongoing conversation; solicit input by email. This could pipe info
    6 KB (914 words) - 18:16, 7 January 2016
  • ...resent at the meeting were: Elliott W, Bryan M, Curtis M, Dave L, Mark I, Elton S, Graham H, Sean D, Justin S, Eugene C, Yi Q, Simon T, Hovanes E, Serguei
    9 KB (1,461 words) - 17:13, 24 February 2017
  • ...Brendan P., Richard J., James M., Hovanes E., Nathan S., Tim W., Todd S., Elton S., Dave M., Bill C., Ivan T., Natalie W., Franz K., Yi Q., Alex S., Mike D
    1 KB (170 words) - 17:06, 24 February 2017
  • ...ave started work on the BCAL. Zisis will recheck all numbers and reply to Elton by early January. John is presumably doing the same for the FCAL.
    4 KB (595 words) - 11:53, 8 January 2014
  • Present: Elliott W, Bryan M, Curtis M, Dave L, Mark I, Graham H, Elton S, Sean D, Justin S, Yi Q, Eugene C, Simon T, Hovanes E, Serguei P, Mark D,
    7 KB (1,064 words) - 06:33, 1 April 2015
  • # [[Beam Commissioning Plan]] Reviews Sequence (Elton) Elton: next week will attend the Hall A beam commissioning review to understand
    4 KB (683 words) - 11:35, 31 March 2015
  • * Elton Smith - ''eltonssmith''
    1 KB (157 words) - 15:11, 5 December 2013
  • #* Green button (Elton)
    1 KB (150 words) - 16:46, 29 March 2016
  • # [[Beam Commissioning Plan]] Reviews Sequence (Elton)
    2 KB (225 words) - 02:55, 1 April 2015
  • * Elton Smith - ''eltonssmith'' Attendees: ''David L., Elton S., Rory M., Sean M., Ali R.''
    2 KB (208 words) - 12:40, 7 January 2014
  • ...lab.org/doc-private/DocDB/ShowDocument?docid=2464 Commissioning Plans] --- Elton Smith .../DisplayMeeting?sessionid=484 Tracking] - (Organizer: Beni Zihlman) Chair: Elton Smith
    10 KB (1,231 words) - 12:38, 14 March 2017
  • Attendees: ''David L., Elton S., Cody D., Fernando B., Ed J., Chris C., Curtis M., Naomi J., Beni Z., Ha
    3 KB (450 words) - 17:12, 24 February 2017
  • ...ge Voulgaris, George Vassileiadis, Pavlos (Athens), Sean (NWU), David, Yi, Elton, Eugene, Mark D., John (JLab), Andrei, Zisis (Regina)'' ...It will be a controlled document that needs to be signed off by Eugene or Elton. Input for the FCAl is needed from John/Matt.
    5 KB (738 words) - 17:12, 24 February 2017
  • .../mailman.jlab.org/pipermail/halld-cal/2014-January/000857.html see e-mail] Elton) ''Attendees: Fernando, Yi, David, Elton, Mark, Sasha, Eugene, Beni, Orlando (JLab); Shawn, Zisis, Andrei (UofR); Ch
    6 KB (943 words) - 13:34, 30 January 2014
  • David noted that Elton mentioned a conversation he had with Fernando which did not seem consistent
    2 KB (289 words) - 17:04, 24 February 2017
  • # Updates: not much progress has occurred on the calibration effort. Elton has submitted comments on the BCAL document (GlueX-doc-2379) and Sean has r ## Hovannes needs input on the BCAL interlock conditions. Elton has made a draft of these and further input is sought.
    3 KB (396 words) - 20:12, 7 February 2014
  • #* BCAL - Questions from Elton
    805 B (102 words) - 12:07, 30 January 2014
  • * Elton Smith - ''eltonssmith''
    1 KB (170 words) - 07:48, 28 January 2014
  • ''Attendees: Elton, John, Mark (JLab); George, Pavlos, Stratos (Athens); Shaun, Andrei (UofR);
    4 KB (631 words) - 10:05, 17 February 2014
  • ...Alex B., Ann Marie C., Brendan P., Nathan S., Tim W., Alex D., Eugene C., Elton S., Jarrod , Alex S., Curtis M., Dan S., Franz K., and Mike D.
    1 KB (180 words) - 16:53, 24 February 2017
  • Attending: Sean (NU); Simon, Beni, Kei, Nathan, Mark I., Will M., Sasha S., Elton, Will L., David L., Sergey F., Mike S. (JLab); Matt S. (IU); Curtis, Paul,
    9 KB (1,425 words) - 17:12, 24 February 2017
  • ...ment?docid=2379|Calibration document], [[Calibration_20140212_BCALComments|Elton's Comments]] #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1702 Elton's study on pi0 and eta statistics]
    4 KB (655 words) - 16:54, 24 February 2017
  • From: Elton Smith <elton@jlab.org> Thanks, Elton.
    4 KB (618 words) - 15:04, 11 February 2014
  • # Progress in MOUs, contracts and procurement (Elton/Curtis)
    1,010 B (130 words) - 11:25, 31 March 2015
  • Elton will talk to Ben to learn the details of the 1495 input/output
    901 B (133 words) - 10:29, 31 March 2015
  • * Elton Smith - ''eltonssmith'' Attendees: ''David L., Mark D., Mark I., Elton S., Rory M.''
    2 KB (351 words) - 08:46, 11 March 2014
  • <td> Elton Smith, Zisis Papandreou</td>
    2 KB (283 words) - 10:25, 20 August 2014
  • ''Attendees:Elton, John, Manuel, Yi (JLab); Christina, Pavlos (Athens); Shawn, later joined b #* (Elton) The FDC is presently being pushed into the solenoid in preparation for the
    5 KB (767 words) - 13:31, 13 March 2014
  • ...econstruction [https://logbooks.jlab.org/entry/3360676 Log Entry 3360676] (Elton) ...r corrections [https://logbooks.jlab.org/entry/3361053 Log Entry 3361053] (Elton)
    6 KB (864 words) - 12:40, 14 March 2017
  • Attending: Sean (NU); Simon, Eugene, Elton, Mark I., Justin, Nathan, Alex B., Luke, Lubomir, Paul M. (JLab); Curtis, M
    6 KB (892 words) - 17:13, 24 February 2017
  • * Elton pointed out that motors in the hall need to be on UPS as well to be able to * Elton suggested that Orlando show the GUIs to Indiana group for feedback.
    3 KB (544 words) - 09:37, 20 March 2014
  • Participants: Elton, Fernando, Dave, Chris, Bill, Beni, and Lubomir. ...then the other detectors are not ready for installation. After the meeting Elton discussed this with Tim: we are behind the schedule and more delays will ma
    4 KB (725 words) - 06:05, 1 April 2015
  • * Elton Smith - ''eltonssmith'' Attendees: ''David L., Elton S., Bobby Smyth, Mahbub K., Tim W., Dave M., Mark D., Eugene C., Beni Z., R
    2 KB (308 words) - 22:07, 23 March 2014
  • ...plan for cosmic-ray testing including external counters (Zisis) </strike> Elton, Mark, Zisis and Will have a working system now using the Qweak counters. ''Attendees: Elton, John, Mark, David, Ilya Larin, Yi (JLab); Christina, Pavlos, George (Athen
    6 KB (908 words) - 12:38, 27 March 2014
  • * Suggested modifications to BCAL and FDC voltage software (Elton, others) * There was a request to change the button labels to adhere to Elton's convention.
    4 KB (679 words) - 08:54, 2 April 2014
  • * Elton Smith - ''eltonssmith'' Attendees: ''David L., Elton S., Rory M.''
    2 KB (324 words) - 16:23, 27 March 2014
  • ## Zisis got the construction stuff together for the BCAL NIM. Elton gathering SiPMs. Zisis will do outline. Use Mike's share latex -- Mike wi ''Attendees: Elton, Simon, Mark (JLab), Curtis, Will M, Christina (Athens), Mike S (CMU), Tega
    6 KB (946 words) - 12:39, 14 March 2017
  • ''Attendees: Elton, John, Will, Yi, David, Mark (JLab); Shaun, Andrei, Zisis (UofR); Matt (IU) ## David: Asked if BCAL has seen the frozen FADC values. Elton: No, but we have taken very little data.
