Search results

From GlueXWiki
Jump to: navigation, search

Page title matches

  • == Revised Draft GlueX By-law on Shift-taking [[(revised version as of 4-25-2014)]] == ...concerned with experimental data-taking. It does not deal with specialized shift-taking concerned with a particular detector or software element, nor with any othe
    5 KB (842 words) - 18:21, 2 May 2014
  • 0 B (0 words) - 08:47, 23 June 2015

Page text matches

  • *[[Draft By-law on Shift-taking | Draft By-law on Shift-taking]] Please [[Special:Userlogin|log in]] or [[Registering on the Wiki|register]] to add content.<br>
    10 KB (1,470 words) - 16:57, 28 March 2024
  • The DAQ system is generally kept running on the clon03 display(s) in the Hall-B counting house. Check first if it is th To kill the current DAQ processes, ssh into the ''halldrun'' account on clonxt2 and type "kill_daq". This will kill most of the DAQ processes, but
    16 KB (2,552 words) - 15:46, 1 October 2015
  • ...minimum photon energies needed for these tests. The module will be mounted on a support system in the Hall-B alcove area. The module will be illuminated ...s) and the support carriage weighs an additional 550 kg. The former rests on top of the latter and both are supported by a cart that has a motorized, co
    40 KB (6,903 words) - 11:09, 31 March 2015
  • ...ess the configuration used for a given run (which detectors were connected/on/off, trigger configuration, did the DAQ crash or did the data get written t ** Make png(?) files of important histograms on disk (hit occupancies, calibration plots, reconstructed track p vs. &theta;
    6 KB (859 words) - 06:22, 1 April 2015
  • ** Daily run meetings broadcasted on Bluejeans will occur at 8:45am in the counting house conference room. The R ...μm Al foils, and one 100 μm Al foil with a holed 10 μm Al foil pressed on it (3mm hole)).-->
    14 KB (2,187 words) - 16:28, 26 November 2018
  • #** SiPMPlus on green fibers [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?doci ...ns on consistency among Regina reports. Technical note coming from Regina on pedestal issue: positive overshoot of signal causes shift. All these are n
    2 KB (336 words) - 17:13, 24 February 2017
  • * [[Media:Online_Wolin_Mar_2009.pptx|Update]] on controls - Elliott Gerard called in to give a status report on FADC125 development.
    3 KB (508 words) - 17:14, 24 February 2017
  • ...ed in the directory <code>/group/halld/www/halldweb/html/talks/2015</code> on the JLab CUE. This directory is accessible from the web at https://halldweb #* Sean gave an update on the calibration challenge. He has been debugging batch jobs, and has made
    7 KB (1,131 words) - 17:13, 24 February 2017
  • ...ixed (in the lab). The degree of polarization of the coherent peak depends on the ratio of the photon energy to the end-point energy. ...symmetry &Sigma; for &pi;<sup>+</sup> and &pi;<sup>0</sup> photoproduction on the proton for photon energies from 1.102 to 1.862 GeV</i>, M. Dugger <i>et
    10 KB (1,589 words) - 22:38, 29 June 2015
  • to get up to speed on all things Hall D and all things FDC as we move - Beni will be focussing his efforts on the CDC, however, he will still
    11 KB (1,872 words) - 17:13, 24 February 2017
  • - We did some baseline pressure measurements on a single protootype layer. leak checking and pressure measurements tomorrow. Depending on what we
    8 KB (1,282 words) - 17:13, 24 February 2017
  • ## tagger harp scan shows sigma_x = 1.2 mm, sigma_y = 0.5 mm, optics on call will take a look ## Fast Feed-Back turned on and working...
    4 KB (595 words) - 23:00, 6 April 2016
  • ...halldweb.jlab.org/rcdb/runs/info/10293 10293] || x || Beam tuning. Working on SC timing (empty target? blocking collimator? no radiator?) ...rcdb/runs/info/10726 10726] || &#10003; || PARA orientation (shows UNKNOWN on the GUI) [https://logbooks.jlab.org/entry/3387672 log] [doublecheck]
    57 KB (7,278 words) - 21:41, 15 June 2016
  • ...ed in the directory <code>/group/halld/www/halldweb/html/talks/2016</code> on the JLab CUE. This directory is accessible from the web at https://halldweb Beni has been working on the calibration system.
    3 KB (432 words) - 19:45, 20 April 2016
  • ...ne code base, ...?) This will include how the single events will be passed on to the CODA 3 Event Recorder for writing to disk/tape. ...ing house, the experimental hall, and via a remote, secure connection (for on-call maintenance) will be required. How that will be done while minimizing
    29 KB (4,344 words) - 17:12, 24 February 2017
  • *# Decide on proper form of energy correction and recalibrate BCAL [https://halldweb.jla *# Check on status of SiPM cross-talk/after pulse separation (David)
    5 KB (789 words) - 17:08, 24 February 2017
  • ...in the directory <code>/group/halld/www/halldweb/html/talks/2011-2Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb * Five hundred Gauss on the cold head is maximum according to the manufacturer. Is this OK?
    4 KB (564 words) - 20:36, 31 March 2015
  • ...up is to determine the effect that summing multiple SiPM signals will have on the ultimate energy and timing resolutions. ...CAL channels would be read out. This threshold was calculated based purely on the dark hit rate for a single SiPM, assuming every SiPM would have a dedic
    8 KB (1,330 words) - 17:12, 24 February 2017
  • ...To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.< # More information on connecting to [[Connect to the Data Challenge Meetings|bluejeans]] is avail
    5 KB (833 words) - 12:39, 14 March 2017
  • ...iving, but tuning to 4R will not resume before Friday (i.e. accelerator is on schedule so no tuning work needed over holiday) # Report on Work in the Hall:
    1 KB (190 words) - 08:24, 1 December 2015

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)