Uncategorized pages
From GlueXWiki
Showing below up to 50 results in range #2,651 to #2,700.
View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)
- February 8, 2017 Calibration
- February 8, 2018 DIRC
- February 8, 2024
- February 9, 2009 Tracking CDC/FDC
- February 9, 2010 Tracking CDC/FDC
- February 9, 2015
- February 9, 2015, Physics Working Group
- February 9, 2023
- February xx, 2009 Physics
- Feburary 25, 2009 Software
- Feedback from Barry Ritchie/ Tue Apr 14
- Feedback from Joerg
- Fernando's email
- Fiber Spectra - Regina
- Fiber Test Results K
- Fiber Test Stand at JLAB
- Fiber Test with SiPM
- Fiber Tests at Regina
- Fiber lengths
- Fiber test stand
- Field Bus and Controller Specifications
- Field stability study
- File:BillMerzMail
- Fill the spreadsheet
- Final Design
- Final Versions
- Final Versions of Proposed Bylaw and Management Plan changes
- Final test of dividers
- Finalizing design of the vacuum chamber
- First - 50"
- First Batch (192 crystals)
- First CDC straw alignment offsets
- First Level Trigger review layout
- First Tests in Hall-D
- First effort on raw data tape simulation
- First fiber tests
- First look at TOF calibration
- First look at TOF data from Fall 2014
- First look at cross sections from Spring 2017 run
- First measurement of near-threshold J/ψ exclusive photoproduction off the proton
- First signals
- First test
- Fixed array: design
- Flash talks
- Flatness plots and discussion
- Flow rate
- Flux and luminosity
- Flux and luminosity 2021
- Follow-up to discussion July 24, 2012 discussion on BCAL timing
- Follow up on the Hodoscope Fabrication Readiness Review