    5 KB (750 words) - 09:28, 11 April 2014
  • ...s M., Franz K., Dan S., Sascha S., Alex D., Tim W., Natalie W., Nathan S., Elton S., Bill C., Jarrod F., Hovanes E., and Mike D.
    1 KB (194 words) - 17:12, 24 February 2017
  • Present: Dave, Mark S., Scot, Orlando, Hovanes, Elton, Nerses * Buttons need to be change to match Elton's convention .
    3 KB (527 words) - 11:36, 10 April 2014
  • * BCAL: Check max ratings for MPPCs (Elton). ''Attendees: Elton, John, Yi, Andrei, Will, David (JLab); Shaun (UofR); Christina, George, Pav
    5 KB (866 words) - 13:49, 24 April 2014
  • ...Dan S., Alex S., Natalie W., Nathan S., Bill C., Eugene C., Yi Q., Tim W., Elton S., and Mike D.
    1 KB (170 words) - 17:06, 24 February 2017
  • Present: Nerses, Orlando, Elton, Dave B., Hovanes, Scot, Mark S., Mike, Beni * According to Elton for the BCAL bias voltage readbacks 10mV is a good number and 0.1V for LVs
    2 KB (330 words) - 16:23, 30 April 2014
  • - Elton is working on the ESAD document and we are responsible for the FDC and the
    5 KB (877 words) - 11:04, 18 April 2014
  • ''Attendees: Elton, Simon, Adesh, Mark (JLab); Curtis, Mike, Will (CMU); Ahmed, Andrei, Zisis, ##* Elton: Has he looked at any of the production data? No, for the moment they are t
    6 KB (892 words) - 12:40, 21 April 2016
  • * BCAL: Check max ratings for MPPCs (Elton). ''Attendees: Manuel, Laura, Shayne, Will, Mark, Zisis, Elton, John L., David, Yi (JLab); Andrei, Tegan (UofR), Matt (IU).
    5 KB (752 words) - 20:31, 8 May 2014
  • ...2014-May/000269.html EPICS voltage GUIs have been updated] to comply with "Elton's convention".
    617 B (78 words) - 09:36, 1 May 2014
  • * <strike> BCAL: Check max ratings for MPPCs (Elton) </strike> See [https://mailman.jlab.org/pipermail/halld-cal/2014-May/00090 ...); Pavlos, George (Athens); Zisis, Teigan and Andrei (UofR); Manuel, John, Elton, Will, Shayne, Zach, Jon, Laura, David (JLab)
    5 KB (739 words) - 01:50, 23 May 2014
  • Present: Dave, Mike, Nerses, Vanik, Orlando, Beni, Elton
    1 KB (182 words) - 10:25, 28 May 2014
  • | Elton Smith || align=center | 269-7625 || align=center | May 20, 2014
    5 KB (834 words) - 07:36, 21 May 2014
  • ''Attendees: Manuel, Zach, Shayne, Laura, Yi, Mark, David, Elton (JLab); Zisis, Tegan (UofR); Christina, Stratos, George (Athens) #* Users Meeting this week. Elton has also been elected as a member at large of the UGBOD.
    5 KB (812 words) - 11:37, 6 June 2014
  • ''Attendees: Elton, Will M., Laura, Shayne (JLab), Andrei, Tegan, Zisis (Regina)'' # Announcements: The HallD staff has moved to the A-wing. Elton's office is A108.
    3 KB (470 words) - 12:00, 28 May 2014
  • # <strike> Send light guide geometry to Irina for use in simulations (Elton). </strike> ''Attendees: Mark, Elton, Jon, Zach, Yi (JLab);
    5 KB (860 words) - 15:32, 19 June 2014
  • ...rd J., Brendan P, James M., Alex S., Natalie W., Nathan S., Jarrod, Yi Q., Elton S., Todd S., Eugene C., Jacob K., Curtis M., Bill C., Dan S., Chris G., and
    1 KB (151 words) - 17:12, 24 February 2017
  • ### Documentation, Procedures and Training [Elton]
    3 KB (355 words) - 06:10, 1 April 2015
  • # Clarify precisely what pulses result in under and overflow values (Elton)
    1 KB (221 words) - 13:41, 19 June 2014
  • ...te/DocDB/ShowDocument?docid=2518 Documentation, Procedures and Training] - Elton Smith
    2 KB (196 words) - 16:51, 24 February 2017
  • - Curtis prepared (Elton requested) a draft of a commissioning plan for the CDC (linked above). Lubo
    5 KB (915 words) - 17:12, 24 February 2017
  • ...J., Brendan P, James M., Alex B., Alex S., Nathan S., Franz K., Jarrod F., Elton S., Tim W., Michael D., Dan S., Curtis M., and Natalie W.
    1 KB (183 words) - 16:50, 24 February 2017
  • ''Attendees: Elton, Mark D., Will M., Laura, Shayne (JLab), Andrei, Zisis (Regina)'' # Action Items: We reviewed the list of student tasks drafted by Elton and Zisis (April 30 email).
    4 KB (690 words) - 19:24, 29 July 2014
  • ...AL LED pulser & cosmic data that they are taking, under the supervision of Elton and Mark D. These data will be compared against the standard HDGeant simul
    5 KB (739 words) - 17:05, 24 February 2017
  • ...B., Alex S., Alex D., Jarrod F., Michael D., Dan S., Curtis M., Jacob K., Elton S., and Eugene C., Chris D.
    1 KB (180 words) - 17:10, 24 February 2017
  • * Attending: Elton, Eugene, Alexandre, Sasha (Hall D); Mike McCaughan, Todd Satogata (Accelera
    4 KB (578 words) - 06:51, 1 April 2015
  • * <strike> Organize preparations for review (Elton). </strike> See minutes ''Attending:'' Elton, Alexandre, Hovanes, Eugene, Sasha (Hall D); Todd, Michael (Accelerator)
    4 KB (571 words) - 17:22, 31 March 2015
  • ...ges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Alexandre for Hall D) ''Attending: Elton, Alexandre, Hovanes, Eugene, Sasha (Hall D), Mike (Ops); Curtis (CMU); Rich
    5 KB (659 words) - 06:20, 1 April 2015
  • ...Alex B., Alex S., Nathan S., Matt B., Tim W., Curtis M., Jacob K., Alex D, Elton S., Dan S., Franz K., Natalie W., and Chris D.
    1 KB (171 words) - 11:33, 31 March 2015
  • ''Attendees: Manuel, Elton, Mark, Will, Laura, Shayne (JLab); Andrei (UofR); Sean (NW); Matt (IU)
    6 KB (898 words) - 01:13, 1 April 2015
  • ...ges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D) ...next week. Talks should be made available for comments early in the week. Elton will post them at noon on Thu.
    3 KB (408 words) - 06:33, 1 April 2015
  • ...reported on Tuesday's meeting between JLab and Regina, taking advantage of Elton's presence. All students are proceeding with their projects. Laura and Sh
    5 KB (775 words) - 00:14, 1 April 2015
  • #* BCAL Hadronic Energy & Efficiency: Elton #* Triggering Efficiency: Alex S., Justin, Elton
    4 KB (565 words) - 14:57, 14 June 2016
  • ''Attendees: Elton, Mark D., Will M., Laura, Shayne (JLab), Andrei, Zisis (Regina)'' ## Elton reported that the magnet is being cooled - it is at 8 K and over next week
    4 KB (707 words) - 19:44, 29 July 2014
  • Attending: Sean (NU); Simon, Lubomir, Mark I., Beni, Manuel, Mike S., Eugene, Elton, Mark D. (JLab); Curtis (CMU); Justin (MIT); Volker, Paul, Sasha, Aristeidi
    10 KB (1,640 words) - 23:37, 31 March 2015
  • ...ges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D) ''Attending: Elton, Alexandre, Hovanes, Eugene (Hall D); Pavel, George (RadCon); Todd (CASA);
    6 KB (887 words) - 06:22, 1 April 2015
  • ''Attending: Javier Gomez (Physics); Elton Smith, Alexandre Deur, Hovanes Egiyan, Eugene Chudakov (Hall D); Richard Jo == Notes by Elton ==
    2 KB (297 words) - 18:31, 8 August 2014
  • ''Attendees: Elton, Manuel, Will, Laura, Shayne, Mark (JLab); Tegan, Zisis, Andrei (UofR); Sea #* Elton: Estimate number of events needed to calibrate the BCAL using this software
    5 KB (805 words) - 06:53, 15 August 2014
  • ...ges of parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D) ''Attending: Elton, Eugene, Tim, Hovanes, Alexandre (Hall D); George, Pavel (RadCon); Michael
    5 KB (749 words) - 09:14, 21 August 2014
  • ''Attendees: Manuel, Elton, Will, Mark (Jlab); Zisis, Teagan (UofR); Christina (Athens); Matt (IU) ## Elton: Should investigate whether the inventory data base is a good match to trac
    6 KB (892 words) - 17:00, 24 February 2017
  • ...lie W., Alex B., Alex D., Nathan S., Eugene C., Kei M., Sascha S., Tim W., Elton S., Richard J., James M., Franz K., and Brendan P. ....uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.''
