Difference between revisions of "Photon Beam"
From GlueXWiki
Line 31: | Line 31: | ||
* [[Tagged Beam R&D Milestones|project R&D milestones]] | * [[Tagged Beam R&D Milestones|project R&D milestones]] | ||
* [[Private:main detectors construction milestones|detector construction milestones (private)]] | * [[Private:main detectors construction milestones|detector construction milestones (private)]] | ||
− | |||
− | |||
* [[Private:Photon Beam and Tagger Instrumentation Paper (2010)|Photon beam and tagger instrumentation paper (2010)]] | * [[Private:Photon Beam and Tagger Instrumentation Paper (2010)|Photon beam and tagger instrumentation paper (2010)]] | ||
* [http://zeus.phys.uconn.edu/halld/tagger/sow-5-2010/Hall-D%20Tagger%20Dipole%20Magnet%20Specification%204-19-2010.pdf Statement of Work for tagger procurement (2010)] | * [http://zeus.phys.uconn.edu/halld/tagger/sow-5-2010/Hall-D%20Tagger%20Dipole%20Magnet%20Specification%204-19-2010.pdf Statement of Work for tagger procurement (2010)] |
Revision as of 12:29, 31 October 2012
Design requirements |
Spectrometers |
Instrumentation |
Radiator System |
Photon beam pipe |
Collimation system |
Sweep Magnet 1 |
Shielding and radiation doses |
Sweep magnet 2 |
Beam simulations |
This is the central reporting page for the
GlueX Tagged Photon Beam Working Group
- group meetings
- send email to group list
- browse mailing list archives
- working group members (private)
- project R&D milestones
- detector construction milestones (private)
- Photon beam and tagger instrumentation paper (2010)
- Statement of Work for tagger procurement (2010)
- Construction contracts and related info (private)