Difference between revisions of "JEF meeting, January 27, 2023"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 24: | Line 24: | ||
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/11_11_22 Moving modules to the new lab (EEL108)] | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/11_11_22 Moving modules to the new lab (EEL108)] | ||
* '''[[Testing of PMT dividers]]''' -- Sasha / Arshak | * '''[[Testing of PMT dividers]]''' -- Sasha / Arshak | ||
− | ** | + | ** Most parts for dividers have been received |
− | ** | + | ** 25 dividers for the prototype are ready (have to be tested), expect to receive the LV patch panel prototype |
+ | during next week. The CCAL prototype should be ready by the end of next week (?) | ||
* '''Installation of the FCAL2 detector''' -- Sasha / Arshak | * '''Installation of the FCAL2 detector''' -- Sasha / Arshak | ||
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] |
Revision as of 09:51, 27 January 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation of parts for FCAL2 modules -- Sasha
- Received all 150 CRYTUR crystals from physics division (22-C0275) [1]
- Expect to receive 95 more CRYTUR crystals in May (835 + 95 = 930 in total)
- Wrapped CRYTUR crystals: 835 (ALL available CRYTUR)
- Disassembling CCAL
- CCAL moved to the ESB
- All modules (with SICCAS crystals) are removed
- List of available parts
- Some PMT housing are missing ( > 60, trying to find with Tim)
- Received all 150 CRYTUR crystals from physics division (22-C0275) [1]
- Module fabrication -- Sasha
- Fabricated modules: Total 1413 (3 modules fabricated since last week)
- Testing of PMT dividers -- Sasha / Arshak
- Most parts for dividers have been received
- 25 dividers for the prototype are ready (have to be tested), expect to receive the LV patch panel prototype
during next week. The CCAL prototype should be ready by the end of next week (?)
- Installation of the FCAL2 detector -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group
- Manpower and division of tasks
- Projects for summer students
- Meeting with the detector imaging group
- Light Monitoring System -- Arshak
- Simulations/Analysis