Difference between revisions of "JEF meeting, May 10, 2024"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 22: Line 22:
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 
*** (links from the previous meetings [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg])
 
*** (links from the previous meetings [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg])
* Summer students -- Sasha
+
* '''Summer students''' -- Sasha
 
** - 2 students from UNCW (May 15), 1 student from GWU (May 19)
 
** - 2 students from UNCW (May 15), 1 student from GWU (May 19)
 
** - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
 
** - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
** '''Beam tests with the PS'''
+
* '''Beam tests with the PS'''
 
***  measure shower beam profile and reconstruction in the crystal/LG transition region  
 
***  measure shower beam profile and reconstruction in the crystal/LG transition region  
 
***  (install prototype with 5x5 PbWO4 modules  + ? LG)  
 
***  (install prototype with 5x5 PbWO4 modules  + ? LG)  
** '''Other hardware projects'''
+
* '''Other hardware projects'''
*** --prototype of the ECAL veto counter
+
*** --prototype of the ECAL veto counter (?)
 
*'''FCAL2 poster for open house?'''
 
*'''FCAL2 poster for open house?'''
 
** JEF/ECAL/FCAL poster  (Laveen + students)   
 
** JEF/ECAL/FCAL poster  (Laveen + students)   
 
*'''Analysis/Simulation'''
 
*'''Analysis/Simulation'''

Revision as of 08:41, 10 May 2024

Meeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - signal cables and 2 patch panels [1] - done
    • - HV short cables: done
    • - HV long cable, 18 ready (out of 36)
    • - HV distribution boards: not designed
    • - LV cables: waiting for about 20 cables
    • - LV distribution boards [2]. One board out of 4 is ready
    • - LED: the prototype of the LED board has been received. Chris will populate it with components
  • Ongoing projects
  • Testing of PMT dividers -- Sasha / Vlad / George / Mindy
    • - Testing procedure [3]
    • - All dividers have been fabricated and tested by George [4]
      • Continue removing regulators from the PCB (about 70 regulators have been removed, require re-test divider)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
  • Summer students -- Sasha
    • - 2 students from UNCW (May 15), 1 student from GWU (May 19)
    • - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
  • Beam tests with the PS
      • measure shower beam profile and reconstruction in the crystal/LG transition region
      • (install prototype with 5x5 PbWO4 modules + ? LG)
  • Other hardware projects
      • --prototype of the ECAL veto counter (?)
  • FCAL2 poster for open house?
    • JEF/ECAL/FCAL poster (Laveen + students)
  • Analysis/Simulation