Uncategorized pages
From GlueXWiki
Showing below up to 50 results in range #651 to #700.
View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)
- April 11, 2012 Tracking CDC/FDC
- April 11, 2014 Design Meeting
- April 11, 2017 DIRC
- April 12, 2010 (11AM), Physics Working Group
- April 12, 2011 SiPM Electrical and Cooling
- April 12, 2013 Installation
- April 12, 2017, Production & Analysis Working Group
- April 12, 2018 DIRC Optical Box
- April 12, 2018 Transport Meeting with SLAC
- April 12, 2023, FCAL Insert Installation Meeting
- April 13, 2009 (11AM), Physics Working Group
- April 13, 2011 Tracking CDC/FDC
- April 13, 2012 Fab Meeting
- April 13, 2020 DIRC
- April 13, 2022 Calorimeter
- April 13, 2023
- April 14, 2010 Tracking CDC/FDC
- April 14, 2022 DIRC
- April 14, 2022 KLONG Phase II Design Meeting
- April 15, 2008 Calorimetry
- April 15, 2011 Design/Fab mtg
- April 15, 2019
- April 16, 2019 DIRC
- April 16, 2021 DIRC
- April 17, 2007 Software
- April 18, 2016, Physics Working Group
- April 19, 2011 SiPM Electrical and Cooling
- April 19, 2013 PID Upgrade
- April 19, 2017, Production & Analysis Working Group
- April 19, 2018 DIRC
- April 2, 2015 PID Upgrade
- April 2, 2019 DIRC
- April 2, 2020 CPP Design Meeting
- April 2, 2021 DIRC
- April 20, 2009 Tracking CDC/FDC
- April 20, 2012 (4:00PM), Physics Working Group
- April 20, 2016 Calibration
- April 20, 2023
- April 20, 2023, FCAL Insert Installation Meeting
- April 20-21, 2020 DIRC
- April 21, 2008 Calorimetry
- April 21, 2014, Physics Working Group
- April 22, 2009 Software
- April 22, 2010 Readout
- April 22, 2013, Physics Working Group
- April 22, 2015 Calibration
- April 22, 2016 PID Upgrade
- April 22, 2021 CPP Design Meeting
- April 22, 2022 Tech group SAD meeting
- April 23, 2012 (11:30AM), Physics Working Group