Difference between revisions of "JEF meeting, March 3, 2023"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 15: Line 15:
 
*** George (DSG group) finished with disassembling CCAL modules and removing LMS caps
 
*** George (DSG group) finished with disassembling CCAL modules and removing LMS caps
 
::: (work on preshaping ESR reflectors)
 
::: (work on preshaping ESR reflectors)
 
+
*** Mindy (DSG group) solder wires to sockets (while waiting for crystals)
  
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 835 (ALL available CRYTUR) ]  
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 835 (ALL available CRYTUR) ]  

Revision as of 18:27, 2 March 2023

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation of parts for FCAL2 modules -- Sasha
    • Available crystals:
      1450 (modules)
      32 (ready for fabrication)
      40 (installed on CCAL) available on March 20
      (some CCAL crystals from the inner part will not be used for the FCAL2)
      95 expect to receive from CRYTUR in May [1]
      Total 1617
    • Wrapped crystals: 32 (Mindy)
      • George (DSG group) finished with disassembling CCAL modules and removing LMS caps
(work on preshaping ESR reflectors)
      • Mindy (DSG group) solder wires to sockets (while waiting for crystals)
      • Available for wrapping: 60 SICCAS crystals from CCAL && prototype [2] [3]

during next week. The CCAL prototype should be ready by the end of next week (?)