Difference between revisions of "Photon Beam"
From GlueXWiki
Line 34: | Line 34: | ||
* [[Private:Construction contracts | construction contracts and related info (private)]] | * [[Private:Construction contracts | construction contracts and related info (private)]] | ||
* [[discussion of e+/e- tertiary beams in Hall D]] | * [[discussion of e+/e- tertiary beams in Hall D]] | ||
+ | * [[Rack location in the Tagger Hall]] | ||
<br> | <br> | ||
* Accelerator: | * Accelerator: |
Revision as of 11:54, 11 November 2013
Design requirements |
Spectrometers |
Instrumentation |
Radiator System |
Photon beam pipe |
Collimation system |
Sweep Magnet 1 |
Shielding and radiation doses |
Sweep magnet 2 |
Beam simulations |
This is the central reporting page for the
GlueX Tagged Photon Beam Working Group
- group meetings
- send email to group list
- browse mailing list archives
- working group members (private)
- detector construction milestones (private)
- photon beam and tagger instrumentation paper (2010)
- Statement of Work for tagger procurement (2010)
- construction contracts and related info (private)
- discussion of e+/e- tertiary beams in Hall D
- Rack location in the Tagger Hall
- Accelerator:
- Accelerator - Hall D Interface Document (draft - 2008)
- Accelerator Songsheets: links to the song sheets for the NE section of the machine including the beam line to Hall D tagger
- engineering drawings
- diamond radiator assessment
- microscope readout cable lengths and routes
- alignment and calibration
- Beam Commissioning Plan