=Wednesday, September 2=
 
=Wednesday, September 2=
 
# Last 24 hours:
 
# Last 24 hours:
 +
#* 6 am to 6 pm CPP de-installation, GEM/TRD installation
 
# Report/issues:
 
# Report/issues:
 
#* [https://logbooks.jlab.org/entry/3839039 FSDs vs RF system]  
 
#* [https://logbooks.jlab.org/entry/3839039 FSDs vs RF system]  
Line 20: Line 21:
 
# Pending issues:
 
# Pending issues:
 
#* TAGM missing channels due to preamp (Nick, Richard). [https://logbooks.jlab.org/entry/3834294 Update]
 
#* TAGM missing channels due to preamp (Nick, Richard). [https://logbooks.jlab.org/entry/3834294 Update]
# Run plan
+
# Run plan:
  
 
=Tuesday, September 1=
 
=Tuesday, September 1=

Revision as of 14:47, 1 September 2020

<- Back to Run Coordination Meetings:Summer2020

Integrated trigger count

GlueX Statistics Run Sheet


MEDCON 5 restrictions (Bob May email)

  1. adhere to counting room capacity restrictions
  2. maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
  3. wear masks anytime more than one person present in the counting room
  4. at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
  5. food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.

Wednesday, September 2

  1. Last 24 hours:
    • 6 am to 6 pm CPP de-installation, GEM/TRD installation
  2. Report/issues:
  3. Pending issues:
    • TAGM missing channels due to preamp (Nick, Richard). Update
  4. Run plan:

Tuesday, September 1

  1. Last 24 hours:
  2. Report/issues
  3. Pending issues:
    • TAGM missing channels due to preamp (Nick, Richard). Update
  4. Run plan
    • 6 am to 6 pm CPP de-installation, GEM/TRD installation
    • Ramp down the magnet
    • Preliminary schedule for DIRC/GEM/TRD running: continues through noon Thursday
      • 6 pm to 4 am, 10 hrs no-field run, 50nA on 10^-4 radiator.
      • 4 am to 10 am, ramp up magnet
    • Diamond alignment?
    • TAC run?
    • Rastering study?

Monday, August 31

  1. Last 72 hours:
  2. Report/issues
  3. Pending issues:
    • TAGM missing channels due to preamp (Nick, Richard). Update
  4. Run plan

Friday, August 28

  1. Last 24 hours:
    • 4.27B trigger
    • Beam down for 5hr30mn (weather + communication wrath)
    • Nick and Lubomir accessed the hall
  2. Report/issues
  3. Pending issues:
    • TAGM missing channels due to preamp (Nick, Richard). Update
  4. Run plan

Discussion on trigger/DAQ tests for the SRC/CT

  1. Sasha requested 5-6 hours on Sunday to do these tests

Discussion on CPP and GEM-TRD tests

CPP_Test_2020_-_Schedule

  1. Restricted access on 31st, RADCOM sweep will start at 6 am

Media:CPP_GEM_Test_install_schedule_Aug2020.pdf

Thursday, August 27

  1. Last 24 hours:
    • Due to Hall C current increase request, accelerator experimented with the optics => MCC recommended a HARP scan, 1st scan and 2nd scan
    • Production
    1. Many short trips - beam stable for 5 min and then trips
    2. We lost 8hrs ie runs 72873 to 72876 cannot be used in analysis
  2. Report/issues:
  3. Pending issues:
    • TAGM missing channels due to preamp (Nick, Richard). Update
  4. Run Plan

Discussion on trigger/DAQ tests for the SRC/CT

  1. Sasha requested 5-6 hours on Sunday to do these tests

Discussion on CPP and GEM-TRD tests

CPP_Test_2020_-_Schedule

  1. Restricted or controlled access for 31st depends on if there is 1/2 rack available or not

Media:CPP_GEM_Test_install_schedule_Aug2020.pdf