    2 KB (245 words) - 03:04, 1 April 2015
  • ...eeting?sessionid=507 Calorimetry] - (Organizer: Zisis Papandreou) - Chair: Elton Smith
    9 KB (1,171 words) - 12:38, 14 March 2017
  • ...ible to reduce the filed on the PMTs. Actually, after the meeting Beni and Elton were able to get signals from the scintillator (after increasing the HV) an
    5 KB (831 words) - 03:23, 1 April 2015
  • ...configuration for the fall running, including all shielding. (Tim, Chuck, Elton) * <strike> Circulate the updated version of ICD (Elton) </strike>
    5 KB (724 words) - 18:18, 3 September 2014
  • ...rmine the effect of the mis-placing ch 0-8 of SiPM in downstream modules. (Elton) # Add iron shields to top cosmic-ray counters (Elton)
    5 KB (758 words) - 17:12, 24 February 2017
  • ...Alex Barnes, Mark Dalton, Mark Ito (chair), David Lawrence, Will McGinley, Elton Smith, Mike Staib, Simon Taylor Elton argued that style (1) leads to confusion in the long term since the "true m
    6 KB (934 words) - 11:35, 31 March 2015
  • ....uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.''
    2 KB (257 words) - 04:15, 1 April 2015
  • ...cid=2624 Using AmpTools to Generate and Fit Double Slit Diffraction Data] (Elton Smith)
    1 KB (154 words) - 17:04, 24 February 2017
  • | 7 || 65 cm || 2014-11-07 05:00 || 2014-11-11 11:00 || Elton Smith
    2 KB (364 words) - 20:19, 10 May 2015
  • ...configuration for the fall running, including all shielding. (Tim, Chuck, Elton) ''Attending: Elton, Alexandre, Eugene, Hovanes, Tim, Glenn (Hall D); Pavel (RadCon); Richard (
    5 KB (671 words) - 17:59, 10 September 2014
  • ''Attendees: David, Elton, Will M., Irina, Andrei (JLab), Will L. (CMU), Justin (MIT), Tegan, Zisis''
    5 KB (842 words) - 12:17, 22 September 2014
  • ...configuration for the fall running, including all shielding. (Tim, Chuck, Elton) ''Attending: Elton, Eugene, George, Sasha, Alexandre (JLab); Richard, James (UConn); Curtis (C
    3 KB (471 words) - 17:50, 17 September 2014
  • ...rmine the effect of the mis-placing ch 0-8 of SiPM in downstream modules. (Elton) </strike> See meeting notes # Add iron shields to top cosmic-ray counters (Elton)
    7 KB (1,077 words) - 18:12, 25 September 2014
  • * 12/03/14: BCal report (Elton and Mark Dalton) [https://logbooks.jlab.org/entry/3309986 1st part: Pedesta
    9 KB (1,250 words) - 13:05, 8 July 2021
  • ...configuration for the fall running, including all shielding. (Tim, Chuck, Elton) ''Attending: Elton, Hovanes, Eugene, Tim, Alexandre (JLab); Pavel, George (RadCon); Michael (O
    5 KB (811 words) - 06:42, 9 October 2014
  • ...configuration for the fall running, including all shielding. (Tim, Chuck, Elton) ''Attending: Elton, Alexandre, Hovanes, Tim, Eugene, Nathan (Hall D); Michael (Ops); Curtis (C
    3 KB (388 words) - 17:50, 24 September 2014
  • ''Attendees: Mark D., Elton, Will M. (JLab), Will L. (CMU), Tegan, Andrei, Noemi, Zisis''
    5 KB (852 words) - 13:59, 16 October 2014
  • ...ran (NU); Mark I., Simon, Beni, Eric, Andrei S., Mike S., Mark D., Eugene, Elton, David L., Sergey F. (JLab); Curtis, Paul, Naomi (CMU); Matt (IU); Ahmed, N * Elton brought up the topic of how to treat the TDCs for discussion. The problem
    8 KB (1,331 words) - 18:02, 31 March 2015
  • # Add iron shields to top cosmic-ray counters (Elton) # Check into procedure for new MOUs (Elton)
    5 KB (843 words) - 06:39, 1 April 2015
  • ...g?sessionid=571 DAQ/Trigger/Electronics] - (Organizer:David L. ) Chair: - Elton Smith
    10 KB (1,251 words) - 12:40, 14 March 2017
  • ...configuration for the fall running, including all shielding. (Tim, Chuck, Elton) "Attending: Elton, Beni, Alexandre, Hovanes, Eugene (Hall D); Todd (CASA); Pavel (RadCon); Cu
    4 KB (648 words) - 10:48, 17 October 2014
  • # Add iron shields to top cosmic-ray counters (Elton) # Check into procedure for new MOUs (Elton)
    6 KB (982 words) - 06:35, 1 April 2015
  • ''Attendees: Mark D., Elton, Will M. (JLab), Will L. (CMU), Tegan, Andrei, Noemi, Zisis''
    2 KB (309 words) - 11:37, 30 October 2014
  • ...tics of the different triggers for all of the data. Sean pointed out that Elton has some code that could be used for this purpose, and will work with him t
    6 KB (944 words) - 17:13, 24 February 2017
  • #* BCAL Hadronic: Elton
    4 KB (663 words) - 11:05, 8 June 2016
  • # Add iron shields to top cosmic-ray counters (Elton) # Check into procedure for new MOUs (Elton)
    2 KB (316 words) - 04:15, 1 April 2015
  • ...Alex B., James M., Curtis M., Nathan S., Eugene C., Sascha S., Tim W., and Elton S.
    1 KB (188 words) - 13:07, 8 July 2021
  • ...ei M., Eugene C., Sascha S., Tim W., Natalie W., Franz K., Michael D., and Elton S.
    1 KB (212 words) - 17:06, 24 February 2017
  • "Will McGinley" <wmcginle@jlab.org>, Elton Smith <elton@jlab.org>,
    1 KB (210 words) - 11:44, 19 November 2014
  • # Add iron shields to top cosmic-ray counters (Elton) # Check into procedure for new MOUs (Elton)
    8 KB (1,186 words) - 17:22, 31 March 2015
  • # <strike> Check into procedure for new MOUs (Elton) </strike> Loan to UofR is being discontinued. Foreign MOUs are difficult t ''Attendees: Elton, Adesh, Manuel, Will, Mark (JLab); Zisis, Andrei (UofR); Matt (IU)
    6 KB (893 words) - 14:39, 18 December 2014
  • ''Attendees: Elton, Mark, Will M., Tegan (JLab), Will L. (CMU), Andrei, George Vasileiadis (At ...ion: Special meeting called at 2pm EST for later today do deal with this. Elton has a draft document (GlueX-doc-2618).
    5 KB (745 words) - 13:31, 12 December 2014
  • ...lldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2618 GlueX-doc-2618] (Elton) ''Attendees: David, Will, Elton, Mark (JLab); Zisis, Andrei (UofR); Sean (NW).
