JEF meeting, March 24, 2023

From GlueXWiki
Jump to: navigation, search

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation of parts for FCAL2 modules -- Sasha
    • Available crystals:
      1450 (modules)
      32 (ready for fabrication)
      40 (installed on CCAL) available on March 20
      (some CCAL crystals from the inner part will not be used for the FCAL2)
      95 expect to receive from CRYTUR in May [1]
      Total 1617
    • Olga brought about 200 Silicon cookies from GW. The quality is good.
    • George (DSG group) finished with disassembling CCAL modules and removing LMS caps. Will work on preshaping ESR reflectors for CRYTUR. The oven will be ready in a week.
    • Mindy (DSG group) solder wires to sockets (while waiting for crystals). More crystals will come from the CCAL during next week.
  • Module fabrication -- Sasha
    • Fabricated modules: Total 1482 (12 modules fabricated since last week)
      Currently available for fabrication: 0
  • Testing of PMT dividers -- Sasha / Arshak
    • FCAL2 modules with dividers installed on the CCAL [2]
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
  • Light Monitoring System -- Arshak
  • Simulations/Analysis

Minutes

Attendees: Igal, Sasha, Arshak, Bill, Olga, Justin, Eugene, Liping, Jon, Zisis, Jane, S.T.

  • Olga brought 200 cookies -- have enough to cover everything + some spares
  • COMCAL was moved to ESB to be disassembled (as of the meeting it was slightly activated)
  • 1482 FCAL-2 modules have been fabricated to date
  • Design for patch panels for HV has been slightly revised, will be positioned outside FCAL dark box
  • Settled on ECAL (like FCAL, CCAL, etc.) for the name for the insert as far the translation table, etc. is concerned
  • Low voltage connection to PCB revised to use locking connector
    • Also no longer using unshielded ribbon cables for LV distribution
    • One new PCB with new divider design has been procured -- will need to make the full order soon
  • Sasha performed some tests using 3x amplification using beam -- linearity was good
  • Arshak/Vlad/Sasha to meet with Dave Kashy (who worked on HyCAL for Hall B) regarding any engineering concerns/gotchas we may have overlooked
  • We had a long discussion about the proposed GEMTRD test in Hall-D using the GlueX detector with the FCAL insert
    • Plan revised from original 10 PAC days to a 7 calendar day test run for a small-scale GEMTRD prototype
      • Much back-and-forth regarding how/when to schedule this test run during the ~212 day GlueX/JEF run period starting in 2024
      • A compromise to install the GEMTRD during the winter break of the run period and run the test when the program starts back up after Christmas was proposed
    • Impact of insert region for e/pi separation should be considered
  • Arshak showed a design for the individual fiber solution for the LMS that accommodates rohacel support in the inset region
    • Does the stress analysis suggest that we need this foam?
  • Arshak presented pros and cons for the plexiglas and individual fiber solutions for the LMS, but no decision was made at the meeting.