Difference between revisions of "Photon Beam"
From GlueXWiki
Senderovich (Talk | contribs) m |
|||
Line 41: | Line 41: | ||
** [[Microscope Prototype Beam Test]] | ** [[Microscope Prototype Beam Test]] | ||
*** [[Spring 2011 Hall B beam test: installation and running]] | *** [[Spring 2011 Hall B beam test: installation and running]] | ||
+ | *** [[Device for finding/verifying the beam plane location]] | ||
* [[Active Collimator Prototyping|active collimator prototyping]] | * [[Active Collimator Prototyping|active collimator prototyping]] | ||
* [[List of changes since the 2006 HallD Tagging Spectrometer and Photon Beamline Review|list of changes since 2006]] | * [[List of changes since the 2006 HallD Tagging Spectrometer and Photon Beamline Review|list of changes since 2006]] | ||
* [[Studies of Direct Photon Polarimetry Options]] | * [[Studies of Direct Photon Polarimetry Options]] |
Revision as of 10:00, 7 February 2011
Design requirements |
Spectrometers |
Instrumentation |
Radiator System |
Photon beam pipe |
Collimation system |
Sweep Magnet 1 |
Shielding and radiation doses |
Sweep magnet 2 |
Beam simulations |
This is the central reporting page for the
GlueX Tagged Photon Beam Working Group
- group meetings
- send email to group list
- browse mailing list archives
- working group members (private)
- project milestones
- Nov. 2008 Tagger Review
- Photon beam and tagger instrumentation paper (2010)
- Statement of Work for tagger procurement (2010)