=Minutes=
 
=Minutes=
 +
 +
Attendees:  Elliott W, David L, Mark I, Chris C, Simon T, Jeff W, Eugene C, Beni Z, Fernando B, Alex S, Dave D, Elton S, Dave A.
 +
 +
 +
'''FADC125'''
 +
 +
Gerard called in to give a status report on FADC125 development.
 +
 +
* Layout and routing in progress, still much to do.
 +
* Some components still need to be added, some minor circuits still to be designed.
 +
* Back-end mostly done.
 +
* Entire board will be hand-routed, needed due to density, complexity, grounding requirements, and proximity of analog and digital components.
 +
* Mezzanine card not started, but mostly a copy of what's underneath.
 +
* All important circuits have been prototyped.
 +
* Power usage mostly independent of signal rate and amplitude.
 +
* Will have an informal internal design review after first prototype tested.
 +
* Three prototypes will be constructed, should be available in early May.  One month of design to go, one month to fabricate.
 +
* Prototype should suffice for summer FDC and CDC tests.
 +
 +
 +
 +
*

Revision as of 11:13, 5 March 2009

Agenda


Time/Location

1:30 PM Wed 4-Mar-2009 CC F326


To connect by telephone:

1.) dial:

  • 800-377-8846 : US
  • 888-276-7715 : Canada
  • 302-709-8424 : International

2.) enter participant code: 39527048# (remember the "#")


Announcements

Next Meeting

18-Mar-2009 1:30pm CC F326


New Action Items from this Meeting

Minutes

Attendees: Elliott W, David L, Mark I, Chris C, Simon T, Jeff W, Eugene C, Beni Z, Fernando B, Alex S, Dave D, Elton S, Dave A.


FADC125

Gerard called in to give a status report on FADC125 development.

  • Layout and routing in progress, still much to do.
  • Some components still need to be added, some minor circuits still to be designed.
  • Back-end mostly done.
  • Entire board will be hand-routed, needed due to density, complexity, grounding requirements, and proximity of analog and digital components.
  • Mezzanine card not started, but mostly a copy of what's underneath.
  • All important circuits have been prototyped.
  • Power usage mostly independent of signal rate and amplitude.
  • Will have an informal internal design review after first prototype tested.
  • Three prototypes will be constructed, should be available in early May. One month of design to go, one month to fabricate.
  • Prototype should suffice for summer FDC and CDC tests.