    2 KB (289 words) - 16:51, 24 February 2017
  • ...M., Curtis M., Kei M., Zisis P., Lubomir P., Eric P., Andrei S., Matt S., Elton S., ST, Justin S., Beni Z. ** Elton has been working on a draft document describing the BCAL calibration consta
    5 KB (747 words) - 16:54, 24 February 2017
  • Attending: Sean (NU); Simon, Paul, Mark I., Will M., Alex B., Justin, Nathan, Elton (JLab); Mahmoud (FIU); Naomi (CMU)
    6 KB (828 words) - 17:10, 24 February 2017
  • # <strike> FCAL VESDA system. Communicate with Dave Kausch (Elton, Manuel) </strike> Work is under way. ...x VME hardware and remove NIM electronics (Elton, Manuel, Adesh) </strike> Elton sent a communication to Orlando
    5 KB (796 words) - 17:12, 24 February 2017
  • * Present: Richard J., Brendan P., Alex B., Eugene C., James M., Elton S., Hovanes E., Alex S., Michael D., Nathan S., and Kei M.
    885 B (127 words) - 12:59, 22 December 2014
  • # Feedback to Elton - [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2618 Glue # Elton's low-level coefficients into ccdb - ask Sean Dobbs (Zisis)
    5 KB (816 words) - 16:48, 24 February 2017
  • ...; Curtis, Naomi (CMU); Kei, Simon, Paul, Nathan, Will M., Eugene, Mark I., Elton, Lubomir, Mark D., Adesh, Mike S. (Jlab); Matt S. (IU); Justin, Tegan, Noem * Elton posted a note summarizing the low-level BCAL constants. Sean is helping to
    11 KB (1,791 words) - 23:31, 31 March 2015
  • ''Attendees: Elton, Mark, Simon, Will, Ahmed (Jlab);Zisis, Tegan, Andrei (UofR); Sean (NW); Ge ## FCAL Update (update by Elton)
    7 KB (1,079 words) - 12:38, 14 March 2017
  • == <span style="color:red"> BCal </span> Elton == == <span style="color:red">Accelerator RF timing (Elton/Fernando)</span> ==
    16 KB (2,495 words) - 10:00, 19 March 2015
  • * 12/03/14: BCal report (Elton and Mark Dalton) [https://logbooks.jlab.org/entry/3309986 1st part: Pedesta
    9 KB (1,250 words) - 12:38, 14 March 2017
  • # Work with Hovanes to activate VME LED pulser setup for FCAL (Elton) ''Attendees: Elton, Will, Mark, Adesh (JLab); Matt (IU); Sean (NW); Tegan, Zisis (UofR); Chris
    6 KB (1,010 words) - 12:47, 26 March 2015
  • * Present: Richard J., Brendan P., Curtis M., Alex B., Eugene C., James M., Elton S., Alex S., Michael D., Tim W., Alex D., Nathan S., Eugene C., Franz K., a
    1 KB (210 words) - 12:38, 14 March 2017
  • ''Attendees: Elton, Will, Noemi, Mark (JLab); Zisis, Tegan, Ahmed, Andrei (UofR) ...ccelerator will start mid-Fed, Tagger Hall possible lock down on Feb. 20. Elton will schedule a walk-through on that date. Regina has bunched up all its sh
    6 KB (859 words) - 17:08, 24 February 2017
  • ...cid=2624 Using AmpTools to Generate and Fit Double Slit Diffraction Data] (Elton Smith) -- [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2
    1 KB (175 words) - 17:12, 24 February 2017
  • #* Gain calibration constants Up*Down and Up/Down (Elton) ''Attendees: Elton, Will, Noemi, Adesh, Manuel, Mark, Eugene (JLab); Zisis (UofR); Matt (IU);
    6 KB (960 words) - 13:49, 12 February 2015
  • ''Attendees: Adesh, Manuel, Elton, Will, Noemi, Ahmed (JLab); Zisis, Tegan (UofR); Matt (IU) ...ndo has replied to Elton with information on where to apply these changes. Elton needs to meet with Hovanes to discuss implementing the new changes. In the
    7 KB (1,103 words) - 14:54, 26 February 2015
  • ## Shower definitions, merging and inclusion of single-ended hits (Mark, Elton) ''Attendees: Mark D., Elton, Will M. (JLab), Will L. (CMU), Noemi, Tegan, Zisis (Regina)''
    6 KB (934 words) - 10:38, 10 April 2015
  • ...ntegral value A0 at which the correction is zero following a suggestion by Elton. This A0 is a calibration parameter in the database and will be set to the ...ntegral value A0 at which the correction is zero following a suggestion by Elton. This A0 is a calibration parameter in the database and will be set to the
    263 KB (29,186 words) - 15:01, 3 June 2015
  • # Work with Hovanes to activate VME LED pulser setup for FCAL (Elton) ## BCAL temperature, overbias settings (Elton)
    8 KB (1,197 words) - 12:39, 14 March 2017
  • ...Sean (NU); Simon, Kei, Adesh, Eric, Paul, Alex, Justin, Mahmoud, Mark I., Elton, Eugene, Mike S. (JLab); Curtis, Naomi (CMU); Zisis (Regina) ...OF hits only ~60-65% of the time due to the lack of updated calibrations. Elton suggested loosening some of the matching parameters, and Paul agreed to loo
    6 KB (1,021 words) - 15:00, 11 March 2015
  • ...mon, Kei, Paul, Lubomir, Will M., Alex B., Justin, Beni, Mike S., Mark D., Elton (JLab); Naomi (CMU); Noemi (Regina) ** Elton had been looking at some shower reconstruction, and one major issue he noti
    7 KB (1,198 words) - 13:50, 26 March 2015
  • # Work with Hovanes to activate VME LED pulser setup for FCAL (Elton). Note: Currently the system still works using the associated NIM electroni ''Attendees: Elton, Mark, Tegan, Adesh, Will, Manuel (JLab); Zisis, Andrei, Ahmed (UofR); Geor
    6 KB (912 words) - 18:39, 9 April 2015
  • ...Tracking Performance and Calibrations] - (Organizer: Naomi Jarvis) Chair: Elton Smith ...halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2703 BCAL Update] ''Elton Smith''
    9 KB (1,156 words) - 12:38, 14 March 2017
  • # Work with Hovanes to activate VME LED pulser setup for FCAL (Elton). Postpone till mid May, after current run. ''Attendees: Elton, Will, Mark (JLab); Tegan, Ahmed, Zisis (UofR), Adesh, Manuel, Matt (IU); G
    6 KB (848 words) - 16:55, 24 February 2017
  • # <strike> Take LED runs to check system (Elton and Noemi) </strike> # <strike> Investigate how to check efficiency vs DAQ thresholds (Elton) </strike>
    2 KB (284 words) - 17:22, 17 April 2015
  • ...Alex S., Kei M., Tim W., Alexandre D., Alex B., Nathan S., Eugene C., and Elton S.
