Run Planning Meeting Notes, September 3 - 9, 2020
From GlueXWiki
<- Back to Run Coordination Meetings:Summer2020
MEDCON 5 restrictions (Bob May email)
- adhere to counting room capacity restrictions
- maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
- wear masks anytime more than one person present in the counting room
- at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
- food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.
Thursday, September 3
- Last 24 hours:
- 6 am to 9 pm CPP de-installation, GEM/TRD installation
- Magnet ramping down re-started at 3 pm and should be finished around 5:30 pm
- Start to take data at 10:15 pm
- Good data taking started at 4:00 am
- Reports/issues:
- Test results of PWO crystals (test 5)
- DAQ issues, random pulser was left on from the CPP run yesterday morning, which was swamping the DAQ with too many triggers
- Pending issues:
- TAGM missing channels due to preamp (Nick, Richard). Update
- Run plan
- Ramping up magnet at 10 am
- Diamond 0/90 PARA
- 2 hours: focused FCAL trigger in GEM location (FCAL_TRACK_CENT_m9.conf)
- 8 hours: standard FCAL-BCAL trigger at 150 nA (low energy TAGH turned on)
- 4 hours: standard FCAL-BCAL trigger at 250 nA (low energy TAGH turned off)
- 4 hours: standard FCAL-BCAL trigger at 350 nA (low energy TAGH turned off)