Difference between revisions of "JEF meeting, May 24, 2024"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 7: | Line 7: | ||
** - HV distribution boards: has not yet been designed, need 4 boards | ** - HV distribution boards: has not yet been designed, need 4 boards | ||
** - LV cables: missing about 20 cables, waiting for the last delivery batch. | ** - LV cables: missing about 20 cables, waiting for the last delivery batch. | ||
− | ** - LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/cables/lv_distribution/lv_dist_board.jpg ]. One board out of 4 is ready | + | ** - LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/cables/lv_distribution/lv_dist_board.jpg ]. One board out of 4 is ready, using for testing dividers |
− | ** - LED: | + | ** - LED: prototype board is ready, have to start testing |
− | * '''Ongoing projects''' | + | * '''Ongoing projects''' - All |
** - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_10_2024/May-10-2024-L.pdf Update from Laveen] | ** - [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/05_10_2024/May-10-2024-L.pdf Update from Laveen] | ||
** - Testing, labeling and bundling LV cables | ** - Testing, labeling and bundling LV cables |
Revision as of 23:04, 23 May 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - HV long cable, 18 ready (out of 36), discussion with the DSG group regarding help
- - HV distribution boards: has not yet been designed, need 4 boards
- - LV cables: missing about 20 cables, waiting for the last delivery batch.
- - LV distribution boards [1]. One board out of 4 is ready, using for testing dividers
- - LED: prototype board is ready, have to start testing
- Ongoing projects - All
- - Update from Laveen
- - Testing, labeling and bundling LV cables
- Testing of PMT dividers -- Sasha / Vlad / George / Mindy
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Summer students -- Sasha
- - 2 students from UNCW (May 15), 1 student from GWU (May 19) All paper work has been completed, they are ready to come.
- - Projects: document all test results, assist with the cable/divider installation, install signal cables on patch panel, work on the ECAL monitoring plots
- Beam tests with the PS
- measure shower beam profile and reconstruction in the crystal/LG transition region
- (install prototype with 5x5 PbWO4 modules + ? LG)
- Other hardware projects
- prototype of the ECAL veto counter (?)
- FCAL2 posters for open house
- JEF/ECAL/FCAL poster (Laveen + students + feedback from all of us)
- | JEF physics poster (Laveen)
- Analysis/Simulation