Difference between revisions of "JEF meeting, November 3, 2023"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 18: | Line 18: | ||
::: [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_20_2023/parts_for_tac.jpg Parts for TAC][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_20_2023/parts_for_tac1.jpg]. Chris D. and Keith prepared brass straps assemblies. | ::: [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_20_2023/parts_for_tac.jpg Parts for TAC][https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_20_2023/parts_for_tac1.jpg]. Chris D. and Keith prepared brass straps assemblies. | ||
::: [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_20_2023/modules_for_prototype.jpg Modules for prototype (25 are ready)]. All parts are ready to assemble 30 CCAL-style modules. | ::: [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_20_2023/modules_for_prototype.jpg Modules for prototype (25 are ready)]. All parts are ready to assemble 30 CCAL-style modules. | ||
− | + | * - Polished 320 fiber plastic caps, all fibers are ready. Meeting with Stephanie and Tim, 3-D printed a mounting plate to couple with the integrating sphere. | |
** - [https://halldweb.jlab.org/detectors/fcal2/installation/students_2023/list_of_students_2023.xlsx Summer Students (2023) ] | ** - [https://halldweb.jlab.org/detectors/fcal2/installation/students_2023/list_of_students_2023.xlsx Summer Students (2023) ] | ||
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / Aoran / Boaxin | * '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / Aoran / Boaxin |
Revision as of 09:27, 3 November 2023
Meeting time and location:
- 10:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables: all cables are ready. Received 75 long cables. They have been tested, labeled and bundled (will be used to replace FCAL cables removed from the FCAL)
- - signal patch panels are ready [1]
- - HV cables: have received 100 short cables, have been testes and labeled. 320 cables are ready for installation. 36 long cables are in production
- - HV distribution boards: Chris is finalizing design of the distribution board, should order 4 boards soon.
- - LV cables: ordered, lead time unclear
- - LV distribution boards: met with Chris and Stephanie on Monday last week. The design of the LV distribution board has been finalized.
- - Optical fibers: received all
- Ongoing projects -- Sasha, all
- - Testing and labeling cables (Recently labeled cables in boxes)
- - Prepare modules for the TAC and prototypes (using crystals with some imperfections) [2]
- Wrapped crystals
- Parts for TAC[3]. Chris D. and Keith prepared brass straps assemblies.
- Modules for prototype (25 are ready). All parts are ready to assemble 30 CCAL-style modules.
- - Polished 320 fiber plastic caps, all fibers are ready. Meeting with Stephanie and Tim, 3-D printed a mounting plate to couple with the integrating sphere.
- Testing of PMT dividers -- Sasha / Vlad / Aoran / Boaxin
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob
- Light monitoring system
- Plastic caps have been glued to all fibers
- Returning low-quality crystals to SICCAS -- Sasha
- 11 crystals were wrapped and placed into the box; they are ready for shipment to SICCAS [13]
- Analysis/Simulation