+ | ==Contract Status== | ||
+ | |||
+ | Mark reported that the FSU proposal was received by Procurement. A technical review committee has been formed: | ||
+ | * Dan Carman | ||
+ | * Mark Ito | ||
+ | * Elton Smith | ||
+ | * Beni Zihlmann | ||
+ | We should be getting materials from Procurement this afternoon. | ||
+ | |||
+ | ==PMT Purchase== | ||
+ | |||
+ | Hamamatsu has received the RFP from Procurement and submitted a set of questions. Mark sent answers back to Procurement. | ||
+ | |||
+ | ==Calibration and Alignment== | ||
+ | |||
+ | Mark raised the collaboration-wide effort to come up with a calibration plan for each detector subsystem. We need to start work on this for the TOF soon. | ||
+ | |||
+ | ==Technical Design Report Contribution== | ||
+ | |||
+ | Mark mentioned the effort to write an up-to-date [[??|Technical Design Report]] for GlueX. He is hoping that Paul will be able to take a look at the TOF section. | ||
full, split, short short split full model | full, split, short short split full model |
Revision as of 14:16, 29 March 2012
Thursday, March 29, 2012
10:00 am EDT
JLab: CEBAF Center, F326/327
Contents
Agenda
- Announcements
- Review of previous meetings
- Mechanical design: Tim, Chuck
- Prototype status: Paul, Sasha
- TDC choice: all
- Contract Status: Mark, Paul
- Calibration and Alignment
- Technical Design Report contribution
Communication
Videoconference
- ESNet: 8542553
- EVO: EVO site
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-1Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-1Q/ .
Chairman's Cell Phone
(757)504-0664
Minutes
Present:
- FSU: Sasha Ostrovidov
- JLab: Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Tim Whitlatch
Contract Status
Mark reported that the FSU proposal was received by Procurement. A technical review committee has been formed:
- Dan Carman
- Mark Ito
- Elton Smith
- Beni Zihlmann
We should be getting materials from Procurement this afternoon.
PMT Purchase
Hamamatsu has received the RFP from Procurement and submitted a set of questions. Mark sent answers back to Procurement.
Calibration and Alignment
Mark raised the collaboration-wide effort to come up with a calibration plan for each detector subsystem. We need to start work on this for the TOF soon.
Technical Design Report Contribution
Mark mentioned the effort to write an up-to-date Technical Design Report for GlueX. He is hoping that Paul will be able to take a look at the TOF section.
full, split, short short split full model