    1,007 B (142 words) - 11:45, 13 April 2015
  • ''Attendees: Elton, Mark D., Sean, David, George V., Will M. (JLab), Will L. (CMU), Tegan, Ahm ## Elton reported that Noemi is working on the time-walk corrections, George V. on t
    4 KB (631 words) - 17:04, 24 February 2017
  • ...//logbooks.jlab.org/entry/3376980 FCAL/BCAL trigger energy distributions] (Elton)
    2 KB (224 words) - 16:43, 9 February 2016
  • ...Simon, Adesh, Lubomir, Justin, Paul, Eugene, Will M., Beni, Alex B., Eric, Elton, Mike S., Luke, Kei (JLab); Curtis (CMU) Elton reported that the efficiencies depend on many variables, including how diff
    9 KB (1,411 words) - 23:05, 22 April 2015
  • ...etup for FCAL (Elton). Postpone till mid May, after current run. </strike> Elton has been in contact Orlando and with Chris Williamson from the computer cen ''Attendees: Matt, Elton, Will, Mark, Manuel (JLab); Zisis, Tegan, Ahmed, Noemi (UofR); Christina, G
    6 KB (991 words) - 18:09, 7 May 2015
  • ...ld for a hit, Mark gave me a calculation that came out to 3.5 MeV. Later, Elton gave me the same calculation (with some different numbers) that came out to
    3 KB (414 words) - 12:22, 24 June 2015
  • ''Attendees: Christine, George (Athens), Elton, David, Mark D., Will M. (JLab), Noemi, Ahmed, Tegan, Zisis (Regina)'' ...2744/001/Toy_timewalk.pdf] Noemi is continuing her t-w investigation using Elton's toy pulse generation model, and specifically examining the stability of t
    4 KB (519 words) - 12:38, 14 March 2017
  • # <strike> Work with Hovanes to activate VME LED pulser setup for FCAL (Elton). </strike> Orlando has gotten his crypto card to work and will check into ''Attendees:Elton, Jon, Manuel, Adesh, Will, David (JLab); Christina, George (Athens); Zisis,
    7 KB (1,077 words) - 17:12, 24 February 2017
  • # [[Media:CPP_update_FCAL.pdf]] First look at FCAL energies (Elton)
    2 KB (227 words) - 09:46, 15 May 2015
  • ...tis, Naomi (CMU); Mahmoud (FIU); Simon, Kei, Beni, Nathan, Adesh, Mark I., Elton, Eric, Alex B., Fernando, Luke, Eugene, Mike S., Justin, Alex S. (JLab) Elton reported that Will is continuing his pi0 calibration studies, now looking a
    8 KB (1,328 words) - 11:20, 27 May 2015
  • ''Attendees: Elton, Matt, Mark, Adesh, Manuel, Will (JLab); George (Athens); Sean (NW); Noemi, ##* Elton: Should look at the pulse height variation of the widths.
    6 KB (928 words) - 17:11, 24 February 2017
  • ...Brendan P., Michael D., Kei M., Alexandre D., Alex B., Franz K., Alex S., Elton S., Hovanes E., and Nathan S.
    1 KB (155 words) - 12:05, 26 May 2015
  • * '''JLab''': Mark Ito (chair), David Lawrence, Paul Mattione, Kei Moriya, Elton Smith, Nathan Sparks, Justin Stevens, Simon Taylor
    6 KB (880 words) - 17:22, 1 June 2015
  • # [https://logbooks.jlab.org/entry/3360082 Fcal response to charged tracks] (Elton)
    2 KB (233 words) - 16:55, 17 November 2015
  • ''Attendees: Elton, Will M., Mark D. (JLab), Christina, George (Athens), Noemi, Ahmed, Tegan, ## Elton reminded us of the urgency in reconciling the BCAL and FCAL coordinate syst
    5 KB (839 words) - 12:56, 28 May 2015
  • # [https://logbooks.jlab.org/entry/3342470 FCAL energies] (Elton)
    2 KB (250 words) - 10:23, 29 May 2015
  • r17911 | elton | 2015-04-06 07:46:09 -0400 (Mon, 06 Apr 2015) | 1 line
    63 KB (8,001 words) - 15:00, 3 June 2015
  • ...e> Check with David L. regarding geometry inconsistencies noted by George (Elton) </strike> George completed work but will work with David on implementation ''Attendees: Manuel, Matt, Adesh, mark, Elton, Jon (JLab); Zisis, Tegan (UofR); George (Athens); Will, Mike, Curtis (CMU)
    5 KB (736 words) - 21:40, 2 July 2015
  • Present: Naomi (CMU), Cody, Elton, David, Beni (JLab) #Elton mentioned that the FA250 team are planning to revise their firmware and mig
    4 KB (630 words) - 17:11, 24 February 2017
  • ''Attendees: Elton, David, Mark D. (JLab), Christina, George, Stratos (Athens), Will M., Curti ## Cosmics: Elton mentioned that more comics runs have been acquired and that someone should
    5 KB (866 words) - 12:58, 11 June 2015
  • ...t at the next calorimetry meeting. [n.b. tomorrow's meeting is canceled]. Elton has also taken a look at using electrons for gain calibration, and Adesh is
    5 KB (866 words) - 12:19, 17 June 2015
  • ''Attendees: Elton, Mark (JLab), Will L., Will M. (CMU), Sean (NWU), Ahmed, Andrei, Noemi, Teg ...(cosmics to data). These are large but at least consistent between them. Elton: are these uniformly distributed across modules, are they near the edges?
    8 KB (1,173 words) - 12:39, 14 March 2017
  • ...t with some kind of Gantt chart like schedule. Justin will follow up with Elton who has used this software before.
    4 KB (690 words) - 07:41, 30 June 2015
  • #* Discussion on "What is the Soeding Model?" (Elton)
    2 KB (209 words) - 17:13, 24 February 2017
  • # Introduction (Elton) ''Attendees:Naomi, Will (CMU); Matt, Mark, Elton (JLab)
    4 KB (570 words) - 15:54, 30 June 2015
  • ...books.jlab.org/entry/3345534 Log Entry 3345534] Floating and integer sums (Elton) .../entry/3345636 Log Entry 3345636] Correlation coefficient between samples (Elton)
    6 KB (817 words) - 17:11, 24 February 2017
  • ...Matt, Kei, Mahmoud, Justin, Eric, Alex B., Fernando, Luke, Mark I., Paul, Elton, Mark D. * Elton reported that George is converging on some results for his studies of effec
    8 KB (1,280 words) - 17:34, 14 July 2015
  • ''Attendees: Elton, Mark, David (JLab); Tegan, Ahmed, Noemi (UofR); Will, Mike (CMU); Sean (NW ##* Noemi will send an e-mail to Mark and Elton with details so that we can better respond to the specifics
    8 KB (1,233 words) - 15:34, 9 July 2015
  • ''Attendees: David, Elton, Jon, Manuel, Mark, Adesh (JLab); Zisis, Ahmed (UofR); Sean (NW); Curtis, W ##* Elton: No pi0 peak is visible in the 500<E<600 MeV photon bin. Why not, and is it
    8 KB (1,241 words) - 15:24, 16 July 2015
  • ''Attendees: ''Elton, David (JLab); George (Athens); Curtis, Will, Mike (CMU); Sean (NW); Tegan, ...owers > 1 GeV). Found that they contribute between 5-8%, about double from Elton's early estimate. After verification of the effect, may wish to add these i
    5 KB (694 words) - 13:30, 23 July 2015
  • ...ntry/3346781 Log Entry 3346781] Estimates of peak: MC study of resolution (Elton) ...entry/3346042 Log Entry 3346042] Correlation coefficients between samples (Elton)
    4 KB (534 words) - 17:13, 24 February 2017
  • Elton looked at determining gains with electrons matched to the FCAL using data t
    11 KB (1,662 words) - 17:13, 24 February 2017
  • ''Attendees: Manuel, Jon, Adesh, David, Elton (JLab); Will, Mike (CMU); George, Christina (Athens); Zisis, Noemi, Ahmed, ##* Elton: Layer 4 will be complicated to understand. Suggest that the focus be on di
    7 KB (1,150 words) - 15:29, 30 July 2015
  • ...l D., Franz K., Dan S., Kei M., Nathan S., Alex B., Alex S., Alexandre D., Elton S., and Hovanes E.
    2 KB (251 words) - 12:20, 20 July 2015
  • ''Attendees: Elton, Simon, David, Mark (JLab), Will M, Mike (CMU), Noemi, Ahmed, Tegan, Zisis ...ining the 5 relevant t-w correction parameters (see Table 1 in doc 2618). Elton explained the procedure in using a<sup>0</sup><sub>jk</sub> to use a 'typic
    7 KB (1,050 words) - 12:40, 14 March 2017
  • Attending: Sean (NU); Simon, Kei, Mark I., Sebastian, Adesh, Brad, Elton, Alex B., Nathan, Lubomir (JLab); Curtis, Mike S., WIll M. (CMU) Elton reported that George is working on finalizing his results for the effective
    6 KB (937 words) - 17:12, 24 February 2017
  • ''Attendees: Mark Ito, Manuel, Zisis (online); Mark Dalton, Elton, Matt, Beni, Sasha, Serguei (JLab); ...th of each pulse in the window and integrate samples within those samples. Elton: This would require to output the pulse length in the data stream for pedes
    7 KB (1,016 words) - 16:52, 24 February 2017
  • ...logbooks.jlab.org/entry/3348237 Log Entry 3348237] Pedestal width studies (Elton) ''Attendees: Matt, Elton, Adesh (Jlab); Ahmed, Zisis, Tegan (UofR); Will McGinley, Curtis, Mike (CMU
    7 KB (974 words) - 17:12, 24 February 2017
  • ...endan P., Michael D., Franz K., Nathan S., Alex B., Alex S., Alexandre D., Elton S., and Eugene C.
    1 KB (167 words) - 16:58, 24 February 2017
  • ...rom_JLab._What_is_wrong.3F|'''Git versions on the JLab CUE''']]. Simon and Elton found some problems with specific versions of Git installed at JLab. Sugges
    11 KB (1,734 words) - 17:16, 6 August 2015
  • # F250 discussion: peak value into higher level objects (Elton) ...books.jlab.org/entry/3348881 Log Entry 3348881] First look at muon decays (Elton)
    6 KB (924 words) - 12:00, 20 August 2015
  • ...aul M., Will M., Curtis M., Kei M., Lubomir P., Eric P., Luke R., Matt S., Elton S., Mike S., Justin S., Nathan S., Adesh S., Simon T.
    4 KB (623 words) - 17:07, 24 February 2017
  • ''Attendees: Elton, Dave, Beni, Sergei, Matt, Eugene #* Elton: Our main pedestal noise is the high frequency sigma=1.2 counts seen in eve
    4 KB (655 words) - 16:54, 24 February 2017
  • # Consider developing data structures for the peak value (Elton: consult with David) ...e information to Curtis' document on performance for FCAL (Matt) and BCAL (Elton and Zisis)
    7 KB (1,035 words) - 17:05, 24 February 2017
  • # Software for Correcting for Pedestal Drifts (Elton) ...Barnes, Amber Boehnlein, Mark Ito (chair), David Lawrence, Paul Mattione, Elton Smith, Nathan Sparks, Justin Stevens, Simon Taylor, Beni Zihlmann
    10 KB (1,591 words) - 21:24, 22 August 2015
  • ## Muon decays (Elton) ''Attendees: Mark, Simon, Elton (JLab), Curtis, Will M. (CMU), George (Athens), Tegan, Noemi, Ahmed, Zisis
    6 KB (956 words) - 13:12, 3 September 2015
  • Attending: Sean (NU); Simon, Adesh, Paul, Kei, Alex B., Luke, Justin, Elton, Mark I. (JLab); Curtis, Will M., Naomi, Mike S. (CMU); Eric, Mahmoud (FIU) #* '''TAGM''' - Alex is working on the timewalk corrections. Elton pointed out that the scheme of obtaining timewalk corrections by plotting t
    6 KB (867 words) - 16:51, 24 February 2017
  • ...; some irregularities observed which he will discuss offline with Mark and Elton.
    5 KB (823 words) - 12:38, 14 March 2017
  • ...B., Dan S., Michael D., Nathan S., Alex B., Alexandre D., Alex S., Kei M., Elton S., and Eugene C.
    1 KB (167 words) - 16:54, 24 February 2017
  • ''Attendees: Elton (JLab); Andrew, Sean, Robert, Rory (UMass). #* Elton will send links to documentation
    3 KB (482 words) - 17:13, 24 February 2017
  • ''Attendees: Elton, David, Simon (JLab), Mike, Will M. (CMU), Christina, George (Athens), And ## Up/down gain ratios for spring data (Mark): Elton reported on Mark's behalf. Mark looked at up/down ratios from the spring da
    8 KB (1,246 words) - 12:39, 14 March 2017
  • ...mailman.jlab.org/pipermail/halld-cal/2015-September/001150.html email from elton] ''Attendees: Mark, Matt, Adesh, Eugene, elton (JLab), Sean (NWU), George (Athens), Curtis, Will M., Mike (CMU), Andrei,
    7 KB (1,078 words) - 15:38, 24 September 2015
  • ...Alex B., Alexandre D., Alex S., Hovanes E., Franz K., Dan S., Bill B., and Elton S.
    1 KB (197 words) - 16:51, 24 February 2017
  • ''Attendees: Mark, Elton, David (JLab), Will M., Curtis, Mike (CMU), Sean (NWU), George (Athens), A ## Elton: rain/hurricane at NN this weekend.
    9 KB (1,429 words) - 12:40, 14 March 2017
  • Attending: Sean (NU); Simon, Mark I., Kei, Elton, Justin, Eugene, Alex B., Nathan, Beni, Adesh, Matt S. (JLab); Curtis, Mike #* '''BCAL''' - Elton reported progress on several fronts:
    6 KB (872 words) - 15:10, 23 September 2015
  • # [https://logbooks.jlab.org/entry/3367636 Fcal response to charged tracks] (Elton)
    2 KB (233 words) - 14:31, 12 January 2016
  • ...nz K., Dan S., Bill B., Kei M., Eugene C, Glen Y., Mike McC., Matt S., and Elton S.
    2 KB (241 words) - 17:01, 24 February 2017
  • # [https://logbooks.jlab.org/entry/3352472 Fcal response to pions] (Elton)
    2 KB (250 words) - 15:49, 1 October 2015
  • # Michel electron simulations with threshold and conditions (Irina, Andrei, Elton, Will M.)
    2 KB (290 words) - 12:38, 14 March 2017
  • # [https://logbooks.jlab.org/entry/3352472 Fcal response to pions] (Elton)
    2 KB (238 words) - 16:06, 15 October 2015
  • ...mon, Lubomir, Eugene, Adesh, Nathan, Luke, Alex B., Mark I., Paul, Justin, Elton, Mark D. (JLab); Curtis, Mike S., Will M., Naomi (CMU); Brad (FSU); Mahmoud ...ng algorithm that are being investigated. This is a longer-term project. Elton updated his GlueX Note for the low-level calibration definitions to reflect
    6 KB (935 words) - 17:13, 24 February 2017
  • ''Attendees: Elton, Mark, Matt, David (JLab); Sean (NW); Will, Mike, Curtis (CMU); George (Ath ## Hadron response (Elton)
    6 KB (952 words) - 15:29, 22 October 2015
  • # [https://logbooks.jlab.org/entry/3354252 Fcal response to charged tracks] (Elton)
    2 KB (229 words) - 10:06, 22 October 2015
  • # Investigate response of TOF to hadron Fcal showers matched to DC tracks (Elton) .../entry/3358054 Log Entry 3358054] FCAL response to hadrons matched to TOF (Elton)
    7 KB (1,002 words) - 12:39, 14 March 2017
  • ...nz K., Dan S., Bill B., Kei M., Eugene C, Glen Y., Mike McC., Matt S., and Elton S.
    1 KB (183 words) - 12:39, 14 March 2017
  • # Michel electron simulations with threshold and conditions (Irina, Andrei, Elton, Will M.) ...s being turned to the Michel electrons. Andrei sent an email yesterday to Elton and Will to get details on the desired cuts for that analysis. Following t
    5 KB (722 words) - 12:11, 29 October 2015
  • # [https://logbooks.jlab.org/entry/3354252 Fcal response to charged tracks] (Elton)
    2 KB (226 words) - 14:23, 5 November 2015
  • ...Mike S., Will M., Naomi (CMU); Simon, Beni, Adesh, Lubomir, Alex B., Luke, Elton, Justin, Mark I., Nathan (JLab); Mahmoud (FIU) ...in shwoers. He will compare these to Mike's results from matched tracks. Elton and Beni pointed out that one has to be careful that the inclusion of the F
    6 KB (888 words) - 17:13, 24 February 2017
  • Attending: Sean, Simon, Mark I., Justin, Elton, Alex B., Zisis, Will M., Mike S.
    3 KB (532 words) - 13:06, 12 November 2015
  • * JLab: Adesh, Jon, Ahmed, Colleen, Tegan, Mark, Elton
    3 KB (489 words) - 12:26, 19 May 2016
  • ...NU); Mark I., Beni, Adesh, Alex B., Alexander A., Nathan, Justin, Mark D., Elton (JLab); Curtis, Naomi, Mike S., Will M., Luke K. (CMU); Matt S. (IU); Maria #* Elton asked about possibly including Ahmed's BCAL LED monitoring plugin. Sean su
    6 KB (948 words) - 16:53, 24 February 2017
  • Participants: Curtis, Naomi (CMU) Beni, Luke, Cody, Alexander A., Elton, Vlad, Sergey, and Lubomir (JLab). ...rdinate with the DAQ/trigger people when do we want to turn the crates on. Elton: we can turn on and use BCAL as trigger, but have in mind it usually takes
    5 KB (752 words) - 18:46, 19 May 2016
  • ...S., Alexandre D., Curtis M, Richard J., Brendan P., Michael D., Franz K., Elton S., Sascha S, and Eugene C.
    2 KB (303 words) - 11:19, 24 May 2016
  • #* BCAL Layer Efficiency (Hadronic): Elton, Paul #** Elton checked in updated versions of EPICS_dump and TRIG_online, which will be mo
    7 KB (983 words) - 11:01, 25 May 2016
  • Attending: Sean (NU); Simon, Elton, Paul, Mark D., Adesh, Eugene, Alex B., Justin, Alex A., Beni (JLab); Naomi
    5 KB (751 words) - 17:13, 24 February 2017
  • ''Attendees:Elton, Jon, Adesh (JLab); Curtis, Will (CMU); Christina, George (Athens); Sean (N
    5 KB (756 words) - 12:58, 2 June 2016
  • ''Attendees:Elton, Mark, Simon, Adesh, Jon (JLab); Will (CMU); Christina, George (Athens); An ##* Elton: Should check that the Fcal trigger is not biasing result. Sean: New REST f
    6 KB (880 words) - 09:57, 17 June 2016
  • ''Attendees: Elton, Jon, Adesh, Mark (JLab); Zisis, Ahmed, Andrei, Tegan, Colleen (UofR); Curt ##* Elton: From a practical view of calibrations, we should have a time-walk correcti
    7 KB (1,056 words) - 17:12, 24 February 2017
  • #* BCAL Hadronic Energy & Efficiency: Elton #* Triggering Efficiency: Alex S., Justin, Elton
    6 KB (893 words) - 10:18, 22 June 2016
  • ...books.jlab.org/entry/3411645 &pi;<sup>+</sup>&pi;<sup>-</sup> simulation] (Elton) Attendees: Rory M. (chair), David L., Elton S., Andrew S., Mark D., Ilia L., Serguei G.
    4 KB (627 words) - 19:32, 5 July 2016
  • #* BCAL Hadronic Energy & Efficiency: Elton #* Triggering Efficiency: Alex S., Justin, Elton
    2 KB (270 words) - 17:12, 24 February 2017
  • ...on, Paul, Beni, Alex A., Alex B., Adesh, Justin, Mark I., Mark D., Eugene, Elton (JLab); Mike S., Naomi (CMU)
    7 KB (1,074 words) - 17:13, 24 February 2017
  • * Turns out we purchased 194 PMTs altogether, but 4 of them were for Elton to use (on a non-TOF project). Thus the 190 for the TOF use is correct. One ...e at FSU. Paul Eugenio claims (via email) than an 8-stage tube was sent to Elton at some point.
    5 KB (805 words) - 16:14, 5 July 2016
  • ''Attendees: Elton, Mark, Adesh, Jon (JLab); Christina, George (Athens); Sean (NW); Will, Curt ...nt as a function of energy, where a downward trend in sigma/E is expected. Elton: Notes that if Sigma_pi is constant, then sigma/E improves faster than expe
    9 KB (1,449 words) - 17:11, 24 February 2017
  • #* BCAL Hadronic Energy & Efficiency: Elton #* Triggering Efficiency: Alex S., Justin, Elton
    4 KB (595 words) - 17:12, 24 February 2017
  • ...ocDB/ShowDocument?docid=3077 &pi;<sup>+</sup>&pi;<sup>-</sup> simulation] (Elton) Attendees: Rory M., Bobby J., Andrew S., Matt D., David L., Elton S., Tim W.
    7 KB (1,030 words) - 17:13, 24 February 2017
  • ...cDB/ShowDocument?docid=3077 GlueX-doc-3077] Processing rho->pi+pi- events (Elton
    2 KB (253 words) - 12:38, 14 March 2017
  • ...an (NU); Paul M., Simon, Adesh, Mark D., Justin, Alex A., Alex B., Nathan, Elton, Mark D., Lubomir (JLab); Curtis, Mike S., Will M. (CMU); Mahmoud (FIU) #* At yesterday's Analysis Meeting, Elton showed some interesting results which (among other things) indicated that t
    7 KB (1,003 words) - 17:10, 24 February 2017
  • ''Attendees: Elton, Mark, Adesh, Jon (Jlab); Matt (IU); Will, Curtis, Mike (CMU); George (Athe ##* Elton: Next step would be to refine timing width parameter in mcsmear using the p
    6 KB (864 words) - 12:38, 14 March 2017
  • ...Alex B. Nathan S., Justin S., Elton S., Richard J., Michael D., Franz K., Elton S., Sascha S, Tim W. and Eugene C.
    2 KB (243 words) - 12:38, 14 March 2017
  • #* BCAL Hadronic Energy & Efficiency (Elton)
    2 KB (239 words) - 12:38, 14 March 2017
  • ...ocDB/ShowDocument?docid=3077 &pi;<sup>+</sup>&pi;<sup>-</sup> simulation] (Elton)
    2 KB (241 words) - 09:46, 13 June 2017
  • ...tps://logbooks.jlab.org/entry/3414878 BCAL Hadronic Energy & Efficiency] (Elton)
    1 KB (190 words) - 13:07, 26 July 2016
  • ''Attendees:Elton, Jon, Mark, Adesh (JLab); Ahmed, Zisis, Colleen (UofR); Will, Curtis (CMU); ## Elton: The Compton Calorimeter CompCal is in being installed behind the Fcal. The
    6 KB (989 words) - 16:21, 25 August 2016
  • ...f his calibration of the BCAL TDCs. Andrei will communicate with Sean and Elton in order to integrate his improvements into sim-recon. Zisis will check wi
    8 KB (1,263 words) - 17:00, 24 February 2017
  • ...t: Alex D., Hovanes E., Alex S., Eugene C., Alex B., Nathan S., Justin S., Elton S., Richard J., and Michael D.
    1 KB (191 words) - 11:51, 17 August 2016
  • ...imon, Alex A., Adesh, Brad, Alex B., Nathan, Mark I., Paul, Beni, Mark D., Elton (JLab) #* Elton asked about Kaon ID performance. Paul and Sean mentioned that they see cle
    9 KB (1,336 words) - 17:14, 24 February 2017
  • ** BCal (Elton/Mark D.)
    19 KB (2,918 words) - 16:30, 26 November 2018
  • #* Elton: slide 3 has path length times beta; should it not be divide by beta? #* Elton: would George's quadratic term remove some of the variation seen on slide 6
    5 KB (775 words) - 14:12, 27 August 2016
  • ...id L., Alex D., Tim W., Mark D., Eugene C., Alex B., Nathan S., Justin S., Elton S., Richard J., Franz K., Curtis M., and Michael D.
    1 KB (149 words) - 11:37, 29 August 2016
  • ***Elton Smith: Dec. 16th-21st) ** BCal (Elton)
    21 KB (3,257 words) - 16:26, 26 November 2018
  • ''Attendees: Elton, Mark, Adesh, Jon (JLab); Sean (NW); Matt (IU); Curtis, Will (CMU); Zisis, ...the LED monitoring data during the run had periods of jumps by quadrants. Elton said that the distribution of the pulser signals is done by quadrant and th
    8 KB (1,229 words) - 17:00, 24 February 2017
  • Notes added by Elton (based on discussion at meeting)
    3 KB (463 words) - 17:13, 24 February 2017
  • ...splayMeeting?sessionid=667 Physics/Analysis II] - (Organizer: ) - Chair: - Elton Smith
    10 KB (1,276 words) - 12:38, 14 March 2017
  • ** Hadronic Energy & Efficiency (Elton) * Triggering Efficiency (Alex S., Elton)
    4 KB (567 words) - 12:38, 14 March 2017
  • Attending: Sean (NU); Simon, Adesh, Mark I., Elton, Luke, Alex A., Paul, Beni, Nathan, Eugene (JLab); Naomi, Mike S., WIll M. #* Elton reported that the solenoid was ramped up to 1350A and was running fine as o
    7 KB (1,017 words) - 17:13, 24 February 2017
  • ''Attendees:Elton, Mark, Adesh (JLab); Sean (NW); Zisis, Ahmed, Andrei (Regina); Matt (IU); W ## Status (Elton)
    7 KB (1,180 words) - 12:55, 22 September 2016
  • * Present: Michael D., Richard J., Franz K., Brendan P., Elton S., Alexandre D., Hovanes E., Nathan S., Eugene C., Tim W., and Curtis M.
