Difference between revisions of "JEF meeting, March 3, 2023"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 25: | Line 25: | ||
<!-- *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/11_11_22 Moving modules to the new lab (EEL108)] --> | <!-- *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/11_11_22 Moving modules to the new lab (EEL108)] --> | ||
* '''[[Testing of PMT dividers]]''' -- Sasha / Arshak | * '''[[Testing of PMT dividers]]''' -- Sasha / Arshak | ||
− | ** FCAL2 modules with dividers installed on the CCAL | + | ** FCAL2 modules with dividers installed on the CCAL [https://logbooks.jlab.org/entry/4140983] |
* '''Installation of the FCAL2 detector''' -- Sasha / Arshak | * '''Installation of the FCAL2 detector''' -- Sasha / Arshak | ||
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] |
Revision as of 18:53, 2 March 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation of parts for FCAL2 modules -- Sasha
- Available crystals:
- 1450 (modules)
- 32 (ready for fabrication)
- 40 (installed on CCAL) available on March 20
- (some CCAL crystals from the inner part will not be used for the FCAL2)
- 95 expect to receive from CRYTUR in May [1]
- Total 1617
- Wrapped crystals: 32 (Mindy)
- George (DSG group) finished with disassembling CCAL modules and removing LMS caps
- (work on preshaping of ESR reflectors for CRYTUR)
- Mindy (DSG group) solder wires to sockets (while waiting for crystals)
- Parts. 60 remaining PMT housings and cylinders have been ordered by Tim (should be ready for fabrication in about 2 months)
- Available crystals:
- Module fabrication -- Sasha
- Fabricated modules: Total 1450 (15 modules fabricated since last week)
- Currently available for fabrication: 32
- Fabricated modules: Total 1450 (15 modules fabricated since last week)
- Testing of PMT dividers -- Sasha / Arshak
- FCAL2 modules with dividers installed on the CCAL [2]
- Installation of the FCAL2 detector -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group
- Manpower and division of tasks
- Projects for summer students
- Meeting with the detector imaging group
- Light Monitoring System -- Arshak
- Simulations/Analysis