Difference between revisions of "JEF meeting, March 24, 2023"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 33: Line 33:
 
**: Translation tables [https://halldweb.jlab.org/wiki/index.php/FCAL2_Crates]
 
**: Translation tables [https://halldweb.jlab.org/wiki/index.php/FCAL2_Crates]
 
* '''Light Monitoring System''' -- Arshak
 
* '''Light Monitoring System''' -- Arshak
 +
** [https://userweb.jlab.org/~aasatury/Fcal_LMS/lms_update_march_23.pdf Update on LMS]
 
* '''Simulations/Analysis'''
 
* '''Simulations/Analysis'''

Revision as of 09:27, 24 March 2023

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation of parts for FCAL2 modules -- Sasha
    • Available crystals:
      1450 (modules)
      32 (ready for fabrication)
      40 (installed on CCAL) available on March 20
      (some CCAL crystals from the inner part will not be used for the FCAL2)
      95 expect to receive from CRYTUR in May [1]
      Total 1617
    • George (DSG group) finished with disassembling CCAL modules and removing LMS caps. Will work on preshaping ESR reflectors for CRYTUR. The oven will be ready in a week.
    • Mindy (DSG group) solder wires to sockets (while waiting for crystals). More crystals will come from the CCAL during next week.
  • Module fabrication -- Sasha
    • Fabricated modules: Total 1482 (12 modules fabricated since last week)
      Currently available for fabrication: 0
  • Testing of PMT dividers -- Sasha / Arshak
    • FCAL2 modules with dividers installed on the CCAL [2]
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
  • Light Monitoring System -- Arshak
  • Simulations/Analysis