Difference between revisions of "JEF meeting, March 3, 2023"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 17: Line 17:
 
*** Mindy (DSG group) solder wires to sockets (while waiting for crystals)
 
*** Mindy (DSG group) solder wires to sockets (while waiting for crystals)
  
 +
<!--
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 835 (ALL available CRYTUR) ]  
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 835 (ALL available CRYTUR) ]  
  
Line 26: Line 27:
 
*** CCAL moved to the ESB  
 
*** CCAL moved to the ESB  
 
*** [[All modules (with SICCAS crystals) are removed]]
 
*** [[All modules (with SICCAS crystals) are removed]]
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts]
+
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts] -->
 
*** Some PMT housing are missing ( > 60, trying to find with Tim)
 
*** Some PMT housing are missing ( > 60, trying to find with Tim)
 
* '''Module fabrication'''  -- Sasha
 
* '''Module fabrication'''  -- Sasha

Revision as of 18:31, 2 March 2023

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation of parts for FCAL2 modules -- Sasha
    • Available crystals:
      1450 (modules)
      32 (ready for fabrication)
      40 (installed on CCAL) available on March 20
      (some CCAL crystals from the inner part will not be used for the FCAL2)
      95 expect to receive from CRYTUR in May [1]
      Total 1617
    • Wrapped crystals: 32 (Mindy)
      • George (DSG group) finished with disassembling CCAL modules and removing LMS caps
      (work on preshaping of ESR reflectors for CRYTUR)
      • Mindy (DSG group) solder wires to sockets (while waiting for crystals)

during next week. The CCAL prototype should be ready by the end of next week (?)