Difference between revisions of "JEF meeting, March 3, 2023"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 8: Line 8:
 
::: 1450 (modules)  
 
::: 1450 (modules)  
 
::: 32 (ready for fabrication)  
 
::: 32 (ready for fabrication)  
::: 40 (installed on CCAL)
+
::: 40 (installed on CCAL)  (some CCAL crystals from the inner part will not be used for the FCAL2)
 
+
::: 95 expect to receive from CRYTUR in May [https://halldweb.jlab.org/wiki/index.php/CRYTUR ]
+ 40 [https://halldweb.jlab.org/wiki/index.php/CRYTUR ]
+
:::: Total 1617
*** Expect to receive 95 more CRYTUR crystals in May (835 + 95 = 930 in total)
+
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 835 (ALL available CRYTUR) ]  
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 835 (ALL available CRYTUR) ]  
 
*** Available for wrapping: 60 SICCAS crystals from CCAL && prototype [https://halldweb.jlab.org/wiki/index.php/All_modules_(with_SICCAS_crystals)_are_removed] [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/ccal_crystals.pdf]
 
*** Available for wrapping: 60 SICCAS crystals from CCAL && prototype [https://halldweb.jlab.org/wiki/index.php/All_modules_(with_SICCAS_crystals)_are_removed] [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/ccal_crystals.pdf]

Revision as of 18:10, 2 March 2023

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation of parts for FCAL2 modules -- Sasha
    • Available crystals:
1450 (modules)
32 (ready for fabrication)
40 (installed on CCAL) (some CCAL crystals from the inner part will not be used for the FCAL2)
95 expect to receive from CRYTUR in May [1]
Total 1617

during next week. The CCAL prototype should be ready by the end of next week (?)