Difference between revisions of "Photon Beam"
From GlueXWiki
(→Accelerator Information) |
|||
Line 46: | Line 46: | ||
* [http://opsntsrv.acc.jlab.org/ops_docs/MCC_web_interface/interface_pages/beamline_drawings.asp Links to Accelerator Beamline Drawings] | * [http://opsntsrv.acc.jlab.org/ops_docs/MCC_web_interface/interface_pages/beamline_drawings.asp Links to Accelerator Beamline Drawings] | ||
* [[Photos of the electron beamline]] | * [[Photos of the electron beamline]] | ||
+ | * [[RF Calibration]] | ||
==Related links== | ==Related links== | ||
* [[Tagger_and_Beamline_Working_Group_Archives|archived pages]] | * [[Tagger_and_Beamline_Working_Group_Archives|archived pages]] |
Revision as of 11:22, 14 September 2015
Design requirements |
Calculator for Coherent bremsstrahlung calculator
|
Electron beam requirements |
Spectrometers |
Instrumentation |
Radiator System |
Photon beam pipe |
Collimation system |
Sweep Magnet 1 |
Shielding and radiation doses |
Sweep magnet 2 |
Beam simulations |
Contents
Photon Beam Working Group Information
- group meetings
- send email to group list
- browse mailing list archives
- working group members (private)
Reference documents
- engineering drawings
- rack locations in the tagger hall
- microscope readout cable lengths and routes
- alignment and calibration
- beam commissioning plan
Accelerator Information
- Accelerator - Hall D Interface Document (draft - 2008)
- File:ICD Accelerator-HallD rev curr.pdf Accelerator - Hall D Interface Document (current revision)
- Accelerator Songsheets: links to the song sheets for the NE section of the machine including the beam line to Hall D tagger
- Links to Accelerator Beamline Drawings
- Photos of the electron beamline
- RF Calibration