Difference between revisions of "Photon Beam"
From GlueXWiki
Line 37: | Line 37: | ||
* [[Tagged Beam Group Engineering Drawings|engineering drawings]] | * [[Tagged Beam Group Engineering Drawings|engineering drawings]] | ||
* [[Diamond Radiator Development|diamond radiator assessment]] | * [[Diamond Radiator Development|diamond radiator assessment]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 20:29, 28 November 2011
Design requirements |
Spectrometers |
Instrumentation |
Radiator System |
Photon beam pipe |
Collimation system |
Sweep Magnet 1 |
Shielding and radiation doses |
Sweep magnet 2 |
Beam simulations |
This is the central reporting page for the
GlueX Tagged Photon Beam Working Group
- group meetings
- send email to group list
- browse mailing list archives
- working group members (private)
- project R&D milestones
- instrumentation prototyping
- Nov. 2008 Tagger Review
- Photon beam and tagger instrumentation paper (2010)
- Statement of Work for tagger procurement (2010)