New version of the active base
Fig. 1 Connectors on the new base
Fig. 2 Connectors on the new base
Fig. 3 Extension of the PCB to accommodate the new connector
Final test of dividers
Bench tests
Fig. 1 Setup for testing PMT dividers
Fig. 2 Bypassed amplifier, small amplitude
Fig. 3 Bypassed amplifier, large amplitude
Fig. 3 Amplifier gain 3, small amplitude
Study noise inside FCAL
Installing 5x5 prototype on CCAL
Fig. 1 - Front view of the CCAL
Fig. 2 - Rear view of the CCAL
Fig. 3 - List of modules installe
Cables, and patch panels
Fig. 1 - Cables connected to the FCAL2 dividers (signal, HV, and LV)
Fig. 2 - Cables connected to the FCAL2 dividers (signal, HV, and LV)
Fig. 3 - Closer look of dividers
Fig. 4 - Patch panels: LV distribution for the 5x5 prototype (right)
Fig. 5 - Patch panel from the outside of the CCAL (the MPOD connector is on the left)
Tuning dividers after the CCAL beam test
Fig. 1 Original base before saturation
Fig. 2 Original base, A = 1.8 V