Difference between revisions of "BLTWG Meeting 01/07/2013"

From GlueXWiki
Jump to: navigation, search
(Organization)
(Agenda)
Line 11: Line 11:
 
# Communication with Yang regarding TOSCA maps - ''Richard''
 
# Communication with Yang regarding TOSCA maps - ''Richard''
 
# [http://faculty.cua.edu/sober/HallD/Tosca_fringe_field_calculations.html Working with the existing tagger magnet map] - ''Dan''
 
# [http://faculty.cua.edu/sober/HallD/Tosca_fringe_field_calculations.html Working with the existing tagger magnet map] - ''Dan''
 +
# [[Media:fa_test.pdf | Study of H10580 high-rate performance ]] - ''All''
 
# Preparations for the PS detector construction - ''Ivan''
 
# Preparations for the PS detector construction - ''Ivan''
 
# Site visit for the UConn construction contract - ''Alex''
 
# Site visit for the UConn construction contract - ''Alex''

Revision as of 12:35, 7 January 2013

Organization

  • Time: 11:30 EST
  • Place: ESNET and EVO (SeeVogh??) - telephone bridge id 625 4948
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Desktop conferencing (EVO alternatives) - Richard
  3. Communication with Yang regarding TOSCA maps - Richard
  4. Working with the existing tagger magnet map - Dan
  5. Study of H10580 high-rate performance - All
  6. Preparations for the PS detector construction - Ivan
  7. Site visit for the UConn construction contract - Alex
  8. Progress toward the CUA construction contract - Franz
  9. Update from Arizona State - Mike
  10. Preparations for the microscope construction - James
  11. Meeting with accelerator about active collimator - Alex