Difference between revisions of "JEF meeting, April 12, 2024"
From GlueXWiki
(→Agenda) |
|||
Line 15: | Line 15: | ||
* '''Ongoing projects''' | * '''Ongoing projects''' | ||
** - Bundling short cables (groups of 7, 7, and 6 cables): signal (done), HV (done), LV (29 layers done, waiting for cables) | ** - Bundling short cables (groups of 7, 7, and 6 cables): signal (done), HV (done), LV (29 layers done, waiting for cables) | ||
− | ** - Testing, labeling, and bundling LV cables [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/ | + | ** - Testing, labeling, and bundling LV cables [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/04_12_2024/cable_box1.jpg] [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/03_21_2024/cable_bundls2.jpg] |
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George / Mindy | * '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George / Mindy | ||
** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx] | ** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx] |
Revision as of 09:21, 12 April 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables - done
- - signal patch panel [1] - done
- - HV short cables: received, checked, labeled (last week)
- - HV long cable, 18 ready (out of 36)
- - HV distribution boards: in preparation
- - LV cables: waiting for about 440 cables (will need to test, label, and bundle)
- - LV distribution boards [2]. Have to populate with connectors, and design a box around the PCB
- Ongoing projects
- Testing of PMT dividers -- Sasha / Vlad / George / Mindy
- - Testing procedure [5]
- - Mindy has finished with preparing all sockets (~1650) !
- - All dividers have been fabricated
- - Need to remove power regulators on about 200 dividers
- - George has tested about 1400 dividers [6].
- - Adding ECAL (and updating FCAL) translation table in the TT.DB (needed for EPICS scalers)
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- All ePASes are ready for the installation -- Sasha and Vlad
- - need to prepare one for testing dividers and maintenance
- Installation of the LMS
- 1325 fibers have been installed [7]
- Cable and divider installation [8][9][10]
- Bundles with optical fibers for the trigger have been installed (Chris, Armen, Mark). Need to install 2 patch panels
- Receive optical network fibers. Will install them as well as the network switch during next week
- 7 VXS controllers can be booted now
- Detector installation page
- Other hardware projects
- --prototype of the ECAL veto counter
- --study shower profile using PS (also transition region between lead tungstate and LG modules (?) )
- All ePASes are ready for the installation -- Sasha and Vlad
- Analysis/Simulation
- FCAL2 poster for open house?
- JEF/ECAL/FCAL poster
- exhibit stand (modules, PMTs, etc.)