Difference between revisions of "JEF meeting, March 3, 2023"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 6: Line 6:
 
*'''Preparation of parts for FCAL2 modules''' -- Sasha  
 
*'''Preparation of parts for FCAL2 modules''' -- Sasha  
 
** Available crystals:  
 
** Available crystals:  
::: 1450 (modules) + 32 (ready for fabrication) + 40
+
::: 1450 (modules)  
  [https://halldweb.jlab.org/wiki/index.php/CRYTUR ]
+
::: 32 (ready for fabrication)  
 +
::: 40 (installed on CCAL)
 +
 
 +
+ 40 [https://halldweb.jlab.org/wiki/index.php/CRYTUR ]
 
*** Expect to receive 95 more CRYTUR crystals in May (835 + 95 = 930 in total)
 
*** Expect to receive 95 more CRYTUR crystals in May (835 + 95 = 930 in total)
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 835 (ALL available CRYTUR) ]  
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 835 (ALL available CRYTUR) ]  

Revision as of 18:07, 2 March 2023

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation of parts for FCAL2 modules -- Sasha
    • Available crystals:
1450 (modules)
32 (ready for fabrication)
40 (installed on CCAL)

+ 40 [1]

during next week. The CCAL prototype should be ready by the end of next week (?)