Line 42: | Line 42: | ||
** All optical fibers are ready for installation, the mounting plate to the integrating sphere is under production, will be ready soon. | ** All optical fibers are ready for installation, the mounting plate to the integrating sphere is under production, will be ready soon. | ||
*'''Analysis/Simulation''' | *'''Analysis/Simulation''' | ||
+ | ** Added new JEF simulation page to [https://halldweb.jlab.org/wiki/index.php/JEF_Simulations wiki] | ||
** [https://halldweb.jlab.org/wiki/images/e/ef/Rate_studies.pdf Rate simulation studies] | ** [https://halldweb.jlab.org/wiki/images/e/ef/Rate_studies.pdf Rate simulation studies] |
Revision as of 10:26, 17 November 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables: all cables are ready. Received all needed long cables. Need to test redo 4 bundles (48 cables have been tested)
- - signal patch panels are ready [1]
- - HV cables: have received 50 short cables, have been testes and labeled. 440 cables are ready for installation. 36 long cables are in production
- - HV distribution boards: Chris is finalizing design of the distribution board, should order 4 boards soon.
- - LV cables: ordered, lead time unclear
- - LV distribution boards. The design of the LV distribution board has been finalized (discussion with Fernando, the power regulators will not be added to the design)
- - Optical fibers: received all
- Ongoing projects -- Sasha, all
- - Testing and labeling cables (Recently labeled cables in boxes)[2]
- - Prepare modules for the TAC and prototypes (using crystals with some imperfections) [3]
- Wrapped crystals - done
- Parts for TAC[4] - done
- Modules for prototype (25 are ready) - done
- - Preparation of the LMS [5]
- - 3-D print and machine mounting plate (coupling to the integrating sphere]
- - 3-D print support structure for gluing fibers to the mounting plate [Boby]
- - Machined Al plate for fiber polishing
- - Installing fibers; will start gluing soon [6][7]
- - The LMS should be ready for the installation on the detector during next week.
- - Installation of the trigger and readout electronics
- - Summer Students (2023)
- Testing of PMT dividers -- Sasha / Vlad / Aoran / Boaxin
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob
- Light monitoring system
- All optical fibers are ready for installation, the mounting plate to the integrating sphere is under production, will be ready soon.
- Analysis/Simulation
- Added new JEF simulation page to wiki
- Rate simulation studies