Offline Monitoring Data Validation PrimEx
From GlueXWiki
Run Periods
- RunPeriod-2016-02 Validation
- RunPeriod-2016-10 Validation
- RunPeriod-2017-01 Validation
- RunPeriod-2018-01 Validation
- RunPeriod-2018-08 Validation
- RunPeriod-2019-01 Validation
- RunPeriod-2019-11 Validation
- RunPeriod-2021-09 Validation
Procedure
For each production run, do the following:
- Go to the Offline Run Browser page.
- Follow the steps outlined in the checklist below.
- Workers should check each plot for their assigned subsystem and leave notes in the corresponding spreadsheet if any significant deviations are seen
- On the spreadsheet, enter "Y" in the "Overall Quality" field if all monitoring histograms are acceptable, otherwise enter "N"
- We will iterate this procedure until the process converges
Expert Actions
- Certify that each subsystem is okay
- Set run status in RCDB based on monitoring results
- (script provided)
Run Statuses
- -1 - unchecked
- 0 - rejected (not physics-quality)
- 1 - approved
- 2 - approved long/"mode 8" data
- 3 - calibration / systematic studies