Search results

From GlueXWiki
Jump to: navigation, search

Page title matches

Page text matches

  • #*Light guide: Zisis has not received replies from TRIUMF/UBC or Carleton, on the aluminum depos
    2 KB (254 words) - 11:45, 19 May 2006
  • Talk to you later, Zisis...
    2 KB (240 words) - 10:56, 19 May 2006
  • On August 21, David, Elliott and Zisis discussed the desired triggers in the Trigger Supervisor (TS). We agreed t David, Elliott, Simon and Zisis discussed electronics, trigger and data issues on Friday, July 14.
    5 KB (835 words) - 15:55, 29 August 2006
  • ...l S., Matt, Eric S. (Indiana), David L., Elliott (JLab), George, Mauricio, Zisis (Regina) # ''Tagger and Trigger:'' Paul Smith, Elliott, Franz Klein and Zisis will refine the trigger logic and tagger demands offline.
    4 KB (752 words) - 22:43, 23 May 2006
  • Teleconference - June 1st: Elliott, David Lawrence and Zisis discussed issues in connection to collimation and beam flux. The consensus
    5 KB (863 words) - 17:14, 24 February 2017
  • ...(Indiana), David L., Elliott, Elton (JLab), Curtis (CMU), George, Rafael, Zisis (Regina) #** Regina: Zisis is looking into mu-metal foil and Si cookies (see action item list). For th
    7 KB (1,214 words) - 16:57, 6 July 2006
  • <tr><td>George Lolos</td><td>BCAL Module</td><td>June 22 - July 18</td><td>Zisis Papandreou</td></tr> <tr><td>Zisis Papandreou</td><td>Overall Coordinator, BCAL Module</td><td>August 7-14</td
    763 B (124 words) - 10:28, 21 July 2006
  • ...(Aug. 19 - Oct. 3), Blake (Aug 19. - Oct. 3), Kathryn (Aug. 19 - Aug. 26), Zisis (Aug. 19 - Aug. 26, Sep. 19 - Sep. 30), Ioanna (Sep. 19 - Sep. 30), George
    6 KB (1,040 words) - 21:11, 23 August 2006
  • ...lcove (Eric). Then we will set up to take cosmics for at least two weeks (Zisis). ...the Pair Spectrometer...it will be used as a cleanup sweeping magnet only (Zisis).
    3 KB (536 words) - 08:51, 11 July 2006
  • ...(Indiana), David L., Elliott, Simon (JLab), Dan Sober (CU), Blake, Rafael, Zisis (Regina) ...ce for our tests, since no large/stray fields are expected in the alcove. Zisis will order mu-metal sheets sufficent to cover the light-guide boxes in a fe
    6 KB (970 words) - 09:25, 11 July 2006
  • ...erm staging areas will not be needed, all work will be done in the alcove (Zisis says so) ...e, etc, esp. requests for H-B technician time (Elliott with help from Eric,Zisis)
    3 KB (503 words) - 08:26, 11 July 2006
  • Nikolay, K., Zisis P., Rafael H., Blake L. Web Portal: Zisis reported that they are starting to work
    5 KB (834 words) - 15:45, 4 December 2006
  • ...ic (Indiana), David, Elliott, Simon (JLab), Dan Sober (CU), Blake, Rafael, Zisis (Regina) # ''Alcove/beamline:'' Elliott, Zisis and Eric S. will work out details and communicate to H-B engineers.
    3 KB (464 words) - 15:44, 12 July 2006
  • ...r the run? Do we ship the BCAL/cart off-site, or store them here, or...? Zisis...please advise.
    2 KB (376 words) - 13:27, 13 July 2006
  • ...iana), Elton, David, Elliott, Simon (JLab), Dan Sober (CU), Blake, Rafael, Zisis (Regina) ...' Eric has posted a draft of the [[Installation Procedures]] to the Wiki. Zisis will update it with information on the Module rotators/rockers. All work o
    4 KB (607 words) - 17:17, 19 July 2006
  • ...coordinate with URegina to ensure BCAL module arrives at the correct time (Zisis).
    2 KB (344 words) - 13:19, 20 July 2006
  • (Zisis' comment referred to am earlier scheme, now superceded...ejw)<br> ...and if this is ok with folks like Richard) and 3) Purchase new cables. -- Zisis
    3 KB (495 words) - 15:24, 22 September 2006
  • ...ndees'': Eric (Indiana), Elton, David, Alex (JLab), George, Blake, Rafael, Zisis (Regina) #* ''Travel Plans:'' Zisis will communicate with Linda Ceraul to arrange for the travel and accommodat
    4 KB (618 words) - 11:43, 1 August 2006
  • ...diana), Elton, David, Simon (JLab), Dan Sober (CU), George, Blake, Rafael, Zisis (Regina) # ''Data storage/Silo Request:'' David and Zisis will deal with this offline.
    4 KB (585 words) - 10:54, 6 August 2006
  • ..., David, Elliott, Dan Sober, Simon (JLab), George, Rafael, Blake, Kathryn, Zisis (Regina) # ''Data storage/Silo Request:'' David and Zisis will deal with this offline.
    3 KB (432 words) - 18:49, 16 August 2006

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)