Search results
From GlueXWiki
Create the page "Sandoval" on this wiki! See also the search results found.
- ...sa, W. Boeglin, C. Hutton, M.M. Ito, M. Kamel, P. Khetarpal, A. LLodra, N. Sandoval, S. Taylor, T. Whitlatch, S. Worthington, C. Yero, B. Zihlmann, "The GlueX .... Semenov, F. Barbosa, E. Chudakov, M.M. Dalton, D. Lawrence, Y. Qiang, N. Sandoval, E.S. Smith, C. Stanislav, J.R. Stevens, S. Taylor, T. Whitlatch, B. Zihlma19 KB (2,649 words) - 15:13, 11 July 2023
- ...ent to the Hall yesterday to go through the Hot Checkout List. He and Nick Sandoval found 3 dead channels. On the scope there is a large DC offset on them; it2 KB (284 words) - 14:50, 3 December 2015
- ...reviewed the [https://logbooks.jlab.org/entry/3369430 log entry from Nick Sandoval]. Mark will follow up with Nick on any new news.3 KB (476 words) - 12:38, 14 March 2017
- The circuit boards for the SiPM read-out have come back and Nick Sandoval has assembled some using the 50 micron SiPM's we have on hand. The plan is3 KB (495 words) - 00:14, 1 April 2015
- Nick Sandoval reported to Mark that the some channels of the boards have been populated a3 KB (418 words) - 06:17, 1 April 2015
- ...activities for readout assemblies (Fernando Barbosa, Chris Stanislav, Nic Sandoval) ...activities for readout assemblies (Fernando Barbosa, Chris Stanislav, Nic Sandoval)4 KB (647 words) - 13:14, 14 May 2013
- We had a wide-ranging discussion of when would be a good time to send Nick Sandoval down to FIU to help set-up the electronics. Fernando proposed September, bu3 KB (534 words) - 17:22, 31 March 2015
- * We discussed when would be a good time for Nick Sandoval to do the initial electronics installation at FIU, as Fernando has proposed ...uction of the SiPM boards will start very soon according to Fernando. Nick Sandoval will be doing the work. They have already done the bias-voltage-requirement5 KB (833 words) - 00:14, 1 April 2015
- Discussions have been going on among Tim, Hussein, Tom Carstens, Nick Sandoval, and Fernando Barbosa on cable routes and needed cable trays. Cables will b4 KB (560 words) - 06:17, 1 April 2015
- ...time for a Readiness Review. We also need to review plans for having Nick Sandoval travel to FIU to set-up the electronics.2 KB (386 words) - 17:30, 31 March 2015
- When the items have been shipped to FIU, Nick Sandoval will go down and help to get the test set-up started. Fernando needs about5 KB (859 words) - 22:25, 31 March 2015
- * June 17: Nick Sandoval to FIU to set-up electronics.3 KB (477 words) - 06:26, 1 April 2015
- ...': Fernando Barbosa, Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Nick Sandoval, Beni Zihlmann4 KB (715 words) - 07:03, 1 April 2015
- * Eric reported that Nick Sandoval has all the cables and the MPOD crated and ready to ship. Nick is still doi ...rface of the SiPM go damaged. Eric has shipped the SiPM board back to Nick Sandoval. Nick will have a look and send back an up-to-date version of the board as5 KB (787 words) - 20:23, 31 March 2015
- * FIU asked about dates for Nick Sandoval's trip to Miami.3 KB (492 words) - 00:48, 1 April 2015
- * '''JLab''': Eugene Chudakov, Mark Ito (chair), Nick Sandoval, Beni Zihlmann3 KB (457 words) - 16:40, 31 March 2015
- ...ne of the TOF CAEN HV chassis. The entire chassis was not responding. Nick Sandoval and Chris Stanislav narrowed the problem down to a single module in the cha2 KB (288 words) - 16:23, 10 November 2017
- * '''JLab''': Eugene Chudakov, Mark Ito (chair), Bruce Lenzer, Nick Sandoval, Tim Whitlatch, Beni Zihlmann5 KB (799 words) - 17:04, 24 February 2017
- * Nick Sandoval (Fast Electronics Group)2 KB (250 words) - 15:23, 8 August 2014
- ...g from the ST-3 to the read-out electronics have not been strung yet. Nick Sandoval and Tim Whitlatch have a plan to run them downstairs through the same penet3 KB (453 words) - 21:32, 31 March 2015
- Eric reported that Nick Sandoval and Chris Stanislav did a systematic check of all cables in the Hall and [h2 KB (390 words) - 17:22, 31 March 2015
- ...web.jlab.org/wiki/images/6/63/DIRC_Controls_6718.pdf Presentation] by Nick Sandoval (June 2018)3 KB (388 words) - 11:55, 3 August 2022
- * Paul has asked Nick Sandoval and Chris Stanislav to transfer channel labeling, currently present only on5 KB (774 words) - 18:24, 7 July 2019
- He relies on spreadsheets obtained from Nick Sandoval for all of the cable connections. The database for TOF II (upgraded configu4 KB (617 words) - 11:51, 22 October 2019
- *Nick Sandoval comes in around 9:30 to shut things down in the hall ## Turn off blowers (only after LV supply is disconnected) -- Nick Sandoval7 KB (1,175 words) - 09:10, 26 March 2020
- ##* [https://logbooks.jlab.org/entry/3810885 Log Entry 3810885] (Nick Sandoval) ##* [https://logbooks.jlab.org/entry/3810885 Log Entry 3810885] (Nick Sandoval) Chiller alarms where a communications issue that is being resolved. At ou7 KB (1,073 words) - 11:07, 29 May 2020
- Nick Sandoval will come in to turn on some of the crates</s> All turned on except Microsc13 KB (2,263 words) - 16:09, 30 July 2020
- ***N. Sandoval installed insulators to ground connections.23 KB (3,522 words) - 08:01, 11 January 2022
- ...igh (several degrees C). See [https://logbooks.jlab.org/entry/3897599 Nick Sandoval's logbook entry for the details. Nick found some pins in the cable that had2 KB (318 words) - 12:04, 2 September 2021
- ** Nick Sandoval has test stands appropriate for both high and low voltage.7 KB (1,117 words) - 09:55, 26 January 2022
- #*Short Hall access by Nick Sandoval.19 KB (2,995 words) - 10:24, 15 June 2022
- **[https://logbooks.jlab.org/entry/4031313 The control system was checked (Sandoval)]6 KB (860 words) - 10:17, 24 August 2022
- **[https://logbooks.jlab.org/entry/4031313 The control system was checked (Sandoval)]6 KB (860 words) - 08:24, 26 August 2022