Difference between revisions of "Offline Monitoring Data Validation PrimEx"
From GlueXWiki
(Created blank page) |
|||
Line 1: | Line 1: | ||
+ | = Run Periods = | ||
+ | * [[RunPeriod-2016-02 Validation]] | ||
+ | * [[RunPeriod-2016-10 Validation]] | ||
+ | * [[RunPeriod-2017-01 Validation]] | ||
+ | * [[RunPeriod-2018-01 Validation]] | ||
+ | * [[RunPeriod-2018-08 Validation]] | ||
+ | * [[RunPeriod-2019-01 Validation]] | ||
+ | * [[RunPeriod-2019-11 Validation]] | ||
+ | * [[RunPeriod-2021-09 Validation]] | ||
+ | |||
+ | |||
+ | = Procedure = | ||
+ | |||
+ | For each production run, do the following: | ||
+ | |||
+ | * Go to the [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html Offline Run Browser] page. | ||
+ | * Follow the steps outlined in the checklist below. | ||
+ | * Workers should check each plot for their assigned subsystem and leave notes in the corresponding spreadsheet if any significant deviations are seen | ||
+ | * On the spreadsheet, enter "Y" in the "Overall Quality" field if all monitoring histograms are acceptable, otherwise enter "N" | ||
+ | * We will iterate this procedure until the process converges | ||
+ | |||
+ | === Expert Actions === | ||
+ | |||
+ | * Certify that each subsystem is okay | ||
+ | * Set run status in RCDB based on monitoring results | ||
+ | ** (script provided) | ||
+ | |||
+ | === Run Statuses === | ||
+ | |||
+ | * -1 - unchecked | ||
+ | * 0 - rejected (not physics-quality) | ||
+ | * 1 - approved | ||
+ | * 2 - approved long/"mode 8" data | ||
+ | * 3 - calibration / systematic studies |
Revision as of 19:28, 28 October 2021
Run Periods
- RunPeriod-2016-02 Validation
- RunPeriod-2016-10 Validation
- RunPeriod-2017-01 Validation
- RunPeriod-2018-01 Validation
- RunPeriod-2018-08 Validation
- RunPeriod-2019-01 Validation
- RunPeriod-2019-11 Validation
- RunPeriod-2021-09 Validation
Procedure
For each production run, do the following:
- Go to the Offline Run Browser page.
- Follow the steps outlined in the checklist below.
- Workers should check each plot for their assigned subsystem and leave notes in the corresponding spreadsheet if any significant deviations are seen
- On the spreadsheet, enter "Y" in the "Overall Quality" field if all monitoring histograms are acceptable, otherwise enter "N"
- We will iterate this procedure until the process converges
Expert Actions
- Certify that each subsystem is okay
- Set run status in RCDB based on monitoring results
- (script provided)
Run Statuses
- -1 - unchecked
- 0 - rejected (not physics-quality)
- 1 - approved
- 2 - approved long/"mode 8" data
- 3 - calibration / systematic studies