Difference between revisions of "BLTWG Meeting 01/07/2013"

From GlueXWiki
Jump to: navigation, search
(Organization)
m (moved BLTWG Meeting 01/07/2012 to BLTWG Meeting 01/07/2013: because the year was wrong)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
* Place: ESNET and telephone 866-740-1260 (access code 3421244#)
 
* Place: ESNET and telephone 866-740-1260 (access code 3421244#)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present: Richard J., James M., Alex B., Curtis M., Tim W., Alex S., Dan S.,  
+
* Present: Richard J., James M., Alex B., Curtis M., Tim W., Alex S., Dan S., Barry R., Mike D., Franz K., Ivan T., Eugene C., and Yi Q.
 
----
 
----
  
Line 11: Line 11:
 
# Communication with Yang regarding TOSCA maps - ''Richard''
 
# Communication with Yang regarding TOSCA maps - ''Richard''
 
# [http://faculty.cua.edu/sober/HallD/Tosca_fringe_field_calculations.html Working with the existing tagger magnet map] - ''Dan''
 
# [http://faculty.cua.edu/sober/HallD/Tosca_fringe_field_calculations.html Working with the existing tagger magnet map] - ''Dan''
 +
#* [http://faculty.cua.edu/sober/HallD/magnet+fp.pdf magnet + fp drawing]
 
# [[Media:fa_test.pdf | Study of H10580 high-rate performance ]] - ''All''
 
# [[Media:fa_test.pdf | Study of H10580 high-rate performance ]] - ''All''
 
# Preparations for the PS detector construction - ''Ivan''
 
# Preparations for the PS detector construction - ''Ivan''

Latest revision as of 10:29, 4 March 2013

Organization

  • Time: 11:30 EST
  • Place: ESNET and telephone 866-740-1260 (access code 3421244#)
  • Connecting: instructions are here
  • Present: Richard J., James M., Alex B., Curtis M., Tim W., Alex S., Dan S., Barry R., Mike D., Franz K., Ivan T., Eugene C., and Yi Q.

Agenda

  1. Announcements
  2. Desktop conferencing (EVO alternatives) - Richard
  3. Communication with Yang regarding TOSCA maps - Richard
  4. Working with the existing tagger magnet map - Dan
  5. Study of H10580 high-rate performance - All
  6. Preparations for the PS detector construction - Ivan
  7. Site visit for the UConn construction contract - Alex
  8. Progress toward the CUA construction contract - Franz
  9. Update from Arizona State - Mike
  10. Preparations for the microscope construction - James
  11. Meeting with accelerator about active collimator - Alex