FCAL Insert Module Fabrication

From GlueXWiki
Jump to: navigation, search

Task list

Main fabrication steps

Construction schedule

Fabricated modules (pre-production)

Final inventory of fabricated modules

Fabricated modules:

- CRYTUR
- SICCAS
-Statistics per week

Summer Students (2022)

Wrapped CRYTUR crystals (2022)

Parts for module fabrication

Removing SICCAS crystals from CCAL


Procedures:


  • Module_assembly
  • Crystal wrapping procedure
  • Glue light guide to the PMT
  • Silicone Cookies
  • CompCal strip brass brazing procedure
  • CompCal ESR reflector pre-shaping procedure
  • Checklist for quality assessment of modules
  • Removing signal cables from the FCAL

Assembled modules


Operational Safety Procedure (OSP)

Retrieved from "https://halldweb.jlab.org/wiki/index.php?title=FCAL_Insert_Module_Fabrication&oldid=122292"

Navigation menu

Views

  • Page
  • Discussion
  • View source
  • History

Personal tools

  • Log in

Navigation

  • Main page
  • Recent changes
  • Random page
  • Help

 

Tools

  • What links here
  • Related changes
  • Special pages
  • Printable version
  • Permanent link
  • Page information
  • Cite this page
Powered by MediaWiki
  • This page was last modified on 6 August 2023, at 20:27.
  • This page has been accessed 3,650 times.
  • Privacy policy
  • About GlueXWiki
  • Disclaimers