Difference between revisions of "Π polarizability Meeting Apr 27, 2022"
From GlueXWiki
(→Preliminary Agenda) |
(→Preliminary Agenda) |
||
Line 59: | Line 59: | ||
#* Please volunteer to fill Run Coordinator positions during the run. [Jun 8-22: Alexandre Deur, Jun 22-29: Mark Dalton, Jun 29-Jul 6: Beni, Jul 6-13: Open, Jul 13-20: Elton, Jul 20-27: Open] | #* Please volunteer to fill Run Coordinator positions during the run. [Jun 8-22: Alexandre Deur, Jun 22-29: Mark Dalton, Jun 29-Jul 6: Beni, Jul 6-13: Open, Jul 13-20: Elton, Jul 20-27: Open] | ||
# Action Items | # Action Items | ||
− | # CPP-NPP Trigger (Sasha will try to connect; | + | # CPP-NPP Trigger (Sasha will try to connect; see message below) |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
# [[CPP and NPP Run Conditions]] | # [[CPP and NPP Run Conditions]] | ||
# Photon beam / tagger / diamonds | # Photon beam / tagger / diamonds | ||
# Software/Calibration, Simulations | # Software/Calibration, Simulations | ||
+ | #* [[CPP DAQ/Monitoring Test Spring 2022]] | ||
# MWPC Testing | # MWPC Testing | ||
#* [https://logbooks.jlab.org/book/hdfmwpc FMWPC Log Book] | #* [https://logbooks.jlab.org/book/hdfmwpc FMWPC Log Book] | ||
Line 82: | Line 72: | ||
# Other business | # Other business | ||
# Next meeting | # Next meeting | ||
+ | |||
+ | |||
+ | Message from Sasha: | ||
+ | In brief: | ||
+ | |||
+ | I made some progress with the trigger. Hai had to fix some firmware issues, the new | ||
+ | firmware version was installed. Eventually I was able to get TOF triggers from the detector | ||
+ | (and saw associated hits). I am working on the trigger configuration now. | ||
+ | |||
+ | I will need a NIM signal (from Beni) with the hit coincidence from the newly installed paddles. | ||
+ | |||
+ | We had a lot of issues with FADCs. I've replaced several modules | ||
+ | https://logbooks.jlab.org/entry/3991809 | ||
+ | (there are still some minor issues, I am going to fix them during this week). | ||
== Minutes == | == Minutes == | ||
Present: | Present: |
Revision as of 07:31, 27 April 2022
09:30 EST (JLab time) Weekly Meeting
REMOTE during Covid-19
Connecting
Join ZoomGov Meeting
https://jlab-org.zoomgov.com/j/1608628791?pwd=bXhtZjdNRi8xeXZqWFh5T1R3TDBFdz09
Meeting ID: 160 862 8791
Passcode: CPP
Elton Smith is inviting you to a scheduled ZoomGov meeting. Topic: CPP Weekly Meeting Time: This is a recurring meeting Meet anytime Join ZoomGov Meeting https://jlab-org.zoomgov.com/j/1608628791?pwd=bXhtZjdNRi8xeXZqWFh5T1R3TDBFdz09 Meeting ID: 160 862 8791 Passcode: CPP One tap mobile +16692545252,,1608628791# US (San Jose) +16468287666,,1608628791# US (New York) Dial by your location +1 669 254 5252 US (San Jose) +1 646 828 7666 US (New York) +1 669 216 1590 US (San Jose) +1 551 285 1373 US 833 568 8864 US Toll-free Meeting ID: 160 862 8791 Find your local number: https://jlab-org.zoomgov.com/u/acZK7hDWFf Join by SIP 1608628791@sip.zoomgov.com Join by H.323 161.199.138.10 (US West) 161.199.136.10 (US East) Meeting ID: 160 862 8791 Passcode: 112160
Action Items
- Check with Justin about loading translation table into ccdb. (Beni)
- Produce vertex distributions using MC to verify the software is be available for full/empty target commissioning (Andrew)
Preliminary Agenda
- Previous CPP meeting: Apr 20, 2022
- Previous CPP Software meeting: Π polarizability Software Meeting Apr 21, 2022
- Announcements
- GlueX Collaboration Meeting May 23-26 (Tue - software/tutiorials, Wed-Thu)
- Run Coordinator Meetings start tomorrow on a weekly basis
- Please volunteer to fill Run Coordinator positions during the run. [Jun 8-22: Alexandre Deur, Jun 22-29: Mark Dalton, Jun 29-Jul 6: Beni, Jul 6-13: Open, Jul 13-20: Elton, Jul 20-27: Open]
- Action Items
- CPP-NPP Trigger (Sasha will try to connect; see message below)
- CPP and NPP Run Conditions
- Photon beam / tagger / diamonds
- Software/Calibration, Simulations
- MWPC Testing
- CPP and NPP Experiment Configuration
- DAQ and Electronic Setup (Sergey and Beni)
- Documentation (Elton and Simon)
- Other business
- Next meeting
Message from Sasha:
In brief: I made some progress with the trigger. Hai had to fix some firmware issues, the new firmware version was installed. Eventually I was able to get TOF triggers from the detector (and saw associated hits). I am working on the trigger configuration now. I will need a NIM signal (from Beni) with the hit coincidence from the newly installed paddles. We had a lot of issues with FADCs. I've replaced several modules https://logbooks.jlab.org/entry/3991809 (there are still some minor issues, I am going to fix them during this week).
Minutes
Present: