Search results

From GlueXWiki
Jump to: navigation, search

Page title matches

Page text matches

  • ...e L, Mark I, Elton S, Graham H, Sean D, Justin S, Eugene C, Yi Q, Simon T, Hovanes E, Serguei P, Mark D, Beni Z, Dave A, Vanik K.
    9 KB (1,461 words) - 17:13, 24 February 2017
  • * Present: Alex B., Ann Marie C., Brendan P., Richard J., James M., Hovanes E., Nathan S., Tim W., Todd S., Elton S., Dave M., Bill C., Ivan T., Natali
    1 KB (170 words) - 17:06, 24 February 2017
  • * Terminal servers and ROC setup - Bryan, Hovanes, Mark D * What should we use as the standard GCC compiler for the online cluster? - Hovanes, Dave L, Elliott
    7 KB (1,064 words) - 06:33, 1 April 2015
  • Counting House Infrastructure: (Hovanes) nothing new to report Control: (Elliott) Dave Butler continues to work on control system. (Hovanes) Controls will be ready for BCAL when it is ready to be powered.
    4 KB (683 words) - 11:35, 31 March 2015
  • ...Motion_Control_Applications#Collimator_table | Collimator table wiring]] - Hovanes, Mark S * Other EPICS progress - Hovanes
    3 KB (504 words) - 11:27, 31 March 2015
  • ...C., Yi Q., Bill C., Ivan T., Dan S., Franz K., Mike D., Tim W., Nathan S., Hovanes E., and Natalie W.
    1 KB (197 words) - 17:12, 24 February 2017
  • ...B/ShowDocument?docid=3016 Diamond alignment and beam stability controls] - Hovanes Egiyan
    10 KB (1,283 words) - 12:38, 14 March 2017
  • ....org/doc-private/DocDB/ShowDocument?docid=2467 Slow Controls Progress] --- Hovanes Egiyan
    10 KB (1,231 words) - 12:38, 14 March 2017
  • * Online database and web machines - Hovanes, Dave L, Elliott * EPICS update - Hovanes
    2 KB (324 words) - 01:13, 1 April 2015
  • ...t. Details, how to do this, were discussed at another meeting organized by Hovanes right after the FDC meeting.
    7 KB (1,144 words) - 01:06, 1 April 2015
  • Attendees: ''David L.(chair), Sascha S., Hovanes E., Mark D., Beni Z., Graham H., Dave A., Dmitry R., Mark I., Bryan M., Cur * Add a Controls talk by Hovanes
    4 KB (697 words) - 01:50, 1 April 2015
  • * UPS requirements for controls in Hall D (Dave, Yi, Hovanes) * GlueX collaboration meeting (Hovanes)
    3 KB (499 words) - 12:07, 10 February 2014
  • Mark raised the question that Hovanes has posed to the groups about whether there are any special considerations
    4 KB (623 words) - 18:17, 31 March 2015
  • ...will be copied into EPICS variables and alarms placed on those. (Mark and Hovanes will take care of these)
    3 KB (382 words) - 04:01, 1 April 2015
  • ...L.(chair), Sergey F., Graham H., Eugene C., Chris C., Sean D., Justin S., Hovanes E., Alex S., Sergey P.'' * Hovanes noted that the "Checkout Trigger" activity needs steps added in the project
    3 KB (434 words) - 02:55, 1 April 2015
  • ...ere the LV crate is. As for the MPOD controller settings Dave will talk to Hovanes.
    6 KB (1,133 words) - 06:58, 1 April 2015
  • ...esent: Richard J., Brendan P., Alex B., Alex S., Dan S., Kei M., Franz K., Hovanes E., Tim W., Eugene C, and Curtis M. ...rg/doc-private/DocDB/ShowDocument?docid=2889 Upgrades for BPU readout] - ''Hovanes E.''
    1 KB (183 words) - 17:00, 24 February 2017
  • ...upply, so maybe tomorrow we will be able to test the fast shut down. First Hovanes will try it on a different crate. Dave received the flow sensor for the chi
    4 KB (708 words) - 06:58, 1 April 2015
  • * Present: Richard J., Alex B., Brendan P, Ann Marie C., Alex S., Yi Q., Hovanes E., Curtis M., Dan S., Mike D., and Nathan S.
    943 B (139 words) - 17:00, 24 February 2017
  • * FDC power supply interlock status (Hovanes, Dave) ...ream platform since currently there no PLC in U1-5 and there are no plans. Hovanes will need to move it in his PDF file as well.
    3 KB (544 words) - 09:37, 20 March 2014
  • - The fast shut-down of the LV is now working thanks to Dave and Hovanes! (forgot to mention this at the meeting).
    4 KB (725 words) - 06:05, 1 April 2015
  • Attendees: ''David L. (chair), Hovanes E., Eugene C., Vardan G., Graham H., Bryan M., Mark I., Yi Q., Dave A., Ser ** Hovanes: will use the FCAL darkroom as an example to start prototyping
    4 KB (592 words) - 05:48, 1 April 2015
  • #* Halo Linearity scan (Hovanes) #* Halo Linearity scan (Hovanes)
    7 KB (1,008 words) - 08:43, 18 April 2016
  • ...P., Franz K., Dan S., Michael D., Mark D., Alex B., Nathan S., Eugene C., Hovanes E., Alex S., Justin S., Sascha S., and Curtis M.
    1 KB (193 words) - 12:38, 14 March 2017
  • * [[media:UPSforHallDreqs.pptx | UPS requirements for Hall D]] (Dave, Yi, Hovanes) * Radiator insertion stage test (Hovanes, Yi)
    4 KB (679 words) - 08:54, 2 April 2014
  • Attendees: ''David L.(chair), Simon T., Chris C., Beni Z., Sergey P., Hovanes E., Curtis M., Sean D., Graham H., Dave A., Mark D., Dmitry R., Vardan G.,
    5 KB (860 words) - 17:00, 24 February 2017
  • ...S., Alex D., Tim W., Natalie W., Nathan S., Elton S., Bill C., Jarrod F., Hovanes E., and Mike D.
    1 KB (194 words) - 17:12, 24 February 2017
  • * Warm magnet ramping procedures (Hovanes, Mark) * Missing controls for detector voltages (Hovanes)
    5 KB (794 words) - 22:48, 21 January 2015
  • * Radiator insertion stage test (Hovanes, Yi) Present: Dave, Mark S., Scot, Orlando, Hovanes, Elton, Nerses
    3 KB (527 words) - 11:36, 10 April 2014
  • ...i Z., Nerses G., Verdan G., Sean D., Sergey P., Dave A., Alex S., Mark D., Hovanes E., Dmitry R. ** This slipped through the cracks (Fernando's group and Hovanes thought the other was doing it)
    4 KB (536 words) - 06:26, 1 April 2015
  • Present: Nerses, Orlando, Elton, Dave B., Hovanes, Scot, Mark S., Mike, Beni * Hovanes needs some input on the archiving voltages, in particular the deadbands for
    2 KB (330 words) - 16:23, 30 April 2014
  • David L., Bryan M., Sergey F., Simon T., Alex S., HOvanes E., Dmitry R., Beni Z., Vanik, Serguei P., Curtis M., Eugene C., Mark I., M
    4 KB (652 words) - 06:29, 1 April 2015
  • ...us of motor applications 05/01/2014| Status of motor applications]] (Scot, Hovanes)
    617 B (78 words) - 09:36, 1 May 2014
  • ...know what EPICS PVs (or PLC tags) need to be archived and the deadband and Hovanes requests archiving using [http://devweb.acc.jlab.org/controls_web/cjs/reque ** Hovanes keeps track of what is in each Hall D archiving group in text file in SVN a
    3 KB (432 words) - 09:25, 29 May 2014
  • * [[EPICS archiving with MYA]] (Hovanes)
    420 B (57 words) - 09:42, 29 May 2014
  • ...d about the the control system for the bias voltages. Mark will check with Hovanes Egiyan on the status.
    4 KB (715 words) - 07:03, 1 April 2015
  • *#* We need to ask Hovanes Egiyan about the status of these scalers.
    4 KB (672 words) - 00:30, 1 April 2015
  • * Mark spoke to Hovanes Egiyan about plans for bias voltage control. A GUI will be available in Aug
    5 KB (787 words) - 20:23, 31 March 2015
  • ''n.b. Since the meeting, Hovanes has added these to the repository here: * Hovanes and Vanik have successfully tested the controls for the collimator table mo
    4 KB (616 words) - 20:23, 31 March 2015
  • ### Controls [Hovanes]
    3 KB (355 words) - 06:10, 1 April 2015
  • ...lldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2522 Slow Controls] - Hovanes Egiyan
    2 KB (196 words) - 16:51, 24 February 2017
  • * EPICS/PLC interface (Hovanes)
    618 B (82 words) - 12:40, 14 March 2017
  • ''David L., Sergey F., Sasha S., Graham H., Carl T., Beni Z., Vardan G., Hovanes E., Sean D., Mark D.''
    3 KB (439 words) - 00:48, 1 April 2015
  • ...tore them correctly, or issue an alarm. This has to be discussed also with Hovanes.
    5 KB (869 words) - 05:58, 1 April 2015
  • * <strike> Check that radiator set for commissioning is available (Alexandre, Hovanes) </strike> Material for 2x10^-4 available, Alexandre will order the 1x10^-4 ''Attending:'' Elton, Alexandre, Hovanes, Eugene, Sasha (Hall D); Todd, Michael (Accelerator)
    4 KB (571 words) - 17:22, 31 March 2015
  • ...parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Alexandre for Hall D) ''Attending: Elton, Alexandre, Hovanes, Eugene, Sasha (Hall D), Mike (Ops); Curtis (CMU); Richard (UConn)
    5 KB (659 words) - 06:20, 1 April 2015
  • ...to re-boot the IOC which is now an expert task. Please send Hovanes email (hovanes@jlab.org) if you need to have this done. ...mentary user interface at present; integration with EPICS will be left for Hovanes. Paul has asked Brad to write a program to use Sascha O.'s existing scalar
    7 KB (622 words) - 00:14, 1 April 2015
  • ##* Hovanes is working on the voltage readout with EPICs. He how has all the necessary
    6 KB (898 words) - 01:13, 1 April 2015
  • ...parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D) ...e) </strike> Alexandre talked to Tim about designing the necessary stands. Hovanes will order cables that can reach the end of the collimator hut.
    3 KB (408 words) - 06:33, 1 April 2015
  • * Problem with the BCAL interlocks (Hovanes) * [[media:ioc_status_rebooting.pdf | IOC status and rebooting]] (Hovanes)
    403 B (56 words) - 09:28, 24 July 2014
  • * Present: Richard J., Brendan P., Alex B., James M., Franz K., Yi Q., Hovanes E., Tim W., Eugene C., Natalie W., Alex D., and Michael D.
    1 KB (182 words) - 17:13, 24 February 2017
  • * Problem with the BCAL interlocks (Hovanes)
    409 B (51 words) - 09:36, 12 August 2014
  • ...parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D) ''Attending: Elton, Alexandre, Hovanes, Eugene (Hall D); Pavel, George (RadCon); Todd (CASA); Michael (Operations)
    6 KB (887 words) - 06:22, 1 April 2015
  • ''Attending: Javier Gomez (Physics); Elton Smith, Alexandre Deur, Hovanes Egiyan, Eugene Chudakov (Hall D); Richard Jones (GlueX); George, Pavel Degt
    2 KB (297 words) - 18:31, 8 August 2014
  • ##* Working with Hovanes to integrate the monitoring into the GlueX slow controls system.
    5 KB (805 words) - 06:53, 15 August 2014
  • ...parameters needed for the photon beam tuning (Todd for accelerator; Elton, Hovanes, Eugene, Alexandre for Hall D) * Hovanes is preparing photomultipliers that can be used to measure beam loss along t
    5 KB (749 words) - 09:14, 21 August 2014
  • * Present: Richard J., Alex B., Franz K., Nathan S., Curtis M., Hovanes E., Tim W., Eugene C., Natalie W., Alex D., and Michael D.
    1 KB (146 words) - 12:17, 18 August 2014
  • ....org/doc-private/DocDB/ShowDocument?docid=2557 Slow Controls Progress] --- Hovanes Egiyan
    9 KB (1,171 words) - 12:38, 14 March 2017
  • * [[media:alarm_system_status_21Aug2014.pdf | Alarm System]] (Hovanes)
    311 B (40 words) - 08:34, 21 August 2014
  • ...Moore was working on the epics communication with the device. According to Hovanes he changed the set temperature to a lower value for as short time, then the
    5 KB (831 words) - 03:23, 1 April 2015
  • * <strike> Hovanes is preparing photomultipliers that can be used to measure beam loss along t ''Attending: Elton, Alexandre, Eugene, Hovanes, Tim (Hall D); Pavel (RadCon); Alex Barnes, Richard, James, Brendan (UConn,
    5 KB (724 words) - 18:18, 3 September 2014
  • ...e want to implement in addition an EPICS interlock (discussed already with Hovanes). Later we will need a temperature sensor with a PLS system to interlock th
    4 KB (680 words) - 07:07, 1 April 2015
  • Attendees: Alex S., Bryan M., David L., Simon T., Sergey F., Curtis M., Hovanes E., Dave A., Sergeui P., Beni Z. * Hovanes has been working with Mark Ito on the alarm system.
    5 KB (722 words) - 21:32, 31 March 2015
  • * [[media:FDC_soft_interlock.pdf | FDC EPICS interlock]] (Hovanes) * Pair Spectrometer magnet power supply (Hovanes, Mark S.)
    336 B (44 words) - 09:32, 4 September 2014
  • ''Attending: Elton, Alexandre, Eugene, Hovanes, Tim, Glenn (Hall D); Pavel (RadCon); Richard (UConn); Curtis (CMU); ## Slow controls (Hovanes)
    5 KB (671 words) - 17:59, 10 September 2014
  • #* Hovanes will start developing a screen for Hall D based on the comfort screens from
    3 KB (471 words) - 17:50, 17 September 2014
  • ...utler made the status of the hardware interlock available for epics. Thus, Hovanes is working now on a control window that will have all this information so t
    5 KB (941 words) - 07:10, 1 April 2015
  • ##* Hovanes will update the firmware to the latest version
    7 KB (1,077 words) - 18:12, 25 September 2014
  • ...[[media:Gluex_overview_draft.jpg | Screen of beam parameters for Hall D]] (Hovanes) </strike> * <strike> List of variables from radiation monitors to Pavel (Hovanes and Alexandre) </strike>
    5 KB (811 words) - 06:42, 9 October 2014
  • * Screen of beam parameters for Hall D (Hovanes) ''Attending: Elton, Alexandre, Hovanes, Tim, Eugene, Nathan (Hall D); Michael (Ops); Curtis (CMU); Richard (UConn)
    3 KB (388 words) - 17:50, 24 September 2014
  • ...dweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2643 Slow Controls] -- Hovanes Egiyan
    9 KB (1,130 words) - 12:38, 14 March 2017
  • ...web.jlab.org/doc-private/DocDB/ShowDocument?docid=2834 Control Status] --- Hovanes Egiyan
    10 KB (1,251 words) - 12:40, 14 March 2017
  • "Attending: Elton, Beni, Alexandre, Hovanes, Eugene (Hall D); Todd (CASA); Pavel (RadCon); Curtis (CMU); Richard (UConn ...eed to take baseline rates of profile monitor before commissioning starts. Hovanes will do this.
    4 KB (648 words) - 10:48, 17 October 2014
  • ##* Mark volunteered to meet with Hovanes and Manuel to try to isolate this problem. ...e BCAL. Considering changing the variable names, but needs to consult with Hovanes. Output of arrays for the rates is also problematic as north and south rate
    6 KB (982 words) - 06:35, 1 April 2015
  • * [[Rules for beam operations | Beam Operations ]](Hovanes) ** Hovanes will carry the slow controls phone for these three weeks.
    464 B (63 words) - 08:37, 16 October 2014
  • * Hovanes needs to be notified prior to any changes to equipment or software that inv
    1 KB (169 words) - 08:33, 16 October 2014
  • #* [[media:ControlRoomConsoles.pdf | Proposal for console assignments]] (Hovanes) ...avid L. (chair), Dave A., Will M., Michael S., Curtis M., Justin, Sean D., Hovanes, Mark D., Alex. S., Sergeui P., Aristeides T.
    3 KB (374 words) - 06:29, 1 April 2015
  • - Lubomir will discuss with Hovanes possibilities for powering off the chiller in case of a failure like this u
    4 KB (628 words) - 00:14, 1 April 2015
  • - Lubomir will discuss with Hovanes possibilities for powering off the chiller in case of a failure like this u
    4 KB (657 words) - 20:36, 31 March 2015
  • ...that the NIM electronics can be cleaned up. If needed we can get help from Hovanes and Ben on the programming of the VME logic board. ##* Will work with Fernando and Hovanes to understand source and attempt fixes in January.
    6 KB (893 words) - 14:39, 18 December 2014
  • * Present: Richard J., Brendan P., Alex B., Eugene C., James M., Elton S., Hovanes E., Alex S., Michael D., Nathan S., and Kei M.
    885 B (127 words) - 12:59, 22 December 2014
  • #<strike><span style="color:red"> Controls </span> (Hovanes) </strike> ...="color:red"> Include Status and Controls on the general EPICS GUI</span> (Hovanes)
    16 KB (2,495 words) - 10:00, 19 March 2015
  • # Work with Hovanes to activate VME LED pulser setup for FCAL (Elton)
    6 KB (1,010 words) - 12:47, 26 March 2015
  • * Summary of the meeting on target controls (Hovanes) * Motor for polarimeter (Hovanes, Scot)
    331 B (42 words) - 22:48, 21 January 2015
  • ...Alex S., Michael D., Tim W., Alex D., Nathan S., Eugene C., Franz K., and Hovanes E.
    1 KB (210 words) - 12:38, 14 March 2017
  • * Motors for TAC, polarimeter, profiler (Hovanes, Scot) * FCAL voltage controls progress (Hovanes)
    374 B (48 words) - 18:11, 4 February 2015
  • ...erminal server, but then we need software to put the information in epics (Hovanes).
    4 KB (588 words) - 04:15, 1 April 2015
  • * All speakers except Hovanes were present and indicated agreement with their time slot
    3 KB (531 words) - 06:45, 1 April 2015
  • ...ols will be completed this week. These incorporates changes discussed with Hovanes for good interface to EPICS. The EPICS GUIs will allow entire strands to be
    6 KB (960 words) - 13:49, 12 February 2015
  • ...with information on where to apply these changes. Elton needs to meet with Hovanes to discuss implementing the new changes. In the meantime, the NIM pulser se
    7 KB (1,103 words) - 14:54, 26 February 2015
  • # Work with Hovanes to activate VME LED pulser setup for FCAL (Elton) ##* Manuel and Hovanes are trying to find the root cause of the reboots.
    8 KB (1,197 words) - 12:39, 14 March 2017
  • ...even the interlock should have prevented the box from turning on. Dave and Hovanes will look into this.
    4 KB (731 words) - 17:06, 2 April 2015
  • ...te: Currently the system still works using the associated NIM electronics. Hovanes has suggested that we delay the new programing till after this run so as no
    6 KB (912 words) - 18:39, 9 April 2015
  • ....jlab.org/doc-private/DocDB/ShowDocument?docid=2714 Controls Status] --- ''Hovanes Egiyan''
    9 KB (1,156 words) - 12:38, 14 March 2017
  • * Polarimeter controls (Hovanes, Scot) * FDC Chiller interlock (Dave, Hovanes)
    520 B (67 words) - 09:11, 2 April 2015
  • # Work with Hovanes to activate VME LED pulser setup for FCAL (Elton). Postpone till mid May, a
    6 KB (848 words) - 16:55, 24 February 2017
  • # <strike> Work with Hovanes to activate VME LED pulser setup for FCAL (Elton). Postpone till mid May, a
    6 KB (991 words) - 18:09, 7 May 2015
  • # <strike> Work with Hovanes to activate VME LED pulser setup for FCAL (Elton). </strike> Orlando has go ##* Hovanes has updated the EPICs IOCs to turn off bases that read above some max volta
    7 KB (1,077 words) - 17:12, 24 February 2017
  • * VME scaler readout in EPICS (Hovanes, Paul)
    243 B (33 words) - 10:03, 14 May 2015
  • ...., Michael D., Kei M., Alexandre D., Alex B., Franz K., Alex S., Elton S., Hovanes E., and Nathan S.
    1 KB (155 words) - 12:05, 26 May 2015
  • * FCAL Voltages (Hovanes) * PLC Heartbeat Alarms (Hovanes, Dave)
    320 B (41 words) - 08:06, 28 May 2015
  • ##* Scripts are ready by need testing. Hovanes has found one bug and testing continues before final implementation.
    5 KB (736 words) - 21:40, 2 July 2015
  • * Attending: Brian Bevins, Matt Bickley, Eugene Chudakov, Alexandre Deur, Hovanes Egiyan, Richard Jones, Pamela Kjeldsen, Alexander Somov
    274 B (34 words) - 19:34, 12 June 2015
  • * Power outage and restoration experience/problems/solutions (Dave,Hovanes)
    389 B (50 words) - 14:19, 24 June 2015
  • * Power outage and restoration experience/problems/solutions (Mark,Dave,Hovanes) ...rtified/mya/MyaDeadBands.pdf New deadband definitions for EPICS archiver] (Hovanes)
    509 B (68 words) - 14:28, 24 June 2015
  • ...ovanes noted in a [https://logbooks.jlab.org/entry/3344394 logbook entry]. Hovanes was not at the meeting so David will follow up with him later to find the s
    5 KB (794 words) - 15:15, 1 July 2015
  • ...J, Brendan P., Curtis M., Dan S., Kei M., Alex B., Alex S., Eugene C., and Hovanes E.
    1 KB (168 words) - 12:22, 6 July 2015
  • ...ted all firmware and testing on a single strand. Waiting for feedback from Hovanes, which will take about a week.
    8 KB (1,241 words) - 15:24, 16 July 2015
  • ...the FDC chiller was fixed (could not read out the temperature and flow) by Hovanes and the FDC LV and HV were turned on. So far we keep the HV at 2000V, some
    3 KB (513 words) - 18:51, 17 July 2015
  • ##* Hovanes is checking new firmware updates
    7 KB (1,150 words) - 15:29, 30 July 2015
  • ..., Dan S., Kei M., Nathan S., Alex B., Alex S., Alexandre D., Elton S., and Hovanes E. ...ferenceDisplay.py?confId=109 Accelerator StayTreat Agenda] Note updates by Hovanes (Hall D), Trent Allison (Hall D Feedback), among others
    2 KB (251 words) - 12:20, 20 July 2015
  • * Power outage and restoration experience/problems/solutions (Mark,Dave,Hovanes) ...rtified/mya/MyaDeadBands.pdf New deadband definitions for EPICS archiver] (Hovanes)
    529 B (70 words) - 08:25, 23 July 2015
  • ##* Hovanes has given the ok to upload the new base firmware to the bases and Jon has c
    7 KB (974 words) - 17:12, 24 February 2017
  • Attendees: David L. (chair), Simon T., Eric P., Curtis M., Dave A., Beni Z., Hovanes E., Sergey F., Bryan M., Alex S. * Hovanes noted that while the CSS GUIs have been tested on RHEL7, there has been no
    5 KB (843 words) - 14:47, 13 August 2015
  • ##* Hovanes will modify the EPICS interface to check validity of ADC inquiries, which c
    7 KB (1,035 words) - 17:05, 24 February 2017
  • ...esent: Richard J., Michael D., Franz K., Nathan S., Alex B., Alexandre D., Hovanes E., and Eugene C.
    903 B (127 words) - 11:43, 18 August 2015
  • Attendees: David L. (chair), Simon T., Sergey F., Dave A., Hovanes E., Curtis M., Sean D., Vardan G., Alex S., Beni Z., Carl T.
    5 KB (848 words) - 17:13, 24 February 2017
  • * Present: Richard J., Brendan P., Nathan S., Alex B., Alexandre D., Alex S., Hovanes E., Franz K., Dan S., Bill B., and Elton S.
    1 KB (197 words) - 16:51, 24 February 2017
  • * FCAL and PS LED pulsers (Hovanes) * Status of FCAL HV voltage controls (Hovanes)
    416 B (56 words) - 09:28, 17 September 2015
  • * TAC interlock (Hovanes)
    180 B (22 words) - 09:19, 4 February 2016
  • * MO VME board EPICS support (Hovanes)
    198 B (26 words) - 16:23, 14 October 2015
  • ...EPICs; when loosing communication they shut themselves off. Working with Hovanes to investigate this problem.
    7 KB (1,002 words) - 12:39, 14 March 2017
  • * Present: Alex B. Nathan S., Hovanes E., Alexandre D., Curtis M, Richard J., Brendan P., Michael D., Dan S., Fra
    1 KB (193 words) - 12:38, 14 March 2017
  • * [[media:ForFall2016.xlsx | Items for the next fall]] (Hovanes)
    182 B (22 words) - 08:43, 28 April 2016
  • Attendees: David L., Sergey F., Paul L., Hovanes E., Curtis M., Sean D., Beni Z., Simon T., Eugene C. ** Hovanes noted that this can interfere with the Wed. afternoon Accelerator meeting
    5 KB (845 words) - 16:36, 5 May 2016
  • #* No significant discussion here since Hovanes was not present. Sergey suggested we could consider specifying some compute
    6 KB (914 words) - 17:16, 18 May 2016
  • ...iteboard cameras]: installed but still not accessible. Will need help from Hovanes * Hovanes not at meeting to discuss so David will speak with him offline
    5 KB (852 words) - 17:09, 1 June 2016
  • * FDC chiller EPICS interface (Hovanes) * Microscope support motion tests (Hovanes, Vanik)
    344 B (41 words) - 08:59, 23 June 2016
  • ...anaging logs to ensure they don't overwrite disk. (David will discuss with Hovanes et al.)
    4 KB (597 words) - 15:28, 29 June 2016
  • * Microscope support actuator issues (Hovanes) * FDC chiller EPICS control (Hovanes)
    288 B (34 words) - 10:05, 20 July 2016
  • * Microscope support actuator issues (Hovanes) * FDC chiller EPICS control (Hovanes)
    288 B (34 words) - 10:06, 20 July 2016
  • * Present: Eugene, Justin, Alexandre D., Michael D., Curtis, Nathan, Hovanes, Brendan, Alex S., Dan S.
    1 KB (179 words) - 11:54, 5 August 2016
  • * Present: Alex D., Hovanes E., Alex S., Eugene C., Alex B., Nathan S., Justin S., Elton S., Richard J.
    1 KB (191 words) - 11:51, 17 August 2016
  • <!--#*Check bleedthrough level. 10min Hovanes. <font color="red">Hall A or C needs to be running</font>--> #*Once radiation levels are good, proceed with harp scans (Hovanes/Todd. 15 min)
    19 KB (2,918 words) - 16:30, 26 November 2018
  • #*Check bleedthrough level. 10min Hovanes. <font color="red">Hall A needs to be running</font> #*Once radiation levels are good, proceed with harp scans (Hovanes/Todd. 15 min)
    21 KB (3,257 words) - 16:26, 26 November 2018
  • ##* Hovanes has made available a PDU to power the supplies and it is being installed in ...n. The Fcal probably wishes to setup something similar. Adesh will talk to Hovanes to see how best to implement such a scheme.
    8 KB (1,229 words) - 17:00, 24 February 2017
  • * Hovanes and Alex S. will be notified of their slots
    3 KB (473 words) - 09:28, 28 September 2016
  • ...ent: Michael D., Richard J., Franz K., Brendan P., Elton S., Alexandre D., Hovanes E., Nathan S., Eugene C., Tim W., and Curtis M.
    1 KB (176 words) - 11:35, 12 September 2016
  • ...Richard J., Dan S., Brendan P., Alex S., Elton S., Alex B., Alexandre D., Hovanes E., Nathan S., Eugene C., and Curtis M.
    2 KB (226 words) - 17:00, 24 February 2017
  • * Collimator status (Hovanes) * CompCal motors (Hovanes, Tim)
    180 B (21 words) - 09:15, 13 October 2016
  • # Update on goniometer repairs - ''Tim W.'', ''Hovanes E.''
    1 KB (163 words) - 11:36, 24 October 2016
  • # Update on goniometer installation - ''Hovanes E.''
    1 KB (170 words) - 12:50, 7 November 2016
  • * Goniometer status (Hovanes, Tim) * CAEN SY4527 HV chassis for DIRC/COMPCAL (Hovanes)
    332 B (43 words) - 11:55, 9 November 2016
  • # Collimator scans with the new x,y controls - ''Hovanes E.''
    1 KB (172 words) - 12:44, 21 November 2016
  • ...ating an alarm state even when the system was locked out by the interlock. Hovanes has updated the values in EPICS to correspond to the hardware and will now
    6 KB (917 words) - 14:39, 15 December 2016
  • ...rendan P., Dan S., Sascha S., Alex B., Justin S., Thomas B., Alexandre D., Hovanes E., Nathan S., Eugene C., and Curtis M. # Beam spot profile measurements - ''Hovanes E.''
    2 KB (334 words) - 12:34, 19 December 2016
  • ...vate/DocDB/ShowDocument?docid=3234 Diamond alignment and beam stability] - Hovanes Egiyan
    10 KB (1,269 words) - 12:38, 14 March 2017
  • * BCAL alarms in PLC (Hovanes, Nick, Elton) * Goniometer for spring run (Hovanes, Tim)
    484 B (65 words) - 10:10, 19 January 2017
  • * Present: Richard J., Alexandre D., Nathan S., Barry R., Michael D., Tim W., Hovanes E., Dan S., Sascha S., Alex B., Justin S., Eugene C., and Curtis M. # Beam spot profile measurements taken last run - ''Hovanes E.''
    2 KB (296 words) - 14:24, 10 January 2017
  • ...r). Sergey F., Dave A., Carl T., Vardan G., Bryan M., Simon T., Curtis M., Hovanes E., Graham H. * Hovanes pointed out that the problem could be with the controller and not a disk
    4 KB (665 words) - 18:02, 11 January 2017
  • ##* Hovanes planes to add the LED pulser information into the archiver, but this may no
    6 KB (993 words) - 13:22, 26 January 2017
  • * BCAL alarms in PLC (Hovanes, Nick, Elton) * Goniometer for spring run (Hovanes, Tim)
    510 B (70 words) - 10:10, 19 January 2017
  • * Present: Richard J., James M., Dan S., Hovanes E., Alexandre D., Nathan S., Michael D., Thomas B., Tim W., Sascha S., Alex
    1 KB (176 words) - 13:01, 30 January 2017
  • #** Hovanes + Tom: cable running
    10 KB (1,363 words) - 10:23, 15 February 2017
  • * Present: Richard J., Brendan P., Hovanes E., Alexandre D., Nathan S., Alex B., and Eugene C. ...sciencedirect.com/science/article/pii/S0168900211020055 MCB reference that Hovanes promised allegedly showing slightly rotated distributions]
    3 KB (349 words) - 12:40, 14 March 2017
  • #** [https://logbooks.jlab.org/entry/3461097 Analysis of the latest scan] by Hovanes #* Once, the goniometer got stuck moving, and Hovanes had to fix it [https://logbooks.jlab.org/entry/3459894]
    13 KB (1,779 words) - 09:43, 22 February 2017
  • # Brief review of progress with beam conditions during run - ''Hovanes E.''
    2 KB (221 words) - 12:00, 1 March 2017
  • ...s.jlab.org/entry/3464184 Hall D], [https://logbooks.jlab.org/entry/3464277 Hovanes analysis]
    12 KB (1,560 words) - 09:34, 8 March 2017
  • * BCAL PLC not tripping MPODs when down (Nick, Hovanes) * Alarms from BCAL (Nick,Hovanes)
    381 B (53 words) - 08:27, 2 March 2017
  • * Present: Hovanes E., Alexandre D., Eugene C., Richard J., Michael D., Dan S., Brendan P., Na
    2 KB (214 words) - 11:34, 13 March 2017
  • * BCAL PLC not tripping MPODs when down (Nick, Hovanes) * Alarms from BCAL (Nick, Hovanes)
    435 B (57 words) - 23:09, 15 March 2017
  • ...'JLab''': Alex Austregesilo, Thomas Britton, Brad Cannon, Eugene Chudakov, Hovanes Egiyan, Sergey Furletov, Mark Ito (chair), David Lawrence, Paul Mattione, D
    8 KB (1,184 words) - 18:53, 22 March 2017
  • ...Curtis M., Dan S., Alex B., Brendan P., Michael D., Justin S., Nathan S., Hovanes E., Alexandre D., Eugene C., and Sascha S.
    2 KB (213 words) - 12:32, 27 March 2017
  • * Alarms from BCAL (Nick, Hovanes) * Alarms for beamline vacuum (Tim, Hovanes)
    358 B (47 words) - 15:05, 29 March 2017
  • * 10:00 Session IIIb (50) --- Tracking - (Organizer: Naomi Jarvis) - Chair: Hovanes Egiyan
    10 KB (1,300 words) - 12:23, 18 May 2017
  • ...b''': Alex Austregesilo, Amber Boehnlein, Thomas Britton, Eugene Chudakov, Hovanes Egiyan, Sergey Furletov, Mark Ito (chair), David Lawrence, Paul Mattione, D
    5 KB (724 words) - 13:41, 19 April 2017
  • * EPICS alarms from BCAL (Nick, Hovanes) * BCAL chiller naming and labeling (Hovanes,Nick)
    836 B (115 words) - 09:20, 27 April 2017
  • ...stregesilo, Amber Boehnlein, Thomas Britton, Brad Cannon, Eugene Chudakov, Hovanes Egiyan, Sergey Furletov, Mark Ito (chair), David Lawrence, Dmitry Romanov,
    6 KB (898 words) - 12:46, 3 June 2017
  • ...hard J., Micah W., Curtis M., Alexandre D., Baalouch M., Dan S., Elton S., Hovanes E., Michael D., and Ken L.
    1 KB (199 words) - 11:33, 5 June 2017
  • * Collimator survey (Tim, Hovanes)
    266 B (34 words) - 09:08, 8 June 2017
  • * '''JLab''': Thomas Britton, Brad Cannon, Eugene Chudakov, Hovanes Egiyan, Mark Ito (chair), Dmitry Romanov, Beni Zihlmann
    6 KB (879 words) - 09:16, 21 June 2017
  • ...prior to a data run, monitor bases, coordinate fixes with Chris and Nick, Hovanes before turn on.
    6 KB (984 words) - 13:07, 29 June 2017
  • * '''JLab''': Alexander Austregesilo, Thomas Britton, Brad Cannon, Hovanes Egiyan, Mark Ito (chair), David Lawrence, Dmitry Romanov, Elton Smith, Nath
    6 KB (883 words) - 15:30, 29 June 2017
  • * '''JLab''': Alexander Austregesilo, Thomas Britton, Eugene Chudakov, Hovanes Egiyan, Mark Ito (chair), David Lawrence, Dmitry Romanov, Justin Stevens, S
    6 KB (798 words) - 14:37, 11 October 2017
  • ...vate/DocDB/ShowDocument?docid=3234 Diamond alignment and beam stability] - Hovanes Egiyan
    8 KB (1,073 words) - 15:42, 31 August 2017
  • * Update on motors (Hovanes)
    282 B (36 words) - 09:29, 3 August 2017
  • ...Alexander Austregesilo, Amber Boehnlein, Thomas Britton, Eugene Chudakov, Hovanes Egiyan, Mark Ito (chair), Curtis Meyer, Sandy Philpott, Joerg Reinhold, Dmi
    4 KB (612 words) - 17:55, 10 August 2017
  • ** BCAL chiller numbering mismatch fixed (Hovanes)
    309 B (39 words) - 17:01, 14 August 2017
  • * ''' JLab ''': Thomas Britton, Eugene Chudakov, Hovanes Egiyan, Mark Ito (chair), Dmitry Romanov, Justin Stevens, Simon Taylor, Ben
    6 KB (941 words) - 12:40, 25 August 2017
  • * BCAL analog alarms (Nick,Hovanes)
    252 B (34 words) - 08:50, 31 August 2017
  • * Hovanes Egiyan has checked in a [https://github.com/JeffersonLab/sim-recon/pull/899
    5 KB (669 words) - 20:49, 7 September 2017
  • * Present: Richard J., James M., Curtis M., Hovanes E., Tim W., Alex D., Sebastian C., Baalouch M., Michael D., Peter P., Ken L
    2 KB (226 words) - 12:29, 11 September 2017
  • * Goni survey (Tim, Hovanes)
    479 B (63 words) - 07:38, 14 September 2017
  • ...lex D., Sebastian C., Baalouch M., Michael D., Alex B., Dan S., Justin S., Hovanes E., Alex S.
    2 KB (252 words) - 11:51, 25 September 2017
  • * Discussed with Alex Somov, Hovanes and Eugene: Agree that this should help with TAC runs: Wire radiator could
    2 KB (350 words) - 11:26, 25 September 2017
  • * FDC/CDC voltage controls (Hovanes)
    327 B (42 words) - 09:04, 27 September 2017
  • .... Nick is working on the distribution box. Once the hardware is installed, Hovanes has to redo the control software, it might be tight in time before the Dece
    2 KB (388 words) - 15:45, 28 September 2017
  • ** Align JD70-104 (17 μm - 1.4·10-4 R.L., 7×7 mm²) (Hovanes) and take enough data to achieve ~1% statistic on rho polarimetry (less tha ...alo measurements to assess background for PRad target TAC runs.]] (A. Deur/Hovanes/A. Somov 1h×2)
    28 KB (4,381 words) - 16:26, 26 November 2018
  • ...e C., Alex D., Alex S., Sebastian C., Baalouch M., Michael D., Dan S., and Hovanes E.
    1 KB (173 words) - 19:19, 23 October 2017
  • * FDC/CDC voltage controls (Hovanes, Nick)
    301 B (39 words) - 07:48, 26 October 2017
  • - FDC threshold upgrade is done: all modules, cables installed; Hovanes finished the control system. Has to be tested, best with DAQ and software t ...than the FDC negative ones. Replacing one module didn't help, decided with Hovanes and Fernando to replace the whole mainframe.
    3 KB (498 words) - 18:44, 2 November 2017
  • - FDC threshold upgrade is done: all mods, cables installed; Hovanes finished the control system. Has to be tested, best with DAQ and software t ...than the FDC negative ones. Replacing one module didn't help, decided with Hovanes and Fernando to replace the whole mainframe.
    3 KB (457 words) - 12:57, 30 November 2017
  • * ''' JLab: ''': Alex Austregesilo, Thomas Britton, Hovanes Egiyan, Mark Ito (chair), Richard Jones, Mahmoud Kamel, Justin Stevens, Ben
    3 KB (503 words) - 16:45, 13 December 2017
  • ...s M., Alexandre D., Baalouch M., Michael D., Alex B., Eugene C., Sasha S., Hovanes E., and Alex S.
    2 KB (351 words) - 13:04, 18 December 2017
  • ...asha can do the TAC runs (including with V-wire) without Hovanes? Or maybe Hovanes can make preparation today so that Sasha can do the runs by himself Sunday ...ould also align the 17 um diamond (0 and 90 degree only). An issue is that Hovanes is off Sunday and Monday. Maybe Paul can do it?
    1 KB (273 words) - 17:52, 13 January 2018
  • ...d J., James M., Curtis M., Alexandre D., Alexander A., Alex B., Justin S., Hovanes E., Eugene C., Alex S., Michael D., and Ken L.
    2 KB (238 words) - 13:59, 22 January 2018
  • * Goniometer linear motion sequence (Hovanes, Vanik)
    387 B (49 words) - 11:54, 25 January 2018
  • ...oks.jlab.org/entry/3523561], [https://logbooks.jlab.org/entry/3523573] and Hovanes [https://logbooks.jlab.org/entry/3523819] #* Different harp fits: Hovanes [https://logbooks.jlab.org/entry/3521184], Richard [https://logbooks.jlab.o
    13 KB (1,919 words) - 12:14, 31 January 2018
  • #** Harp scans by MCC and Hall D (Hovanes on shift)
    11 KB (1,569 words) - 09:43, 7 February 2018
  • #* active collimator - ''Hovanes E.''
    1 KB (171 words) - 12:46, 5 February 2018
  • * ''' JLab: ''' Alex Austregesilo, Thomas Britton, Hovanes Egiyan, Mark Ito (chair), David Lawrence, Beni Zihlmann
    10 KB (1,517 words) - 15:00, 21 February 2018
  • #** [https://logbooks.jlab.org/entry/3532033 Hovanes put lead on the beam profiler for the v-wire study] #* [https://logbooks.jlab.org/entry/3531898 Hovanes made a V-wire study]
    9 KB (1,313 words) - 07:59, 21 February 2018
  • ...to check active collimator X; MCC cannot lock on to it but can lock on Y (Hovanes) #* Move collimator (Hovanes)
    9 KB (1,306 words) - 10:43, 27 February 2018
  • * Present: Richard J., Mark D., Sasha S., Justin S., Hovanes E., Alexander A., Alexandre D. and Dan S.
    1 KB (130 words) - 13:32, 14 April 2020
  • #* For these runs: (i) Hovanes reverted the collimator position to the same value used in the previous cur
    9 KB (1,335 words) - 09:36, 7 March 2018
  • ...to check active collimator X; MCC cannot lock on to it but can lock on Y (Hovanes) #* Move collimator (Hovanes)
    10 KB (1,436 words) - 09:49, 28 February 2018
  • * Translation stages for ComCal (Tim, Hovanes)
    202 B (25 words) - 08:16, 17 May 2018
  • * EPICS support for ActiveMQ messages (Hovanes)
    405 B (55 words) - 19:55, 7 March 2018
  • Tell/email Hovanes that he can check the beam convergence (we do not need this result to proce If PS rate on Al. radiator is wrong too, call Hovanes to do the photon beam transmission optimization (i.e. collimator scan). Thi
    3 KB (478 words) - 16:22, 23 March 2018
  • #* Diamond spot adjustment (Hovanes, needs to start before noon or try again tomorrow) #** Hovanes set diamond positions but didn't have time for spot adjustment, #1 for toda
    8 KB (1,284 words) - 10:35, 4 April 2018
  • * Present: Richard J., James M., Alex B., Alexandre D., Hovanes E., Alexandre A., Mark D., Sasha S, Justin S., Sebastian C., and Eugene C.
    1 KB (166 words) - 12:53, 2 April 2018
  • ...://logbooks.jlab.org/entry/3555570 Multiple peaks in profiler (AC lock?)] (Hovanes) #* [https://logbooks.jlab.org/entry/3556975 Beam Convergence](Hovanes)
    7 KB (896 words) - 17:19, 11 April 2018
  • * Present: <!-- Richard J., James M., Alex B., Alexandre D., Hovanes E., Alexandre A., Mark D., Sasha S, Justin S., Sebastian C., and Eugene C.-
    2 KB (302 words) - 15:42, 6 April 2018
  • #* [https://logbooks.jlab.org/entry/3559655 Harp scan] (Hovanes) #* Hovanes and Sasha need to test V wire and lock on active collimater (~10 minutes)
    8 KB (1,222 words) - 08:42, 18 April 2018
  • * Present: Richard J., James M., Alex B., Alexandre D., Hovanes E., Alexandre A., Mark D., Sasha S, Justin S., Sebastian C., and Eugene C. #* TAC run lessons learned - ''Hovanes''
    1 KB (188 words) - 08:42, 30 April 2018
  • #* TAC run lessons learned - ''Hovanes''
    2 KB (301 words) - 12:21, 30 April 2018
  • #* progress with TAC runs - ''Hovanes''
    2 KB (246 words) - 11:34, 14 May 2018
  • * ''' JLab: ''' Amber Boehnlein, Thomas Britton, Hovanes Egiyan, Mark Ito (chair), David Lawrence, Simon Taylor
    6 KB (979 words) - 17:41, 1 June 2018
  • ** Translation stages (Tim, Hovanes) ** Voltages (Hovanes, Nick)
    326 B (39 words) - 15:55, 13 June 2018
  • ** Translation stages (Tim, Hovanes) ** Voltages (Hovanes, Nick)
    377 B (44 words) - 08:51, 28 June 2018
  • * Goniometer (Tim, Hovanes) ** Translation stages (Tim, Hovanes)
    415 B (48 words) - 17:03, 11 July 2018
  • ** Translation stages (Tim, Hovanes, Sasha) ** Voltages (Hovanes, Nick)
    595 B (73 words) - 08:55, 9 August 2018
  • *** Align JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) (Hovanes) and take enough data to achieve ~1% statistic on rho polarimetry (less tha <!--#*Check bleedthrough level. 10min Hovanes. <font color="red">Hall A/B/C needs to be running</font>-->
    24 KB (3,652 words) - 12:48, 12 December 2018
  • ** Translation stages (Tim, Hovanes, Vanik) ** LED pulser (Hovanes)
    507 B (61 words) - 21:11, 5 September 2018
  • ** LED pulser (Hovanes) ** LED Pulser (Hovanes)
    602 B (71 words) - 09:55, 20 September 2018
  • #* Overnight saw some straight track running with Hovanes doing the flux optimization today. # Run Plan: Hovanes flux optimization/AC calibration. Sergey DAQ work. CDC HV scan? Detector c
    5 KB (833 words) - 09:03, 27 September 2018
  • #** 0930 Quick access for Hovanes with ARM to install the Pb converter; also remember to call Melvin from ra #** Hovanes will calibrate A.C. high gain setting on Thurs am.
    8 KB (1,287 words) - 09:25, 3 October 2018
  • #***TAC run preparation, Hovanes with ARM to install the Pb converter #** Hovanes will calibrate A.C. high gain setting (am, after access)
    7 KB (977 words) - 08:27, 10 October 2018
  • #* Alignment of JD70-105 47um in 10 hours. THANKS TO HOVANES!
    6 KB (821 words) - 08:33, 24 October 2018
  • ** LED pulser (Hovanes) ** LED Pulser (Hovanes)
    457 B (56 words) - 08:05, 18 October 2018
  • ...e. MCC spent an hour working on this with the result being no improvement. Hovanes then realigned the diamonds in preparation for weekend running.
    1 KB (237 words) - 09:23, 24 October 2018
  • #*[https://logbooks.jlab.org/entry/3621853 Hovanes reinstated the beamline vacuum alarm auto-notifications] #*Vacuum pump speed alarm re-enabled by Hovanes
    11 KB (1,688 words) - 10:45, 7 November 2018
  • ** LED pulser (Hovanes) ** Voltages (Hovanes)
    576 B (66 words) - 09:54, 1 November 2018
  • ** LED pulser (Hovanes) ** Voltages (Hovanes)
    396 B (44 words) - 20:55, 14 November 2018
  • #* [https://logbooks.jlab.org/entry/3629008 tagger magnetic field] Hovanes ...https://logbooks.jlab.org/entry/3627399 GONI camera is not communicating] (Hovanes)
    9 KB (1,262 words) - 05:07, 22 November 2018
  • ** XPS Controllers (Nick, Hovanes) * Remote resets (Hovanes, Nick)
    516 B (66 words) - 16:51, 26 June 2019
  • #* Amorphous radiator ladder by Hovanes and Scot
    4 KB (673 words) - 09:42, 12 December 2018
  • ** Voltages (Nick, Hovanes) ** LED pulser (Hovanes)
    544 B (62 words) - 09:39, 13 December 2018
  • ** Voltages (Nick, Hovanes) ** LED pulser (Hovanes)
    608 B (71 words) - 10:04, 10 January 2019
  • <!--#*Check bleedthrough level. 10min Hovanes. <font color="red">Hall A/B/C needs to be running</font>--> #*Verify beam position and envelope (Hovanes).
    27 KB (4,215 words) - 08:36, 10 April 2019
  • ** Voltages (Nick, Hovanes) ** LED pulser (Hovanes)
    810 B (103 words) - 10:45, 24 January 2019
  • ** Scalers and Temperatures from FPGA (Hovanes)
    445 B (55 words) - 22:58, 6 February 2019
  • ...IOCHDCOL failed at 21:30. Reported to us by MCC at 0:00. Reset at 1:50 am. Hovanes verified things are ok at 3am. https://logbooks.jlab.org/entry/3652920
    2 KB (276 words) - 10:09, 15 February 2019
  • ...IOCHDCOL failed at 21:30. Reported to us by MCC at 0:00. Reset at 1:50 am. Hovanes verified things are ok at 3am. https://logbooks.jlab.org/entry/3652920
    5 KB (686 words) - 07:19, 21 March 2019
  • ...gbooks.jlab.org/entry/3666123 Collimator scan]: new AC position -0.1, 0.0 (Hovanes) ...ry/3666037][[https://logbooks.jlab.org/entry/3666074], needs rapid access (Hovanes)
    3 KB (453 words) - 07:21, 21 March 2019
  • * Remote resets (Hovanes)
    421 B (65 words) - 17:51, 20 March 2019
  • #* Hovanes checked the performance of the Active Collimator at small current using Bea ##* Sergey and Hovanes: DAQ
    6 KB (966 words) - 07:22, 21 March 2019
  • #*Verify beam position and envelope (Hovanes). ...flux optimization and Active Collimator calibration. (20 + 20 mins). Call Hovanes.
    34 KB (5,218 words) - 16:32, 31 March 2020
  • ...ork connection that ended up fixing itself after much troubleshooting from Hovanes (https://logbooks.jlab.org/entry/3668424). In total, these and other minor
    1 KB (218 words) - 13:29, 22 March 2019
  • * Remote resets (Hovanes)
    489 B (75 words) - 10:32, 3 April 2019

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)