    1 KB (176 words) - 11:35, 12 September 2016
  • ** Hadronic Energy & Efficiency (Elton) * Triggering Efficiency (Alex S., Elton)
    6 KB (842 words) - 16:12, 12 September 2016
  • ''Attendees:Matt (IU); Elton, Mark, Adesh (JLab); NW: Sean; Zisis, Andrei (UofR); Christina, George (Ath ...data to help in debugging. Adesh: Fcal is already pulsing data routinely. Elton and Mark: We can add pulser data for the Bcal as well.
    5 KB (752 words) - 12:38, 20 October 2016
  • ** Hadronic Energy & Efficiency (Elton) * Triggering Efficiency (Alex S., Elton)
    3 KB (408 words) - 16:07, 26 September 2016
  • * Present: Richard J., Dan S., Brendan P., Alex S., Elton S., Alex B., Alexandre D., Hovanes E., Nathan S., Eugene C., and Curtis M.
    2 KB (226 words) - 17:00, 24 February 2017
  • ''Attendees: Elton, Mark, Jon, Adesh, Mike (JLab); Christina, George (Athens); Will (CMU); Zis ##* Meeting (Adesh, Jon, Elton, Paul Smith, Chris) with Fernando and Matt tomorrow to go over procedures a
    7 KB (1,122 words) - 13:59, 3 November 2016
  • ** Hadronic Energy & Efficiency (Elton) * Triggering Efficiency (Alex S., Elton)
    4 KB (522 words) - 16:53, 24 October 2016
  • ...., Dan S., Brendan P., James M., Michael D., Thomas B., Franz K., Alex S., Elton S., Alex B., Alexandre D., Nathan S., Eugene C., and Curtis M.
    1 KB (163 words) - 11:36, 24 October 2016
  • Attending: Sean (NU); Simon, Adesh, Alex A., Eugene, Elton, Thomas, Mike S., Lubomir, Mark I., Beni, Alex B., Mark D. (JLab); Will M., ...as updated the calibrations in CCDB, and is ready to go for the next run. Elton & Mark D. asked about the TAGM time walk procedure, which is done relative
    8 KB (1,239 words) - 17:14, 24 February 2017
  • ** Hadronic Energy & Efficiency (Elton) * Triggering Efficiency (Alex S., Elton)
    3 KB (428 words) - 17:14, 7 November 2016
  • | &rho; || Elton, Carlos || style="background-color: blue;" | | BCAL Hit Efficiencies || Elton || Run (dead, efficiencies), &beta;, <strike>Z</strike> || Run (dead, effic
    18 KB (2,251 words) - 14:12, 11 April 2017
  • ...Brendan P., Alex B., Thomas B., James M., Alexandre D., Nathan S., Tim W., Elton S., Eugene C., and Curtis M.
    1 KB (172 words) - 12:44, 21 November 2016
  • ''Attendees: Elton, Jon, George, Adesh, Mark (JLab); Matt (IU); Christina (Athens); Curtis, Wi
    4 KB (654 words) - 15:11, 1 December 2016
  • ''Attendees: Elton, Jon, Mark (JLab); Zisis, Tegan (UofR); George, Christine (Athens); Curtis ...tina: 1) Consider using dE/dx from chambers to further identify electrons. Elton: pions will be difficult to distinguish from electrons in the chambers. 2)
    6 KB (917 words) - 14:39, 15 December 2016
  • ...Brendan P., Alex B., Thomas B., James M., Alexandre D., Nathan S., Tim W., Elton S., Eugene C., and Curtis M.
    1 KB (154 words) - 09:23, 19 December 2016
  • ''Attendees: Adesh, Marc, Elton, Jon (JLab); Zisis, Ahmed, Andrei (UofR); Matt (IU); Christina, George (Ath ...Fcal, d) number of bases on/off in test stand e) HV status of test bases. Elton: Suggest to record temperature and humidity at the same time.
    6 KB (901 words) - 17:11, 24 February 2017
  • ...halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3224 BCAL Update] - Elton Smith
    10 KB (1,269 words) - 12:38, 14 March 2017
  • * BCAL alarms in PLC (Hovanes, Nick, Elton)
    484 B (65 words) - 10:10, 19 January 2017
  • ...ke> Elton: check on new pedestal information in data stream. </strike> See Elton's [https://logbooks.jlab.org/entry/3451484 Log Entry 3451484] ''Attendees: Elton, Adesh, Jon, Eugene, Mark (JLab); George, Christine (Athens); Justin (W&M);
    6 KB (993 words) - 13:22, 26 January 2017
  • * BCAL alarms in PLC (Hovanes, Nick, Elton)
    510 B (70 words) - 10:10, 19 January 2017
  • * Talk presented by Elton Smith [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3195
    1 KB (150 words) - 17:12, 24 February 2017
  • # <strike> Elton: check on new pedestal information in data stream. </strike> ''Attendees: Elton, Adesh, Jon (JLab); George (Athens); Will (CMU); Ahmed, Tegan, Andrei, Zisi
    6 KB (914 words) - 13:01, 9 February 2017
  • Attending: Sean (NU); Alex A., Adesh, Nathan, Brad, Elton, Simon, Mark I., Beni, Alex B. (JLab); Zisis (Regina); Matt S. (IU); Will M ...ey should just depend on the difference in hit times between the two ends. Elton had some additional questions that he would ask offline.
    8 KB (1,204 words) - 17:04, 24 February 2017
  • ''Attendees: Elton, Zisis, Adesh, Mark (JLab); George, Georgios, Christina (Athens); Will, Cur ##* Elton suggested that we take some pulsing data at a fixed voltage (to avoid syste
    7 KB (1,105 words) - 18:43, 23 February 2017
  • ...b: Eugene, Thomas, Mark D., Mark I. Sasha, Beni, Justin, Alexandre, David, Elton, Sergey, Alex A.
    2 KB (210 words) - 17:54, 9 February 2017
  • # BCAL Hit Efficiencies --- Elton Smith
    7 KB (1,107 words) - 18:36, 1 March 2017
  • | &rho; || Elton, Carlos || style="background-color: blue;" | | BCAL Hit Efficiencies || Elton || Run (dead, efficiencies), &beta;, Z || Run (dead, efficiencies), &beta;,
    12 KB (1,508 words) - 14:12, 11 April 2017
  • ...ke> Update shift information for Fcal (Jon) </strike> Draft pages updated. Elton has provided comments. ...with Mark and Sean regarding status/plans for low level BCAL calibrations (Elton) </strike>
    11 KB (1,739 words) - 13:34, 9 March 2017
  • #* [https://logbooks.jlab.org/entry/3464181 MO phase drift] (Elton)
    12 KB (1,560 words) - 09:34, 8 March 2017
  • # BCAL Hit Efficiencies --- Elton Smith
    5 KB (699 words) - 14:11, 15 March 2017
  • ## [https://logbooks.jlab.org/entry/3467614 BCAL Hadronic Efficiencies] (Elton) ''Attendees: Elton, Jon, Mark, Adesh (JLab); Sean (NW); Will (CMU); George, Christina (Athens)
    7 KB (1,080 words) - 12:46, 23 March 2017
  • ...L Shower Efficiencies ([https://logbooks.jlab.org/entry/3467614 Link]) --- Elton Smith # BCAL Hit Efficiencies --- Elton Smith
    8 KB (1,156 words) - 12:04, 21 March 2017

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)